← Back
Two family frame
47 IRVING PLACE
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5175203
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3AZoning
2,525 sfGross Floor Area
2Units
Two family frame · 3,800 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 21p · 1 filing · 2 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DONATO1507/08/2026
CLAWSON303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI301/06/2022
A TECH ENGINEERING NYC, PLLC.107/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADONIA DEVELOPMENT CORPGeneral Contractor207/08/2026
DONATO, INCPlumbing207/08/2026
CATELLO ELEC'L CONT., INCElectrical103/22/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
Building Lifecycle
All (23)Filed (4)Permit Issued (5)Signed Off (4)Inspection (9)Special Inspection (1)
05/26/2022
Signed off — Alteration
Installation of new fire sprinkler system with valves and meters for same.
S00554858-I1
05/26/2022
Signed off — Alteration
S00565646-I1
05/23/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2022
Signed off — Alteration
8 FOOT CONSTRUCTION FENCE FOR 47 IRVING PLACE HOUSE AND GARAGE DEMOLITION AND NEW BUILDINGS ON SUBDIVIDED LOTS 11, 12, 13 & 14
S00386553-I1
04/28/2022
Signed off — Alteration
10' CURB CUT NORTH SIDE OF IRVING PLACE TOWARDS TARGEE STREET
S00561963-I1
04/05/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/30/2022
Permit issued — Curb Cut
S00561963-I1-CC
03/09/2022
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/07/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
02/01/2022
Permit issued — Plumbing
S00554858-I1-PL
01/06/2022
Filed — Alteration
10' CURB CUT NORTH SIDE OF IRVING PLACE TOWARDS TARGEE STREET
S00561963-I1
12/13/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/06/2021
Permit issued — Construction Fence
S00386553-I1-FN
08/17/2021
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/11/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/06/2021
Permit issued — Plumbing
S77158845-I1-PL
07/29/2021
Permit issued — Plumbing
S00565646-I1-PL
07/28/2021
Filed — Alteration
S00565646-I1
07/12/2021
Filed — Alteration
Installation of new fire sprinkler system with valves and meters for same.
S00554858-I1
10/26/2020
Filed — Alteration
8 FOOT CONSTRUCTION FENCE FOR 47 IRVING PLACE HOUSE AND GARAGE DEMOLITION AND NEW BUILDINGS ON SUBDIVIDED LOTS 11, 12, 13 & 14
S00386553-I1
08/18/2020
Special inspection requirement — Final
James Morri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMADONIA DEVELOPMENT CORP03/30/2022
DOB NOWPlumbingSigned-offDONATO, INC02/01/2022
DOB NOWConstruction FenceSigned-offMADONIA DEVELOPMENT CORP10/06/2021
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/06/2021
DOB NOWPlumbingSigned-offDONATO, INC07/29/2021
BIS—ISSUEDMADONIA DEVELOPMENT CORP01/27/2022
BIS—ISSUEDMADONIA DEVELOPMENT CORP07/15/2021
1 project · most recent 01/12/2022
General Wiring
FiledStatusContractorScope
01/12/2022CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
03/09/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/07/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/13/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/17/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/11/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/18/2020FinalJames Morriprogress
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/25/2026S00554858-I1Request digital key ↗
08/25/2026S00565646-I1Request digital key ↗
08/24/2026S00561963-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026S00386553-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
06/02/2022540193422Open ↗
05/31/2022540193422Open ↗
06/16/2021540193422Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/14/2022540193422Open ↗
▸BISWORK PERMIT APPLICATION1
07/15/2021540193422Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/23/2020540193422Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/25/2021540193422Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/28/2022540193422Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/05/2022540193422Open ↗
▸BISVERIFY TAX LOT1
04/04/2022540193422Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/25/2021540193422Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/04/2022540193422Open ↗
▸BISZONING DIAGRAM1
06/22/2021540193422Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/18/2022540193422Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026S00386553-I1Open ↗
08/25/2026S00554858-I1Open ↗
08/25/2026S00565646-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/23/2020540193422Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/23/2020540193422Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/16/2021540193422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/23/2020540193422Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026S00386553-I1Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
04/04/2022540193422Open ↗
12/23/2020540193422Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/12/2022540193422Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/12/2022540193422Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
12/23/2020540193422Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/05/2022540193422Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/05/2022540193422Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREES SITE PLAN1
04/04/2022540193422Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/07/2021540193422Open ↗
▸BISSTREET TREE SIGNOFF1
04/28/2022540193422Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/15/2021540193422Open ↗
07/07/2021540193422Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/12/2022540193422Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/12/2022540193422Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/12/2022540193422Open ↗
▸BISFENESTRATION AREAS1
04/12/2022540193422Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
04/12/2022540193422Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/12/2022540193422Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/12/2022540193422Open ↗
▸BISLIGHTING CONTROLS1
04/12/2022540193422Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/12/2022540193422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/23/2020540193422Open ↗
▸Inspections & Test Reports8
▸BISDEMOLITION (DM) JOB SIGNOFF1
07/12/2021540193422Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/12/2022540193422Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
04/12/2022540193422Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/14/2022540193422Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/12/2022540193422Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/07/2021540193422Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/12/2022540193422Open ↗
▸BISSOIL REPORT1
12/23/2020540193422Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCURB CUT (CC) SIGNOFF1
04/28/2022540193422Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
06/16/2021540193422Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/23/2020540193422Open ↗
▸Other Documents7
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
04/12/2022540193422Open ↗
▸BISSHUTOFF DAMPERS1
04/12/2022540193422Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/23/2020540193422Open ↗
▸BISMAINTENANCE INFORMATION1
04/12/2022540193422Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
04/12/2022540193422Open ↗
▸BISPERMANENT CERTIFICATE1
04/12/2022540193422Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
04/12/2022540193422Open ↗