← Back
Miscellaneous two family
47 3 PLACE
BROOKLYN · BIN 3005318
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R6BZoning
1,952 sfGross Floor Area
2Units
Miscellaneous two family · 1,275 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Roof1p · 1 filing · 5 docs
Floor 32p · 1 filing · 15 docs
Floor 21p · 1 filing · 15 docs
Floor 12p · 1 filing · 15 docs
Cellar2p · 1 filing · 15 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/25/2025$3.9M—Private party → Private party$1,977/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANZ CONSULTING ENGINEERING, PLLC311/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC PAINTING CONTRACTING*General Contractor707/08/2026
FALCON HOLDING CORPGeneral Contractor507/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANZ CONSULTING ENGINEERIN3946211/15/2021
INTEGRITY CONSULTING SERV666110/06/2021
Building Lifecycle
All (21)Filed (3)Permit Issued (6)Signed Off (2)Special Inspection (10)
05/03/2022
Signed off — Alteration
EXTERIOR ROOFTOP INSTALLATION OF HVAC UNITS AND ASSOCIATED DUCTWORK, PIPING THERMOSTAT AND REQUIRED COMPONENTS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00582216-I1
05/03/2022
Signed off — Alteration
EXTERIOR ROOFTOP INSTALLATION OF NEW STEEL DUNNAGE. MINOR INTERIOR RENOVATION WITH REMOVAL OF SELECTED PORTIONS OF INTERIOR WALL AND FINISHES FOR PENETRATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00582211-I1
11/15/2021
Filed — Alteration
EXTERIOR ROOFTOP INSTALLATION OF HVAC UNITS AND ASSOCIATED DUCTWORK, PIPING THERMOSTAT AND REQUIRED COMPONENTS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00582216-P1
11/15/2021
Permit issued — Mechanical Systems
B00582216-I1-MS
11/15/2021
Permit issued — General Construction
B00582211-I1-ST
11/15/2021
Permit issued — General Construction
B00582211-I1-GC
11/05/2021
Special inspection requirement — Shutoff dampers
ALBERT ZIRINO
11/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
11/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
11/05/2021
Special inspection requirement — Mechanical Systems
ALBERT ZIRINO
11/05/2021
Special inspection requirement — Energy Code Compliance Inspections
ALBERT ZIRINO
11/05/2021
Special inspection requirement — Final
ALBERT ZIRINO
11/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
11/05/2021
Special inspection requirement — Maintenance information
ALBERT ZIRINO
10/21/2021
Permit issued — General Construction
B00582211-I1-GC
10/20/2021
Permit issued — General Construction
B00582211-I1-ST
10/20/2021
Permit issued — Mechanical Systems
B00582216-I1-MS
10/06/2021
Filed — Alteration
EXTERIOR ROOFTOP INSTALLATION OF HVAC UNITS AND ASSOCIATED DUCTWORK, PIPING THERMOSTAT AND REQUIRED COMPONENTS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00582216-I1
10/06/2021
Filed — Alteration
EXTERIOR ROOFTOP INSTALLATION OF NEW STEEL DUNNAGE. MINOR INTERIOR RENOVATION WITH REMOVAL OF SELECTED PORTIONS OF INTERIOR WALL AND FINISHES FOR PENETRATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00582211-I1
09/08/2021
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
08/24/2021
Special inspection requirement — Final
ALBERT ZIRINO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNYC PAINTING CONTRACTING*11/15/2021
DOB NOWGeneral ConstructionSigned-offNYC PAINTING CONTRACTING*11/15/2021
DOB NOWGeneral ConstructionSigned-offNYC PAINTING CONTRACTING*11/15/2021
DOB NOWGeneral ConstructionSigned-offFALCON HOLDING10/21/2021
DOB NOWGeneral ConstructionSigned-offFALCON HOLDING10/20/2021
DOB NOWMechanical SystemsSigned-offFALCON HOLDING10/20/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/05/2021Shutoff dampersALBERT ZIRINOenergy_progress
11/05/2021HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
11/05/2021HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
11/05/2021Mechanical SystemsALBERT ZIRINOspecial
11/05/2021Energy Code Compliance InspectionsALBERT ZIRINOprogress
11/05/2021FinalALBERT ZIRINOprogress
11/05/2021HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
11/05/2021Maintenance informationALBERT ZIRINOenergy_progress
09/08/2021Structural Steel - DetailsALEKSANDR LEVINspecial
08/24/2021FinalALBERT ZIRINOprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00582211-I1Request digital key ↗
08/31/2026B00582216-P1Request digital key ↗
08/31/2026B00582216-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B00582216-P1Open ↗
09/02/2026B00582216-P1Open ↗
09/02/2026B00582216-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00582211-I1Open ↗
08/31/2026B00582216-P1Open ↗
08/31/2026B00582216-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00582216-P1Open ↗
08/22/2026B00582211-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00582211-I1Open ↗
08/31/2026B00582216-P1Open ↗
08/31/2026B00582216-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00582216-I1Open ↗