← Back
Converted dwellings or rooming house
47 WEST 71 STREET
MANHATTAN · Upper West Side-Lincoln Square · BIN 1028609
💬 Discuss this project
1886Year Built
5Stories
C5Building Class
R8BZoning
4,390 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Converted dwellings or rooming house · Owner of record: 494 EAST 138TH STREET LLC · 1,788 sf lot · 2.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof19p · 1 filing · 20 docs
Floor 518p · 1 filing · 20 docs
Floor 427p · 1 filing · 20 docs
Floor 327p · 1 filing · 20 docs
Floor 227p · 1 filing · 20 docs
Floor 132p · 2 filings · 20 docs
Cellar27p · 1 filing · 20 docs
Sub-Basement12p · 1 filing · 20 docs
Site & exterior5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MBR/MGR3103/22/2026
RELIABLE ENTERPRISES807/08/2026
494 EAST 138TH STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2021$2.8M—47 W 71 LLC → 494 EAST 138TH STREET LLC$627/sf building
11/17/2020$2.3M—S & E REALTY CORP. → 47 W 71 LLC$524/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ORLI ESHKAR ARCHITECT PLLC1007/15/2024
ENTHINK ENGINEERS LLC201/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MENZAK ARCHITECT P C1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYACK SOLAR LLCGeneral Contractor603/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing207/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADJ ENGINEERING PLLC7640311/02/2022
SALAMON ENGINEERING PLLC1264311/02/2022
Building Lifecycle
All (122)Filed (12)Permit Issued (7)Signed Off (2)Violation (60)Inspection (3)Objection (8)Special Inspection (30)
07/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Orli Eshkar
07/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Orli Eshkar
07/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Orli Eshkar
07/15/2024
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-P8
07/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Orli Eshkar
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Orli Eshkar
07/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Orli Eshkar
05/15/2024
Permit issued — Plumbing
M00727268-S1-PL
03/13/2024
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-P7
03/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Orli Eshkar
03/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
Orli Eshkar
03/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
Orli Eshkar
01/11/2024
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-P5
01/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Orli Eshkar
01/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Orli Eshkar
01/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Orli Eshkar
11/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2023
Objection resolved — Addressed
10/19/2023
Objection raised — Scope
10/11/2023
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-P4
10/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
Orli Eshkar
10/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Orli Eshkar
10/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
Orli Eshkar
10/04/2023
Signed off — Alteration
M00818518-I1
10/04/2023
Signed off — Alteration
M00819309-I1
08/10/2023
Permit issued — Plumbing
M00727268-S1-PL
04/11/2023
Permit issued — General Construction
M00727268-I1-GC-CX
03/16/2023
Violation issued (HPD, closed)
A
01/27/2023
Filed — Alteration
M00819309-I1
01/27/2023
Permit issued — Supported Scaffold
M00819309-I1-SF
01/26/2023
Filed — Alteration
M00818518-I1
01/26/2023
Permit issued — Sidewalk Shed
M00818518-I1-SH
11/08/2022
Objection resolved — Addressed
11/06/2022
Objection raised — Scope
11/02/2022
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-P3
10/18/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Scope
10/13/2022
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-S2
10/06/2022
Objection resolved — Addressed
09/29/2022
Objection raised — Scope
09/23/2022
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-P2
09/23/2022
Filed — Alteration
RENOV. OF KITCH & BATHRMS, MECH EXH VENTS IN APTS. REPL FLRING, TILES, CELINGS, WALLS, DOORS IN APTS & HALLS. NEW HVAC UNITS,HW HEAT PUMPS. NEW FIXT &APPLNCS. NEW STAIRS & REPAIRS, LEVEL FLOORS WHERE NEEDED, NEW ROOF OVER EXIST. facade repairs&window repl
M00727268-P1
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
Orli Eshkar
09/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Orli Eshkar
09/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
Orli Eshkar
07/19/2022
Special inspection requirement — Interior lighting power
Orli Eshkar
07/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
Orli Eshkar
07/19/2022
Special inspection requirement — Insulation placement and R values
Orli Eshkar
07/19/2022
Special inspection requirement — Lighting in dwelling units
Orli Eshkar
07/19/2022
Special inspection requirement — Lighting controls
Orli Eshkar
07/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Orli Eshkar
07/19/2022
Special inspection requirement — Exterior lighting power
Orli Eshkar
07/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
Orli Eshkar
07/19/2022
Special inspection requirement — Final
Orli Eshkar
07/19/2022
Special inspection requirement — Mechanical Systems
David Salamon
07/19/2022
Special inspection requirement — Heating Systems
Dwayne Williams
07/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Salamon
07/08/2022
Permit issued — Plumbing
M00727268-S1-PL
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG05/15/2024
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN08/10/2023
DOB NOWGeneral ConstructionPermit IssuedNYACK SOLAR LLC04/11/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC01/27/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC01/26/2023
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN07/08/2022
DOB NOWGeneral ConstructionPermit IssuedNYACK SOLAR LLC06/21/2022
1 project · most recent 07/15/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/15/2024Permit IssuedNYACK SOLAR LLCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu ASU7RLF1 AOU18RLXFZH 18,000 BTU · Split System ×6
ASU12RLF1 AOU18RLXFZH 18,000 BTU · Split System ×5
ASU18RLF AOU18RLXFWH 18,000 BTU · Split System ×5
1 project · most recent 07/15/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/15/2024Signed-offWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
2 projects · most recent 01/27/2023
General Wiring
FiledStatusContractorScope
01/27/2023CompleteRICHARD NEU—
04/28/2022Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/23/2024HVAC-R and service water heating system controlsOrli Eshkarenergy_progress
07/23/2024HVAC-R and service water piping design and insulationOrli Eshkarenergy_progress
07/23/2024HVAC-R and service water heating equipmentOrli Eshkarenergy_progress
07/11/2024HVAC-R and service water heating equipmentOrli Eshkarenergy_progress
07/11/2024HVAC-R and service water heating system controlsOrli Eshkarenergy_progress
07/11/2024HVAC-R and service water piping design and insulationOrli Eshkarenergy_progress
03/13/2024HVAC-R and service water piping design and insulationOrli Eshkarenergy_progress
03/13/2024HVAC-R and service water heating system controlsOrli Eshkarenergy_progress
03/13/2024HVAC-R and service water heating equipmentOrli Eshkarenergy_progress
01/11/2024HVAC-R and service water heating system controlsOrli Eshkarenergy_progress
01/11/2024HVAC-R and service water piping design and insulationOrli Eshkarenergy_progress
01/11/2024HVAC-R and service water heating equipmentOrli Eshkarenergy_progress
10/11/2023HVAC-R and service water heating equipmentOrli Eshkarenergy_progress
10/11/2023HVAC-R and service water piping design and insulationOrli Eshkarenergy_progress
10/11/2023HVAC-R and service water heating system controlsOrli Eshkarenergy_progress
09/20/2022HVAC-R and service water heating equipmentOrli Eshkarenergy_progress
09/20/2022HVAC-R and service water piping design and insulationOrli Eshkarenergy_progress
09/20/2022HVAC-R and service water heating system controlsOrli Eshkarenergy_progress
07/19/2022Interior lighting powerOrli Eshkarenergy_progress
07/19/2022HVAC-R and service water heating system controlsOrli Eshkarenergy_progress
07/19/2022Insulation placement and R valuesOrli Eshkarenergy_progress
07/19/2022Lighting in dwelling unitsOrli Eshkarenergy_progress
07/19/2022Lighting controlsOrli Eshkarenergy_progress
07/19/2022HVAC-R and service water piping design and insulationOrli Eshkarenergy_progress
07/19/2022Exterior lighting powerOrli Eshkarenergy_progress
Latest 25 of 30.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/02/2026M00727268-P8Request digital key ↗
09/02/2026M00727268-P7Request digital key ↗
09/02/2026M00727268-P6Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/13/2026M00727268-P2Open ↗
08/13/2026M00727268-P3Open ↗
08/13/2026M00727268-P1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026M00818518-I1Open ↗
09/01/2026M00819309-I1Open ↗
08/13/2026M00727268-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026M00727268-P1Open ↗
08/29/2026M00727268-P1Open ↗
08/29/2026M00727268-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026M00727268-P1Open ↗
08/29/2026M00727268-P1Open ↗
08/29/2026M00727268-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/13/2026M00727268-S2Open ↗
08/13/2026M00727268-P5Open ↗
08/13/2026M00727268-P4Open ↗
Showing 3 of 11 on file for this type