← Back
Office with commercial, 1-6 stories
47-37 AUSTELL PLACE
QUEENS · BIN 4000740
💬 Discuss this project
1916Year Built
5Stories
O5Building Class
M1-4Zoning
155,265 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Office with commercial, 1-6 stories · Owner of record: MAPLE DRAKE AUSTELL OWNER, LLC · 40,500 sf lot · 3.83 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof2p · 1 filing · 20 docs
Floor 57p · 1 filing · 20 docs
Floor 47p · 1 filing · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CANNON HILL CAPITAL PARTNERS1407/08/2026
NORMANDY REALTY303/22/2026
MAPLE DRAKE AUSTELL OWNER LLC6403/22/2026
E C CONTRACTING403/22/2026
AUSTELL TEL LLC103/22/2026
CONFRONT AND CO INC103/22/2026
CONFORT 2 COMPANY203/22/2026
TRIERA CONTRACTING303/21/2026
CONFORT1503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/05/2015$35.0M—AUSTELL TEI LLC → MAPLE DRAKE AUSTELL OWNER, LLC$225/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RISE ARCHITECTURE706/16/2025
FLORINELA MURESAN709/28/2023
KIMMERLE NEWMAN ARCHITECTS106/25/2019
JOSE L. PENA,P.E.112/18/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY EXPEDITING2803/21/2026
LOUIS STRIAR203/21/2026
RIZZO GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITYSCAPE BUILDERS LLCGeneral Contractor407/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
Z-CAR-DScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168909/28/2023
Building Lifecycle
All (128)Filed (16)Permit Issued (5)Signed Off (5)Violation (60)Inspection (4)Objection (12)Special Inspection (26)
06/16/2025
Filed — No Work
Q01215844-I1
06/16/2025
Filed — No Work
Q01215837-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S3
10/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/28/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P5
09/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/27/2023
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
09/19/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-I1
09/19/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S1
09/18/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S2
09/14/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P4
09/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/14/2023
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
09/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/14/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
09/14/2023
Special inspection requirement — Final
Soorjbally Harilall
09/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/11/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P3
09/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
SOORJBALLY HARILALL
09/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
09/07/2023
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/07/2023
Special inspection requirement — Final
Soorjbally Harilall
09/07/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
09/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/06/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P2
09/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
09/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/05/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
09/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/17/2023
Objection raised — Other
08/17/2023
Objection raised — Admin
08/17/2023
Objection raised — Inspections
08/17/2023
Objection raised — Admin
08/16/2023
Filed — No Work
Q00905428-I1
08/16/2023
Filed — No Work
Q00905420-P1
08/16/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P1
08/15/2023
Objection resolved — Addressed
08/11/2023
Objection raised — Other
08/10/2023
Filed — No Work
Q00905420-I1
08/01/2023
Permit issued — Mechanical Systems
Q00905085-S2-MS
07/31/2023
Permit issued — Sprinklers
Q00905085-S3-EW-SP
07/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S3
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCITYSCAPE BUILDERS LLC08/01/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/31/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/21/2023
DOB NOWGeneral ConstructionSigned-offCITYSCAPE BUILDERS LLC07/21/2023
DOB NOWSignSigned-offZ-CAR-D CORP12/21/2018
BISPLISSUEDTRISTATE PLBG SVCS CORP09/13/2024
BISPLISSUEDTRISTATE PLBG SVCS CORP09/13/2024
BISPLISSUEDTRISTATE PLBG SVCS CORP08/08/2023
BISPLISSUEDTRISTATE PLBG SVCS CORP07/25/2023
BIS—ISSUEDSUFFOLK CONSTRUCTION COMP06/15/2020
BISSDISSUEDA + SPRINKLER CORP02/26/2020
BISPLISSUEDTRISTATE PLBG SVCS CORP02/18/2020
BISPLISSUEDTRISTATE PLBG SVCS CORP02/18/2020
BISFSISSUEDEAST COAST PETROLEUM INC07/19/2019
BIS—ISSUEDD.F. PRAY, INC07/17/2019
BISOTISSUEDD.F. PRAY, INC07/17/2019
BISOTISSUEDD.F. PRAY, INC07/17/2019
BISOTISSUEDD.F. PRAY, INC07/17/2019
BISOTISSUEDD.F. PRAY, INC07/17/2019
BISMHISSUEDD.F. PRAY, INC04/23/2019
BISOTISSUEDD.F. PRAY, INC04/22/2019
BISOTISSUEDD.F. PRAY, INC04/19/2019
BIS—ISSUEDD.F. PRAY, INC04/19/2019
BISOTISSUEDD.F. PRAY, INC04/19/2019
BISMHISSUEDD.F. PRAY, INC04/19/2019
BISOTISSUEDD.F. PRAY, INC04/12/2019
BISEQISSUEDD.F. PRAY, INC10/15/2018
BISSPISSUEDA + SPRINKLER CORP09/24/2018
BISSDISSUEDA + SPRINKLER CORP09/21/2018
BISPLISSUEDTRISTATE PLBG SVCS CORP07/12/2018
BISPLISSUEDTRISTATE PLBG SVCS CORP07/12/2018
BISOTRE-ISSUEDD.F. PRAY, INC06/25/2018
BISOTISSUEDD.F. PRAY, INC06/25/2018
BISMHISSUEDD.F. PRAY, INC06/25/2018
BISOTISSUEDD.F. PRAY, INC06/25/2018
BISOTISSUEDD.F. PRAY, INC06/25/2018
BISOTISSUEDD.F. PRAY, INC06/25/2018
BISOTISSUEDD.F. PRAY, INC06/25/2018
BIS—ISSUEDD.F. PRAY, INC06/25/2018
BISEQISSUEDD.F. PRAY, INC05/15/2018
+ 15 more permits on file
2 projects · most recent 09/21/2023
General Wiring
FiledStatusContractorScope
09/21/2023CompleteLIGHTFORCE ELECL CONTNG IGeneral Wiring
03/01/2018Permit IssuedMER ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/27/2023Tenant Protection Plan Compliance—special
09/27/2023Sprinkler SystemsSOORJBALLY HARILALLspecial
09/14/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/14/2023Mechanical SystemsSOORJBALLY HARILALLspecial
09/14/2023Tenant Protection Plan Compliance—special
09/14/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/14/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/14/2023Shutoff dampersSoorjbally Harilallenergy_progress
09/14/2023FinalSoorjbally Harilallprogress
09/14/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
09/08/2023Tenant Protection Plan ComplianceSOORJBALLY HARILALLspecial
09/08/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/07/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/07/2023Mechanical SystemsSOORJBALLY HARILALLspecial
09/07/2023Fire-Resistant Penetrations and Joints—special
09/07/2023Tenant Protection Plan Compliance—special
09/07/2023FinalSoorjbally Harilallprogress
09/07/2023Shutoff dampersSoorjbally Harilallenergy_progress
09/07/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/07/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
09/05/2023Tenant Protection Plan Compliance—special
09/05/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/05/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/05/2023Maintenance informationSoorjbally Harilallenergy_progress
09/05/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
Latest 25 of 26.
▾Documents — 699 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch10
08/28/2026Q00104070-I1Request digital key ↗
08/24/2026Q00905085-P1Request digital key ↗
08/24/2026Q00905085-S3Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly6
08/24/2026Q00905420-I1Request digital key ↗
08/24/2026Q00905428-I1Request digital key ↗
08/20/2026Q01215837-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits181
▸BISPLAN / WORK APPROVAL APPLICATION104
10/16/2023420658577Open ↗
10/16/2023421380696Open ↗
09/12/2023420658577Open ↗
Showing 3 of 104 on file for this type
▸BISWORK PERMIT APPLICATION76
10/24/2023420658577Open ↗
10/11/2023421380696Open ↗
06/22/2020420658577Open ↗
Showing 3 of 76 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
08/22/2023420658577Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/21/2023420658577Open ↗
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications111
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
11/05/2020421543949Open ↗
11/05/2020421543949Open ↗
06/29/2020421454795Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00104070-I1Open ↗
08/28/2026Q00184157-I1Open ↗
08/24/2026Q00905428-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00905085-P4Open ↗
09/01/2026Q00905085-P4Open ↗
08/30/2026Q00905085-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00905085-P4Open ↗
08/31/2026Q00905085-S1Open ↗
08/31/2026Q00905085-S1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING20
09/12/2023420658577Open ↗
08/23/2023421380696Open ↗
08/21/2023421380696Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS5
06/09/2025421380696Open ↗
12/04/2024421380696Open ↗
09/07/2022420658577Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
06/09/2025421380696Open ↗
06/09/2025421380696Open ↗
09/06/2022420658577Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/21/2023420658577Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
09/23/2021420658577Open ↗
12/21/2020421373864Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026Q00104070-I1Open ↗
08/24/2026Q00905085-S3Open ↗
08/24/2026Q00905085-S2Open ↗
Showing 3 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
10/07/2021421393003Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
06/29/2020421454795Open ↗
09/11/2019421358257Open ↗
09/11/2019421358257Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/25/2020420658577Open ↗
08/25/2020420658577Open ↗
07/09/2020421380696Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/15/2020421543949Open ↗
06/29/2020421454795Open ↗
09/11/2019421358257Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
07/09/2020421380696Open ↗
07/09/2020420658577Open ↗
06/10/2020421932564Open ↗
▸Inspections & Test Reports57
▸BISTECHNICAL REPORT: RESPONSIBILITY32
08/27/2020421543949Open ↗
08/25/2020421543949Open ↗
08/15/2020421543949Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER10
09/23/2021420658577Open ↗
09/23/2021420658577Open ↗
09/23/2021420658577Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE2
07/13/2020420658577Open ↗
06/29/2020420658577Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
09/21/2023421380696Open ↗
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
12/06/2024421380696Open ↗
10/07/2021421393003Open ↗
01/26/2021420658577Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/24/2026Q00905085-P1Open ↗
08/24/2026Q00905085-S3Open ↗
08/24/2026Q00905085-S2Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
03/09/2020420658577Open ↗
Showing 1 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
12/21/2020421373864Open ↗
02/18/2020440348134Open ↗
Showing 2 of 10 on file for this type
▸BISSUPERSEDING LETTER9
06/22/2020420658577Open ↗
06/22/2020420658577Open ↗
Showing 2 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT30
09/28/2021420658577Open ↗
08/27/2020421543949Open ↗
06/29/2020421454795Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
08/23/2023421455981Open ↗
08/23/2023421380696Open ↗
10/01/2021421393003Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/01/2019420658577Open ↗
Showing 1 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: ENGINEERS AFFIDAVIT1
12/21/2020421373864Open ↗
▸Filing & Intake Forms91
▸BISADDITIONAL INFORMATION51
09/28/2023420658577Open ↗
09/13/2023421380696Open ↗
01/25/2021421380696Open ↗
Showing 3 of 51 on file for this type
▸BISEFILING COVER SHEET24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISBOROUGH INTAKE FORM12
10/24/2023420658577Open ↗
06/29/2020420658577Open ↗
06/22/2020420658577Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
09/23/2021420658577Open ↗
09/23/2021420658577Open ↗
Showing 2 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/21/2020421373864Open ↗
12/21/2020421373864Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
12/21/2020421373864Open ↗