4 Open Violations 0 unresolved · 4 paperwork only▸
ECB12/05/2024FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPECTION OF A PARKING STRUCTURE(PIPS) REPORT DOCUMENTING THE CONDITIONS OF PSID#B000Nothing owed — awaiting certificate of correction
ECB09/15/2006CEASE USE.50A,B,C,D,48B.50A-CARBON MONOXIDE SPILLAGE IN BOILER ROOM FROM BOILER #2 INCOMPLETE COMBUSTION SPILLAGE FROM GASKETS A HIGH READING OF 550 PPM'S.50B-GAUGE GLASS ASSEMBLY MISSING VALVE HANDLENothing owed — awaiting certificate of correction
ECB12/01/200450A/50B CYCLOTHERM DTSM BOILER #2 50A-STEAM PRESSURE GAUGE HAS A DIAL RANGE OF 0-160 PSI SAFTEY VALVE IS SET AT 150 PSI STEAM PRESSURE AUGE MUST BE 0-300 PSI 50B-SAFTEY VALVE DISCHARGE PIPE SYSTEM INCOMPLETENothing owed — awaiting certificate of correction
ECB12/01/200450A/50B CYCLOTHERM FTSM BOILER # 1 50A-STEAM PRESSURE GAUGE HAS A DIALRANGE OF 0-160 PSI SAFTEY VALVE IS SET AT 150PSI STEAM PRESSURE GAUGE MUST BE 0-300 PSI 50B-SAFTEY VALVE DISCHARGE PIPE INCOMPLETENothing owed — awaiting certificate of correction
Factory, industrial, semi-fireproof · Owner of record: JOYVA REALTY LLC · 20,000 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.