← Back
BuildNYC
Cape Cod
47-35 GLENWOOD STREET
QUEENS · BIN 4171650
💬 Discuss this project
1945Year Built
1.67Stories
A0Building Class
R1-2Zoning
1,096 sfGross Floor Area
1Units
Cape Cod · 4,000 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Proposed horizontal addition10p · 1 filing · 20 docs
Floor 1Proposed horizontal addition7p · 1 filing · 20 docs
CellarProposed horizontal addition10p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2024$1.3M—Private party → Private party$1,147/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sung Ho Shin Architect706/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MHR Lalia ConstructionGeneral Contractor204/09/2026
MHR Lalia Constructionspecialty_contractor104/09/2026
MPS Plumbing & HeatingPlumbing106/28/2026
Chinatown Plumbing & HeatingPlumbing111/24/1999
Hip Hing ContGeneral Contractor109/23/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FC Consulting Engineer1958606/04/2026
IP Concrete Testing and I6252209/29/2025
Building Lifecycle
08/20/2026
Signed off — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-S1
06/04/2026
Filed — Alteration
PROPOSED NEW HORIZONTAL ADDITION, NEW BATHROOMS RENOVATION, NEW KITCHEN RENOVATION, AND EXISTING FIREPLACE AND CHIMNEY TO BE REMOVED. REPLACE HOT WATER HEATER AND FURNACE. NEW 2 CONDENSERS OUTSIDE.
Q01170806-P4
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frantz Camulaire
04/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
73 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMPS Plumbing & Heating06/30/2025
DOB NOWEarth WorkPermit IssuedMHR Lalia Construction05/28/2025
DOB NOWGeneral ConstructionPermit IssuedMHR Lalia Construction05/21/2025
DOB NOWMechanical SystemsSigned-offMHR Lalia Construction05/20/2025
BISPLISSUEDChinatown Plumbing & Heating11/24/1999
BIS—ISSUEDHip Hing Cont09/23/1999
1 project · most recent 06/04/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScope
06/04/2026Permit IssuedMHR Lalia ConstructionAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems
1 project · most recent 06/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/04/2026Signed-offMPS Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 06/04/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/04/2026Signed-offMPS Plumbing & HeatingSteel, Concrete, Masonry, Wood
1 project · most recent 06/04/2026
Fence
FiledStatusContractorScope
06/04/2026Signed-offMPS Plumbing & HeatingFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/27/2026Fire-Resistant Penetrations and JointsFrantz Camulairespecial
12/21/2025Mechanical SystemsFrantz Camulairespecial
12/21/2025Excavations - Sheeting, Shoring, and BracingINDARDEO PARBHUNATHspecial
12/21/2025Fire-Resistant Penetrations and JointsFrantz Camulairespecial
12/21/2025Chimneys and ventsFrantz Camulairespecial
12/21/2025MasonryFrantz Camulairespecial
12/21/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
12/21/2025Structural Steel - DetailsINDARDEO PARBHUNATHspecial
12/21/2025FinalFrantz Camulaireprogress
12/21/2025Permanent certificateFrantz Camulaireenergy_progress
12/21/2025Fenestration air leakageFrantz Camulaireenergy_progress
12/21/2025Maintenance informationFrantz Camulaireenergy_progress
12/21/2025Fenestration and door U-factor and product ratingsFrantz Camulaireenergy_progress
12/21/2025Interior lighting powerFrantz Camulaireenergy_progress
12/21/2025Insulation placement and R valuesFrantz Camulaireenergy_progress
12/21/2025Lighting controlsFrantz Camulaireenergy_progress
12/21/2025Concrete - Cast-In-PlaceFrantz Camulairespecial
12/19/2025Fire-Resistant Penetrations and JointsFrantz Camulairespecial
09/26/2025Fire-Resistant Penetrations and JointsFrantz Camulairespecial
02/28/2025Concrete - Cast-In-Place—special
02/28/2025Subgrade Inspections—special
02/28/2025Final—progress
02/28/2025Footing and Foundation—progress
47 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account