← Back
Cape Cod
47-35 GLENWOOD STREET
QUEENS · BIN 4171650
💬 Discuss this project
1945Year Built
1.67Stories
A0Building Class
R1-2Zoning
1,096 sfGross Floor Area
1Units
Cape Cod · 4,000 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2024$1.3M—— → —$1,147/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNG HO SHIN ARCHITECT, PC706/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MHR LALIA CONSTRUCTION COGeneral Contractor304/09/2026
MPS PLUMBING & HEATING INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FC CONSULTING ENGINEER,PL1958606/04/2026
IP CONCRETE TESTING AND I6252209/29/2025
Building Lifecycle
All (104)Filed (7)Permit Issued (4)Signed Off (1)Inspection (5)Objection (64)Special Inspection (23)
08/20/2026
Signed off — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-S1
06/04/2026
Filed — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-P4
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frantz Camulaire
04/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/29/2025
Filed — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-P3
12/21/2025
Special inspection requirement — Concrete - Cast-In-Place
Frantz Camulaire
12/21/2025
Special inspection requirement — Mechanical Systems
Frantz Camulaire
12/21/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frantz Camulaire
12/21/2025
Special inspection requirement — Chimneys and vents
Frantz Camulaire
12/21/2025
Special inspection requirement — Masonry
Frantz Camulaire
12/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Structural Steel - Details
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Final
Frantz Camulaire
12/21/2025
Special inspection requirement — Permanent certificate
Frantz Camulaire
12/21/2025
Special inspection requirement — Fenestration air leakage
Frantz Camulaire
12/21/2025
Special inspection requirement — Maintenance information
Frantz Camulaire
12/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Frantz Camulaire
12/21/2025
Special inspection requirement — Interior lighting power
Frantz Camulaire
12/21/2025
Special inspection requirement — Insulation placement and R values
Frantz Camulaire
12/21/2025
Special inspection requirement — Lighting controls
Frantz Camulaire
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frantz Camulaire
10/31/2025
Objection resolved — Addressed
10/14/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Scope
10/09/2025
Objection raised — Admin
09/29/2025
Filed — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-P2
09/29/2025
Filed — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-P1
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frantz Camulaire
07/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2025
Permit issued — Plumbing
Q01170806-S1-PL
05/28/2025
Permit issued — General Construction
Q01170806-I1-ST
05/21/2025
Permit issued — Mechanical Systems
Q01170806-I1-MS
05/20/2025
Permit issued — Mechanical Systems
Q01170806-I1-GC
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Structural
05/12/2025
Objection raised — Admin
05/12/2025
Objection raised — Structural
05/12/2025
Objection raised — Structural
05/12/2025
Objection raised — Structural
05/12/2025
Objection raised — Admin
05/12/2025
Objection raised — Inspections
05/01/2025
Filed — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-S3
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/26/2025
Objection raised — Other
03/26/2025
Objection raised — Zoning
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN06/30/2025
DOB NOWGeneral ConstructionPermit IssuedMHR LALIA CONSTRUCTION CO05/28/2025
DOB NOWMechanical SystemsPermit IssuedMHR LALIA CONSTRUCTION CO05/21/2025
DOB NOWMechanical SystemsSigned-offMHR LALIA CONSTRUCTION CO05/20/2025
BISPLISSUEDCHINATOWN PLBG & HTG INC11/24/1999
BIS—ISSUEDHIP HING CONT INC09/23/1999
1 project · most recent 06/04/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/04/2026Permit IssuedMHR LALIA CONSTRUCTION COAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems
Cooling
York YC348E2S11A YC360E2S11A 57,000 BTU ×4
Heat / Cool
York Y91E120D20SMPS1A 114,000 BTU · Furnace ×2
Heating
York JHE48C5CG2SS1A 1,600 CFM ×2
__Junk__ GWI-058-N-T 58,000 BTU ×2
1 project · most recent 06/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/04/2026Signed-offMPS PLUMBING & HEATING INGas, Water/Sanitary
1 project · most recent 06/04/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/04/2026Signed-offMPS PLUMBING & HEATING INSteel, Concrete, Masonry, Wood
1 project · most recent 06/04/2026
Fence
FiledStatusContractorScope
06/04/2026Signed-offMPS PLUMBING & HEATING INFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/27/2026Fire-Resistant Penetrations and JointsFrantz Camulairespecial
12/21/2025Concrete - Cast-In-PlaceFrantz Camulairespecial
12/21/2025Mechanical SystemsFrantz Camulairespecial
12/21/2025Excavations - Sheeting, Shoring, and BracingINDARDEO PARBHUNATHspecial
12/21/2025Fire-Resistant Penetrations and JointsFrantz Camulairespecial
12/21/2025Chimneys and ventsFrantz Camulairespecial
12/21/2025MasonryFrantz Camulairespecial
12/21/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
12/21/2025Structural Steel - DetailsINDARDEO PARBHUNATHspecial
12/21/2025FinalFrantz Camulaireprogress
12/21/2025Permanent certificateFrantz Camulaireenergy_progress
12/21/2025Fenestration air leakageFrantz Camulaireenergy_progress
12/21/2025Maintenance informationFrantz Camulaireenergy_progress
12/21/2025Fenestration and door U-factor and product ratingsFrantz Camulaireenergy_progress
12/21/2025Interior lighting powerFrantz Camulaireenergy_progress
12/21/2025Insulation placement and R valuesFrantz Camulaireenergy_progress
12/21/2025Lighting controlsFrantz Camulaireenergy_progress
12/19/2025Fire-Resistant Penetrations and JointsFrantz Camulairespecial
09/26/2025Fire-Resistant Penetrations and JointsFrantz Camulairespecial
02/28/2025Concrete - Cast-In-Place—special
02/28/2025Subgrade Inspections—special
02/28/2025Final—progress
02/28/2025Footing and Foundation—progress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/16/2026Q01170806-P4Request digital key ↗
08/16/2026Q01170806-P1Request digital key ↗
08/16/2026Q01170806-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01170806-P2Open ↗
08/13/2026Q01170806-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026Q01170806-P3Open ↗
08/16/2026Q01170806-P2Open ↗
08/16/2026Q01170806-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/29/2026Q01170806-P4Open ↗
09/19/2026Q01170806-P3Open ↗
09/01/2026Q01170806-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01170806-I1Open ↗
09/01/2026Q01170806-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/16/2026Q01170806-P4Open ↗
08/16/2026Q01170806-P3Open ↗
08/16/2026Q01170806-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026Q01170806-I1Open ↗
08/13/2026Q01170806-P2Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q01170806-I1Open ↗
08/13/2026Q01170806-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01170806-I1Open ↗
▸Other Documents8
▸DOB NOWPlot Diagram3
08/13/2026Q01170806-I1Open ↗
08/13/2026Q01170806-P2Open ↗
08/13/2026Q01170806-S3Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01170806-P2Open ↗
08/13/2026Q01170806-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01170806-P2Open ↗
08/13/2026Q01170806-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01170806-I1Open ↗