← Back
STATEN ISLAND
47 WIELAND AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5174908
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Floor 32p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar3p · 2 filings · 20 docs
Site & exterior8p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
V+B ARCHITECTURE URBAN PLANNING LLP809/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
V+B ARCHITECTURE URBAN PLANNING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MK IMPROVEMENT GROUP INCGeneral Contractor507/08/2026
DYNASTY ESTATES LLCGeneral Contractor303/21/2026
FACADE IMPROVEMENT INCGeneral Contractor207/08/2026
FINE MECHANICAL CORPPlumbing207/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
JFR CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738509/05/2023
Building Lifecycle
All (59)Filed (8)Permit Issued (9)Signed Off (3)Inspection (10)Objection (11)Special Inspection (18)
12/07/2023
Signed off — Alteration
18' curb-cut, located on north side of Wieland Avenue, 191.0 feet east of the intersection of Wieland Avenue and Foster Road
S00419208-I1
12/07/2023
Signed off — Alteration
Construction fence at 47 Wieland Ave, along the inside edge of the sidewalk, returned at its ends to the extent necessary to effectively close off the site.
S00419244-I1
10/05/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/22/2023
Signed off — Alteration
Plumbing work pursuant to NB: single family detached residence. Post Approval Amendment P4 to update data per inspection comments. No change to plans or cost.
S00419253-I1
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
09/12/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
09/12/2023
Special inspection requirement — HVAC and service water heating system controls
anthony santoro
09/12/2023
Special inspection requirement — HVAC insulation and sealing
anthony santoro
09/12/2023
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
09/05/2023
Filed — Alteration
Plumbing work pursuant to NB: single family detached residence. Post Approval Amendment P4 to update data per inspection comments. No change to plans or cost.
S00419253-P4
07/18/2023
Filed — Alteration
Plumbing work pursuant to NB: single family detached residence. Post Approval Amendment P4 to update data per inspection comments. No change to plans or cost.
S00419253-P3
07/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/06/2023
Permit issued — Plumbing
S00419253-I1-PL
05/23/2023
Filed — Alteration
Plumbing work pursuant to NB: single family detached residence. Post Approval Amendment P4 to update data per inspection comments. No change to plans or cost.
S00419253-P2
05/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/23/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
05/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
05/23/2023
Special inspection requirement — HVAC insulation and sealing
anthony santoro
05/23/2023
Special inspection requirement — HVAC and service water heating system controls
anthony santoro
05/23/2023
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
04/13/2023
Permit issued — Curb Cut
S00419208-I1-CC
09/09/2022
Permit issued — Construction Fence
S00419244-I1-FN
06/27/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/24/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/16/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/15/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/09/2022
Permit issued — Plumbing
S85180693-I1-PL
05/13/2022
Permit issued — Construction Fence
S00419244-I1-FN
03/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2022
Permit issued — Construction Fence
S00419244-I1-FN
12/29/2021
Permit issued — Construction Fence
S00419244-I1-FN
09/24/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/25/2021
Filed — Alteration
Plumbing work pursuant to NB: single family detached residence. Post Approval Amendment P4 to update data per inspection comments. No change to plans or cost.
S00419253-P1
08/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/23/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
08/23/2021
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
08/23/2021
Special inspection requirement — HVAC and service water heating system controls
anthony santoro
08/23/2021
Special inspection requirement — HVAC insulation and sealing
anthony santoro
08/23/2021
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
08/18/2021
Permit issued — Plumbing
S00419253-I1-PL
05/24/2021
Objection raised — Fire_Protection
05/24/2021
Objection raised — Fire_Protection
05/24/2021
Objection raised — Other
05/19/2021
Filed — Alteration
Construction fence at 47 Wieland Ave, along the inside edge of the sidewalk, returned at its ends to the extent necessary to effectively close off the site.
S00419244-P1
04/27/2021
Permit issued — Construction Fence
S00419244-I1-FN
12/15/2020
Filed — Alteration
Plumbing work pursuant to NB: single family detached residence. Post Approval Amendment P4 to update data per inspection comments. No change to plans or cost.
S00419253-I1
12/01/2020
Objection resolved — Addressed
11/30/2020
Objection resolved — Addressed
11/30/2020
Objection resolved — Addressed
11/17/2020
Objection raised — Other
11/17/2020
Objection raised — Structural
11/17/2020
Objection raised — Mechanical
11/10/2020
Objection raised — Scope
11/10/2020
Objection resolved — Addressed
11/09/2020
Filed — Alteration
18' curb-cut, located on north side of Wieland Avenue, 191.0 feet east of the intersection of Wieland Avenue and Foster Road
S00419208-I1
11/09/2020
Filed — Alteration
Construction fence at 47 Wieland Ave, along the inside edge of the sidewalk, returned at its ends to the extent necessary to effectively close off the site.
S00419244-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP06/06/2023
DOB NOWCurb CutSigned-offDYNASTY ESTATES LLC04/13/2023
DOB NOWConstruction FenceSigned-offFACADE IMPROVEMENT INC09/09/2022
DOB NOWPlumbingSigned-offJFR CONSTRUCTION CORP06/09/2022
DOB NOWConstruction FenceSigned-offFACADE IMPROVEMENT INC05/13/2022
DOB NOWConstruction FenceSigned-offMK IMPROVEMENT GROUP INC01/24/2022
DOB NOWConstruction FenceSigned-offMK IMPROVEMENT GROUP INC12/29/2021
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP08/18/2021
DOB NOWConstruction FenceSigned-offMK IMPROVEMENT GROUP INC04/27/2021
BIS—ISSUEDDYNASTY ESTATES LLC08/10/2022
1 project · most recent 08/25/2023
General Wiring
FiledStatusContractorScope
08/25/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/05/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/24/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/16/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/15/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/12/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
09/12/2023Fire-Resistance Rated Constructionanthony santoroprogress
09/12/2023Energy Code Compliance Inspectionsanthony santoroprogress
09/12/2023HVAC and service water heating system controls anthony santoroenergy_progress
09/12/2023HVAC insulation and sealing anthony santoroenergy_progress
09/12/2023HVAC and service water heating equipment anthony santoroenergy_progress
05/23/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
05/23/2023Energy Code Compliance Inspectionsanthony santoroprogress
05/23/2023Fire-Resistance Rated Constructionanthony santoroprogress
05/23/2023HVAC insulation and sealing anthony santoroenergy_progress
05/23/2023HVAC and service water heating system controls anthony santoroenergy_progress
05/23/2023HVAC and service water heating equipment anthony santoroenergy_progress
08/23/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
08/23/2021Energy Code Compliance Inspectionsanthony santoroprogress
08/23/2021Fire-Resistance Rated Constructionanthony santoroprogress
08/23/2021HVAC and service water heating system controls anthony santoroenergy_progress
08/23/2021HVAC insulation and sealing anthony santoroenergy_progress
08/23/2021HVAC and service water heating equipment anthony santoroenergy_progress
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
08/22/2026S00419253-P2Request digital key ↗
08/22/2026S00419253-I1Request digital key ↗
08/22/2026S00419253-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/15/2026S00419244-I1Request digital key ↗
08/15/2026S00419244-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026S00419208-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION9
02/16/2024540188697Open ↗
07/19/2023540188697Open ↗
05/26/2023540188697Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
11/15/2022540188517Open ↗
11/13/2020540188517Open ↗
10/27/2020540188517Open ↗
▸BISWORK PERMIT APPLICATION1
06/28/2021540188697Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/21/2023540188697Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM ACCEPTANCE1
02/25/2021540188697Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/10/2021540188697Open ↗
▸BISVERIFY TAX LOT1
02/05/2024540188697Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/13/2023540188697Open ↗
▸BISZONING DIAGRAM1
02/25/2021540188697Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/10/2021540188697Open ↗
▸BISZONING RESOLUTION DETERMINATION1
11/23/2020540188697Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00419208-I1Open ↗
08/25/2026S00419244-I1Open ↗
08/25/2026S00419244-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/19/2026S00419253-P2Open ↗
09/19/2026S00419253-P2Open ↗
08/31/2026S00419253-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/19/2026S00419253-P2Open ↗
08/31/2026S00419253-I1Open ↗
08/28/2026S00419253-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
11/23/2020540188697Open ↗
10/27/2020540188517Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/23/2020540188697Open ↗
10/27/2020540188517Open ↗
▸Trade Schedules & Equipment5
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
11/13/2023540188697Open ↗
01/13/2021540188697Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/13/2023540188697Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/13/2023540188697Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
01/13/2021540188697Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/15/2020540188697Open ↗
▸BISSTREET TREE CHECKLIST1
11/23/2020540188697Open ↗
▸BISSTREET TREE SIGNOFF1
11/14/2023540188697Open ↗
▸BISSTREET TREES SITE PLAN1
11/13/2023540188697Open ↗
▸Energy Compliance14
▸BISAIR SEALING AND INSULATION - VISUAL1
11/13/2023540188697Open ↗
▸BISINTERIOR LIGHTING POWER1
11/13/2023540188697Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/13/2023540188697Open ↗
▸BISFENESTRATION AREAS1
11/13/2023540188697Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/13/2023540188697Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/28/2021540188697Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/13/2023540188697Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/13/2023540188697Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/13/2023540188697Open ↗
▸BISLIGHTING CONTROLS1
11/13/2023540188697Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/13/2023540188697Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/23/2020540188697Open ↗
▸BISEXTERIOR LIGHTING POWER1
11/13/2023540188697Open ↗
▸BISFENESTRATION AIR LEAKAGE1
11/13/2023540188697Open ↗
▸Inspections & Test Reports8
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/13/2021540188697Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/13/2023540188697Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/13/2023540188697Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/13/2023540188697Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/27/2020540188517Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/28/2021540188697Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
11/13/2023540188697Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/13/2023540188697Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
02/16/2024540188697Open ↗
07/19/2023540188697Open ↗
02/10/2021540188697Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff3
11/15/2022540188517Open ↗
11/13/2020540188517Open ↗
10/27/2020540188517Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION7
03/19/2024540188697Open ↗
07/19/2023540188697Open ↗
11/15/2022540188517Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/23/2020540188697Open ↗
10/27/2020540188517Open ↗
▸Other Documents8
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
11/15/2022540188517Open ↗
11/13/2020540188517Open ↗
▸BISSHUTOFF DAMPERS1
11/13/2023540188697Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/25/2021540188697Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/13/2023540188697Open ↗
▸BISBPP: FILING REQUIRED1
01/13/2021540188697Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/27/2020540188517Open ↗
▸BISPLOT DIAGRAM1
02/03/2021540188697Open ↗