Walk-up apt, over six families with stores
47 WEST 8TH STREET
MANHATTAN · Greenwich Village · BIN 1080139
💬 Discuss this project
1845Year Built
5Stories
C7Building Class
C4-5Zoning
17,000 sfGross Floor Area
15Units
Rent Stabilized25 Active Violations 23 unresolved · 2 paperwork only 5 likely answered ▸
Walk-up apt, over six families with stores · Owner of record: Goldberg Center · 4,320 sf lot · 3.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJews for Jesus13p · 3 filings · 18 docs
Floor 3FEMA compliance and deterioration repair1p · 1 filing · 6 docs
Floor 2
Floor 1Coffee shop renovation12p · 3 filings · 20 docs
Cellar1p · 1 filing · 7 docs
Site & exteriorJews for Jesus17p · 4 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jewsforjesus1907/08/2026
45 W 8703/21/2026
45 West 8203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/17/2018$16.1M—WEST 8TH STREET ASSOCIATES, LLC → Jews for Jesus$945/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
KM Associates of New York203/21/2026
Lombardo Building Consultants103/21/2026
K M DOB Consulting603/21/2026
K & M Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM Construction ManagementGeneral Contractor403/21/2026
Vmma ConstructionGeneral Contractor307/08/2026
Vmma ConstructionScaffold307/08/2026
Powers Bridging & ScaffoldingScaffold207/08/2026
Bedrock Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544207/09/2024
Scalar Architecture4696112/27/2023
AK Engineering678103/15/2022
SY Engineering5149108/24/2021
Building Lifecycle
All (112)Filed (9)Permit Issued (9)Signed Off (5)Violation (60)Inspection (5)Objection (2)Special Inspection (22)
05/07/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/12/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
08/05/2024
Signed off — Alteration
SCOPE OF WORKREAR FACADE EXPOSURE 3, ROOF FRAMING IMPROVEMENTS & ROOF DECK IMPROVEMENTS.
M00839968-I1
08/05/2024
Signed off — Alteration
M08035165-I1
07/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
07/12/2024
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
07/12/2024
Special inspection requirement — Final
EUGENE BIFULCO
07/12/2024
Special inspection requirement — Structural Wood Frame
EUGENE BIFULCO
07/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
07/12/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
07/09/2024
Filed — Alteration
SCOPE OF WORKREAR FACADE EXPOSURE 3, ROOF FRAMING IMPROVEMENTS & ROOF DECK IMPROVEMENTS.
M00839968-P1
07/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
07/08/2024
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
07/08/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
07/08/2024
Special inspection requirement — Final
EUGENE BIFULCO
07/08/2024
Special inspection requirement — Structural Wood Frame
EUGENE BIFULCO
05/10/2024
Permit issued — Supported Scaffold
M00857565-I1-SF
04/16/2024
Signed off — Alteration
FACADE REPAIR AS PER PLANS.FILED FOR FACADE WORK PERMIT ONLY.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00890458-I1
04/16/2024
Violation issued (HPD, open)
A
02/08/2024
Permit issued — Sidewalk Shed
M08035165-I1-SH
01/17/2024
Permit issued — General Construction
M00890458-I1-GC
01/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2024
Objection resolved — Addressed
01/03/2024
Special inspection requirement — Masonry
JULIO SALCEDO-FERNANDEZ
01/02/2024
Objection raised — Scope
12/27/2023
Filed — Alteration
FACADE REPAIR AS PER PLANS.FILED FOR FACADE WORK PERMIT ONLY.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00890458-I1
12/19/2023
Special inspection requirement — Energy Code Compliance Inspections
JULIO SALCEDO-FERNANDEZ
12/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
JULIO SALCEDO-FERNANDEZ
12/19/2023
Special inspection requirement — Final
JULIO SALCEDO-FERNANDEZ
11/17/2023
Permit issued — Structural
M00839968-I1-GC-CX
11/09/2023
Violation issued (ECB, closed)
Construction
10/09/2023
Filed — Alteration
SCOPE OF WORKREAR FACADE EXPOSURE 3, ROOF FRAMING IMPROVEMENTS & ROOF DECK IMPROVEMENTS.
M00839968-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2023
Filed — Alteration
Application for the installation and use of a supported scaffold as per plans filed here in. No change in egress, use, or occupancy.
M00857565-I1
04/27/2023
Permit issued — Supported Scaffold
M00857565-I1-SF
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2023
Violation issued (HPD, closed)
A
03/27/2023
Signed off — Alteration
M00581868-I1
03/24/2023
Signed off — Alteration
REPLACEMENT AND INSTALLATION OF PLUMBING FIXTURES.
M00581887-I1
02/13/2023
Permit issued — Sidewalk Shed
M08035165-I1-SH
01/11/2023
Filed — Alteration
M08035165-I1
01/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/02/2022
Violation issued (HPD, closed)
I
10/17/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/13/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/05/2022
Filed — Alteration
REPLACEMENT AND INSTALLATION OF PLUMBING FIXTURES.
M00581887-P1
06/01/2022
Permit issued — Structural
M00600214-I1-ST
03/15/2022
Filed — Alteration
M00600214-I1
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
03/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
12/16/2021
Permit issued — General Construction
M00581868-I1-GC
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedVmma Construction05/10/2024
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol02/08/2024
DOB NOWGeneral ConstructionSigned-offVmma Construction01/17/2024
DOB NOWStructuralSigned-offVmma Construction11/17/2023
DOB NOWSupported ScaffoldPermit IssuedVmma Construction04/27/2023
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol02/13/2023
DOB NOWStructuralSigned-offJRM Construction Management06/01/2022
DOB NOWGeneral ConstructionSigned-offJRM Construction Management12/16/2021
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating11/16/2021
BISFPISSUEDMaster Fire Systems09/25/2014
BISFPISSUEDMaster Fire Systems05/01/2013
BISOTISSUEDOdin Construction Management03/22/2013
BISEQISSUEDSpring Scaffolding02/22/2013
BISFPISSUEDH.A.M. Fire Equipment04/12/2010
BISPLISSUEDPeter Miceli Plumbing08/19/2009
BISOTISSUEDFlux Builders Group02/13/2009
BISOTISSUEDHenrysmith Property Management04/03/2007
2 projects · most recent 11/08/2022
General Wiring
FiledStatusContractorScope
11/08/2022Permit IssuedOptimal Electric—
09/23/2022CompleteLive Wire Electric 1General Wiring
1 project · most recent 04/27/2023
Scaffold
FiledStatusContractorScope
04/27/2023Permit IssuedVmma ConstructionScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/17/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
07/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/12/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
07/12/2024Insulation placement and R valuesEUGENE BIFULCOenergy_progress
07/12/2024FinalEUGENE BIFULCOprogress
07/12/2024Structural Wood FrameEUGENE BIFULCOprogress
07/12/2024Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
07/12/2024Post-installed AnchorsEUGENE BIFULCOspecial
07/08/2024Tenant Protection Plan Compliance—special
07/08/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
07/08/2024Insulation placement and R valuesEUGENE BIFULCOenergy_progress
07/08/2024Post-installed AnchorsEUGENE BIFULCOspecial
07/08/2024FinalEUGENE BIFULCOprogress
07/08/2024Structural Wood FrameEUGENE BIFULCOprogress
01/03/2024MasonryJULIO SALCEDO-FERNANDEZspecial
12/19/2023Energy Code Compliance InspectionsJULIO SALCEDO-FERNANDEZprogress
12/19/2023Tenant Protection Plan ComplianceJULIO SALCEDO-FERNANDEZspecial
12/19/2023FinalJULIO SALCEDO-FERNANDEZprogress
03/04/2022Structural Stability – Alterations of existing buildingsAri Kamospecial
09/24/2021FinalAri Kamoprogress
08/23/2021Energy Code Compliance InspectionsSUNGBOM YIprogress
08/23/2021Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
08/23/2021Interior lighting powerSUNGBOM YIenergy_progress
08/23/2021Lighting controlsSUNGBOM YIenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Jews for JesusReligiousRoof
Project M00839968 Alteration · LOC Issued · 10/09/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 149 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026M00581868-I1Request digital key ↗
09/02/2026M00600214-I1Request digital key ↗
09/02/2026M00581887-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION16
07/13/2015121365619Open ↗
02/21/2013140057015Open ↗
09/13/2012120178404Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION9
10/15/2014121595390Open ↗
05/07/2013121595390Open ↗
03/26/2013121365619Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit6
09/03/2026M00581868-I1Open ↗
08/13/2026M00839968-I1Open ↗
08/13/2026M00839968-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/09/2009110450351Open ↗
▸BISPLACE OF ASSEMBLY1
02/12/2013121526866Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
03/15/2017121365619Open ↗
03/15/2017121365619Open ↗
08/07/2015121595390Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00581868-I1Open ↗
09/02/2026M00581887-I1Open ↗
09/02/2026M00581887-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026M00839968-I1Open ↗
09/27/2026M00839968-I1Open ↗
09/02/2026M00581868-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/27/2026M00839968-I1Open ↗
09/27/2026M00839968-I1Open ↗
09/02/2026M00581868-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/09/2009120173855Open ↗
02/09/2009110450351Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/09/2009120173855Open ↗
02/09/2009110450351Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/21/2013140057015Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/21/2013140057015Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/21/2013140057015Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING10
09/07/2012121365619Open ↗
09/22/2010110450351Open ↗
09/21/2010110450351Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
11/03/2010110450351Open ↗
09/29/2010110450351Open ↗
06/09/2010110450351Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/07/2015121595390Open ↗
▸Safety & Tenant Protection2
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/15/2013121365619Open ↗
▸BISSTREET TREE CHECKLIST1
10/13/2009120178404Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00581868-I1Open ↗
09/02/2026M00581887-P1Open ↗
09/02/2026M00581887-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/13/2009120178404Open ↗
10/09/2009120173855Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/21/2013140057015Open ↗
09/07/2012121365619Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/09/2009110450351Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/29/2026M00839968-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00581868-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/21/2013140057015Open ↗
▸Approvals, Objections & Sign-offs14
▸BISLANDMARKS APPROVAL5
02/03/2016121365619Open ↗
02/21/2013140057015Open ↗
10/14/2009120178404Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
02/12/2013121526866Open ↗
09/07/2012121365619Open ↗
10/13/2009120178404Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/15/2017121365619Open ↗
08/07/2015121595390Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/13/2009120178404Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00600214-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
03/15/2017121365619Open ↗
08/07/2015121595390Open ↗
09/07/2012121365619Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/26/2013121365619Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
02/03/2016121365619Open ↗
02/21/2013140057015Open ↗
01/08/2010110450351Open ↗
▸BISEFILING COVER SHEET3
10/13/2009120178404Open ↗
10/09/2009120173855Open ↗
02/09/2009110450351Open ↗
▸BISeFiling Job Application Cover Sheet2
09/07/2012121365619Open ↗
02/21/2013140057015Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/15/2017121365619Open ↗
02/21/2013140057015Open ↗
10/09/2009120173855Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/13/2009120178404Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
06/14/2010120173855Open ↗
▸BISPLOT DIAGRAM1
10/13/2009120178404Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00600214-I1Open ↗