← Back
One family attached or semi-detached
47 LAUREL AVENUE
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5135069
💬 Discuss this project
2001Year Built
2Stories
A5Building Class
R3AZoning
1,040 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,783 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT105/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERGY SOLAR INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802105/08/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
06/27/2024
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S01047064-I1
05/20/2024
Permit issued — Solar
S01047064-I1-SL
05/08/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S01047064-I1
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
05/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
05/07/2024
Special inspection requirement — Final
Chun Feng
05/07/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
03/28/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC05/20/2024
BISPLISSUEDAAA PLUMBING & HTNG LLC04/30/2002
BIS—ISSUEDRJT EXCAVATING03/07/2002
1 project · most recent 05/07/2024
FiledStatusContractorScope
05/07/2024CompleteI.P. ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/07/2024Fire-Resistant Penetrations and JointsChun Fengspecial
05/07/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
05/07/2024Energy Code Compliance InspectionsChun Fengprogress
05/07/2024FinalChun Fengprogress
05/07/2024Air barrier - visual inspectionChun Fengenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01047064-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026S01047064-I1Open ↗
09/02/2026S01047064-I1Open ↗
09/02/2026S01047064-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S01047064-I1Open ↗
09/02/2026S01047064-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026S01047064-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01047064-I1Open ↗