| Firm | Filings | Most Recent |
|---|---|---|
| SUNG HO SHIN ARCHITECT, PC | 3 | 03/26/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/26/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2025 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2025 | — | — | Concrete, Masonry, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2025 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/13/2025 | Air barrier - visual inspection | — | energy_progress |
| 03/13/2025 | Permanent certificate | — | energy_progress |
| 03/13/2025 | Fenestration air leakage | — | energy_progress |
| 03/13/2025 | Ventilation and air distribution system | — | energy_progress |
| 03/13/2025 | Interior lighting power | — | energy_progress |
| 03/13/2025 | Insulation placement and R values | — | energy_progress |
| 03/13/2025 | Electric vehicle service equipment requirements | — | energy_progress |
| 03/13/2025 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 03/13/2025 | Exterior lighting power | — | energy_progress |
| 03/13/2025 | Fenestration areas | — | energy_progress |
| 03/13/2025 | Lighting controls | — | energy_progress |
| 01/09/2025 | Fire-Resistance Rated Construction | — | progress |
| 01/09/2025 | Structural Wood Frame | — | progress |
| 01/09/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 01/09/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 01/09/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 01/09/2025 | Mechanical Systems | — | special |
| 01/09/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 01/09/2025 | Concrete - Cast-In-Place | — | special |
| 01/09/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 01/09/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 01/09/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 01/09/2025 | Subgrade Inspections | — | special |
| 01/09/2025 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 01/09/2025 | Masonry | — | special |