← Back
Elevator apt, semi-fireproof without stores
47 WEST 86 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031400
💬 Discuss this project
1896Year Built
4Stories
D1Building Class
R10AZoning
8,419 sfGross Floor Area
10Units
Rent Stabilized27 Open Violations 26 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: 47 WEST 86TH STREET C · 2,517 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Cellar4p · 1 filing · 9 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
47 WEST 86TH STREET C2203/22/2026
47 W 86ST CORPORATION103/22/2026
47 WEST 86 ST CORP603/22/2026
47 W 86 ST CORPORATION403/22/2026
47 WEST 86TH STREET C 805203/22/2026
47 W 86 ST C/LLORENT103/22/2026
LLORENTE103/22/2026
JK DANSAR CORP103/21/2026
PLON REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ST DESIGN & CONSULTING INC.208/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H DRUMMOND EXP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHANE WALTERSGeneral Contractor303/21/2026
DECLAN DELAHUNTYElectrical103/21/2026
REEDY, GWENDOLYNElectrical103/21/2026
SHANE WALTERSGeneral Contractor103/21/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LIGHTHOUSE5538105/29/2021
Building Lifecycle
All (69)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Inspection (3)
11/15/2023
Violation issued (HPD, closed)
I
06/16/2022
Signed off — Alteration
APPLICATION FILING TO LEGALIZE APT 1F & 1R AS PER ECB VIOLATIONS 34499947J AND 35447999N. WORK INCLUDES INTERIOR RENOVATION ON BSMT AND CELLAR FLOORS FOR BOTH APT(S) 1F/1R AS PER PLAN.
M00524769-I1
04/19/2022
Signed off — Alteration
APPLICATION FILING TO LEGALIZE APT 1F & 1R AS PER ECB VIOLATIONS 34499947J AND 35447999N. WORK INCLUDES INTERIOR RENOVATION ON BSMT AND CELLAR FLOORS FOR BOTH APT(S) 1F/1R AS PER PLAN.
M00524769-S1
03/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/16/2022
Violation issued (HPD, closed)
A
09/07/2021
Permit issued — Plumbing
M00524769-S1-PL
08/30/2021
Permit issued — General Construction
M00524769-I1-GC
08/10/2021
Filed — Alteration
APPLICATION FILING TO LEGALIZE APT 1F & 1R AS PER ECB VIOLATIONS 34499947J AND 35447999N. WORK INCLUDES INTERIOR RENOVATION ON BSMT AND CELLAR FLOORS FOR BOTH APT(S) 1F/1R AS PER PLAN.
M00524769-S1
06/03/2021
Violation issued (ECB, closed)
Construction
06/03/2021
Violation issued (ECB, closed)
Construction
05/29/2021
Filed — Alteration
APPLICATION FILING TO LEGALIZE APT 1F & 1R AS PER ECB VIOLATIONS 34499947J AND 35447999N. WORK INCLUDES INTERIOR RENOVATION ON BSMT AND CELLAR FLOORS FOR BOTH APT(S) 1F/1R AS PER PLAN.
M00524769-I1
04/15/2021
Violation issued (ECB, closed)
Construction
04/15/2021
Violation issued (ECB, closed)
Construction
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
02/26/2021
Violation issued (HPD, open)
B
02/26/2021
Violation issued (HPD, open)
C
02/26/2021
Violation issued (HPD, closed)
C
02/24/2021
Violation issued (HPD, closed)
C
02/24/2021
Violation issued (HPD, closed)
C
02/24/2021
Violation issued (HPD, open)
C
12/17/2020
Violation issued (ECB, closed)
Construction
10/27/2020
Violation issued (ECB, closed)
Construction
10/27/2020
Violation issued (ECB, closed)
Construction
08/25/2020
Violation issued (ECB, closed)
Construction
08/25/2020
Violation issued (ECB, closed)
Construction
02/13/2020
Violation issued (ECB, closed)
Construction
02/13/2020
Violation issued (ECB, closed)
Construction
01/08/2020
Violation issued (ECB, closed)
Construction
01/08/2020
Violation issued (ECB, closed)
Construction
11/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/23/2019
Violation issued (ECB, closed)
Construction
11/23/2019
Violation issued (ECB, closed)
Construction
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/12/2019
Violation issued (ECB, closed)
Construction
09/17/2019
Violation issued (ECB, closed)
Construction
09/17/2019
Violation issued (ECB, closed)
Construction
09/04/2019
Violation issued (ECB, closed)
Construction
09/04/2019
Violation issued (ECB, closed)
Construction
11/13/2018
Violation issued (HPD, open)
B
11/13/2018
Violation issued (HPD, open)
A
08/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2018
Violation issued (ECB, closed)
Unknown
05/21/2018
Violation issued (ECB, closed)
Construction
05/21/2018
Violation issued (ECB, closed)
Construction
05/21/2018
Violation issued (ECB, closed)
Construction
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/07/2017
Violation issued (HPD, open)
B
12/07/2017
Violation issued (HPD, open)
A
12/07/2017
Violation issued (HPD, open)
C
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2016
Violation issued (HPD, open)
A
05/13/2016
Violation issued (HPD, open)
A
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN09/07/2021
DOB NOWGeneral ConstructionSigned-offSHANE WALTERS08/30/2021
1 project · most recent 10/03/2020
General Wiring
FiledStatusContractorScope
10/03/2020Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026M00524769-S1Request digital key ↗
09/03/2026M00524769-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026M00524769-I1Open ↗
08/13/2026M00524769-S1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M00524769-S1Open ↗
08/13/2026M00524769-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00524769-I1Open ↗
08/13/2026M00524769-S1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00524769-I1Open ↗