← Back
BuildNYC
Predominantly retail with other uses
47 CHRYSTIE STREET
MANHATTAN · BIN 1003916
💬 Discuss this project
1917Year Built
2Stories
K4Building Class
C6-1GZoning
17,932 sfGross Floor Area
5Units
9 Active Violations 7 unresolved · 2 paperwork only 20 likely answered ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: Thuan Tam Realty · 7,607 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 22 filings
Floor 12 filings
Cellar2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Thuan Tam Realty2511/11/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Christopher Teeter511/10/2026
Roman Mardarewich111/03/2025
Li Architect Associate104/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Christopher Teeter RA803/21/2026
Metamechanics Architecture203/21/2026
Li Architect Associate203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Demar PlumbingPlumbing203/21/2026
SDC ContractGeneral Contractor209/09/2026
Hongtai ConstructionGeneral Contractor103/21/2026
Safepipe PlumbingPlumbing109/03/2026
Kimco Painting and ConstructionGeneral Contractor104/09/2026
NY FireFire Protection103/21/2026
KTC Design GroupGeneral Contractor106/18/2019
Rock ScaffoldingGeneral Contractor109/28/2009
Roing Yip ConstructionGeneral Contractor210/23/1997
Wood SpiritGeneral Contractor211/10/2009
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ramirez Engineering8679311/10/2026
Building Lifecycle
11/10/2026
Filed — Alteration CO
INSTALLATION OF LU/LA LIFT FROM 1ST TO 2ND FLOOR. CONVERSION OF CELLAR AND 2ND FLOOR SPACES TO ASSEMBLY. ADDITIONAL BATHROOMS AND LU/LA LIFT. NO CHANGE TO ROOF OCCUPANCY.
M01279609-P1
10/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Teeter
10/27/2026
Special inspection requirement — Final
Amauris Ramirez
10/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Amauris Ramirez
10/27/2026
Special inspection requirement — Masonry
Amauris Ramirez
175 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—SDC Contract—
DOB NOW—Safepipe Plumbing—
DOB NOW—SDC Contract—
DOB NOW—Kimco Painting and Construction—
BIS—KTC Design Group—
BIS—Hongtai Construction—
BIS—NY Fire—
BIS—Wood Spirit—
BIS—Wood Spirit—
BIS—Rock Scaffolding—
BIS—Demar Plumbing—
BIS—Demar Plumbing—
BIS—Roing Yip Construction—
BIS—Roing Yip Construction—
Nothing on file for this building.
Nothing on file for this building.
121 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account