← Back
BuildNYC
Two stories - detached, small or mid-size
47 SCHOHARIE STREET
STATEN ISLAND · BIN 5176933
💬 Discuss this project
2025Year Built
2Stories
A1Building Class
R2Zoning
2,022 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: Knox Street Builders · 4,000 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation2p · 1 filing · 8 docs
Floor 213p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Basement13p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect506/09/2026
Parker and West Engineering101/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aprile Bonamo Filing Rep303/21/2026
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Master Built HomesGeneral Contractor804/09/2026
Sunrun Solar ElectlElectrical103/22/2026
Sunrun Installation ServiceGeneral Contractor104/09/2026
Duo Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P Design Consultant8472306/09/2026
Parker and West Engineering5272101/08/2026
Building Lifecycle
07/06/2026
Signed off — New Building
PROPOSED INSTALLATION OF NEW 10'-0" CURB CUT
S01141921-I1
06/16/2026
Special inspection requirement — Wood – Prefabricated I-Joists
Stanislav Pilipenko
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
06/16/2026
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
06/16/2026
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service01/09/2026
DOB NOWCurb CutSigned-offMaster Built Homes11/24/2025
DOB NOWPlumbingSigned-offDuo Plumbing & Heating06/11/2025
DOB NOWMechanical SystemsSigned-offMaster Built Homes05/13/2025
DOB NOWEarth WorkSigned-offMaster Built Homes05/13/2025
DOB NOWEarth WorkSigned-offMaster Built Homes05/13/2025
DOB NOWEarth WorkPermit IssuedMaster Built Homes05/13/2025
DOB NOWGeneral ConstructionSigned-offMaster Built Homes05/13/2025
1 project · most recent 06/09/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/09/2026Signed-offDuo Plumbing & HeatingStorm, Water/Sanitary
2 projects · most recent 01/08/2026
General Wiring
FiledStatusContractorScope
01/08/2026CompleteSunrun Solar Electl—
09/23/2025CompleteB & R Electrical ContractingGeneral Wiring
1 project · most recent 06/09/2026
Concrete Wood
FiledStatusContractorScope
06/09/2026Signed-offMaster Built HomesConcrete, Wood
1 project · most recent 06/09/2026
Earthwork
FiledStatusContractorScope
06/09/2026Signed-offMaster Built HomesEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/03/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
08/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2025Pass-Final PL - UndergroundPassView ↗
06/18/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
06/16/2026Mechanical SystemsStanislav Pilipenkospecial
06/16/2026Wood – Prefabricated I-JoistsStanislav Pilipenkospecial
06/16/2026Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
06/16/2026Concrete - Cast-In-PlaceStanislav Pilipenkospecial
06/16/2026Subgrade InspectionsStanislav Pilipenkospecial
06/16/2026Footing and FoundationStanislav Pilipenkoprogress
06/16/2026Energy Code Compliance InspectionsStanislav Pilipenkoprogress
06/16/2026Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
06/16/2026Structural Wood FrameStanislav Pilipenkoprogress
06/16/2026FinalStanislav Pilipenkoprogress
06/16/2026Insulation placement and R valuesStanislav Pilipenkoenergy_progress
06/16/2026Fenestration areasStanislav Pilipenkoenergy_progress
06/16/2026Air barrier — testing Stanislav Pilipenkoenergy_progress
06/16/2026Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
06/16/2026HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
06/16/2026HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
06/16/2026Permanent certificateStanislav Pilipenkoenergy_progress
06/16/2026Protection of exposed foundation insulationStanislav Pilipenkoenergy_progress
06/16/2026Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
06/16/2026Interior lighting powerStanislav Pilipenkoenergy_progress
06/16/2026Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
06/16/2026Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
06/16/2026Lighting in dwelling unitsStanislav Pilipenkoenergy_progress
06/16/2026HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
06/16/2026Maintenance informationStanislav Pilipenkoenergy_progress
Latest 25 of 86.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account