← Back
Two stories - detached, small or mid-size
47 SOUTH STREET
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5146779
💬 Discuss this project
2006Year Built
2Stories
A1Building Class
R3AZoning
1,404 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,375 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAMY MOUNASElectrical103/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/21/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
01/26/2026
Permit issued — Solar
S01346717-I1-SL
01/21/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01346717-I1
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/21/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/14/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/26/2026
BISPLISSUEDWEST SHORE CONSULTING INC03/15/2006
BIS—ISSUEDM. JORDAN GENERAL CONTRACTING01/25/2006
1 project · most recent 01/21/2026
FiledStatusContractorScope
01/21/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 01/21/2026
FiledStatusContractorScope
01/21/2026Signed-offSUNRUN INSTALLATION SVC36 panels, 14.76 kw, 378.41 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/21/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/21/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
01/14/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/14/2026Energy Code Compliance InspectionsWalid Abdullaprogress
01/14/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01346717-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026S01346717-I1Open ↗
08/27/2026S01346717-I1Open ↗
08/27/2026S01346717-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01346717-I1Open ↗
08/27/2026S01346717-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01346717-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01346717-I1Open ↗