470 DEKALB AVENUE · BIN 3346319
💬 Discuss this project
1965Year Built
20Stories
D3Building Class
R7-1Zoning
827,000 sfGross Floor Area
882Units
LL97 Covered5 Active Violations 2 unresolved · 3 paperwork only 2 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 313,570 sf lot · 2.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsLafayette Bldg 03 facade repairs and abatement1 filing
RoofLafayette Houses Building 3 temporary fence7p · 3 filings · 13 docs
CellarNew York City Housing AuthorityUnder Construction1p · 3 filings · 20 docs
Site & exteriorOpenings and penetrations in building envelopeUnder Construction5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority7307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lakhani & Jordan401/12/2026
Stephen B Jacobs Group301/12/2026
JR Cruz109/03/2025
Joel Phagoo P.E410/30/2024
Superstructures Engineering + Architects104/15/2024
Arup211/22/2022
AK Consulting Services106/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services403/21/2026
Superstructures Engineering + Architects103/21/2026
Stephen B Jacobs Group1403/21/2026
Joel Phagoo P.E103/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold1207/08/2026
Maric Mechanicalspecialty_contractor604/09/2026
J & N Construction GroupScaffold607/08/2026
J & N Construction GroupGeneral Contractor303/21/2026
JrcruzGeneral Contractor204/09/2026
Lit Mode Electrical ContgElectrical203/22/2026
A & S ElectricElectrical103/21/2026
MPC Plumbing & HeatingPlumbing107/08/2026
USA Elect'l ServicesElectrical103/21/2026
Pro ElectricElectrical103/21/2026
MI ElectricElectrical103/21/2026
Ramdeen's Electric ContractingElectrical103/21/2026
FJP MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589301/12/2026
RI Consulting Services8904104/03/2025
Joel Phagoo, PE2416210/08/2024
MT Group798104/15/2024
Socotec Engineering4983403/07/2024
AK Consulting Services, I6198101/08/2024
Building Lifecycle
All (148)Filed (19)Permit Issued (27)Signed Off (6)Facade (FISP) (18)Violation (29)Inspection (3)Objection (16)Special Inspection (30)
07/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/18/2026
Permit issued — General Construction
B00990594-I1-GC
03/18/2026
Permit issued — Mechanical Systems
B00990594-S2-MS
03/18/2026
Permit issued — Structural
B00990594-S1-ST
03/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01098985-I1
03/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01123703-I1
03/13/2026
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01097161-I1
03/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01098988-I1
03/13/2026
Permit issued — Suspended Scaffold
B01097161-I1-SC
03/02/2026
Permit issued — Plumbing
B00990594-S3-PL
02/26/2026
Permit issued — Mechanical Systems
B00990594-S2-MS
02/26/2026
Permit issued — Structural
B00990594-S1-ST
02/25/2026
Permit issued — General Construction
B00990594-I1-GC
01/28/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/27/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
01/23/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
MARISA HARTE
01/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
MARISA HARTE
01/23/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
01/23/2026
Special inspection requirement — Lighting controls
MARISA HARTE
01/23/2026
Special inspection requirement — Electrical motors and elevators
MARISA HARTE
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
01/23/2026
Special inspection requirement — Maintenance information
MARISA HARTE
01/23/2026
Special inspection requirement — Shutoff dampers
MARISA HARTE
01/23/2026
Special inspection requirement — Interior lighting power
MARISA HARTE
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
01/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
MARISA HARTE
01/23/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
01/23/2026
Special inspection requirement — Final
MARISA HARTE
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
MARISA HARTE
01/20/2026
Special inspection requirement — Air barrier - visual inspection
MARISA HARTE
01/20/2026
Special inspection requirement — Final
MARISA HARTE
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
01/20/2026
Special inspection requirement — Masonry
MARISA HARTE
01/16/2026
Objection raised — Admin
01/16/2026
Objection raised — Admin
01/12/2026
Filed — Alteration
Replacement of HVAC equipment (Vacuum pump, condensate pump)
B00990594-P2
01/12/2026
Filed — Alteration
Replacement of HVAC equipment (Vacuum pump, condensate pump)
B00990594-P3
01/12/2026
Filed — Alteration
Replacement of HVAC equipment (Vacuum pump, condensate pump)
B00990594-P1
01/12/2026
Cycle 9 facade report signed — SAFE
01/08/2026
Special inspection requirement — Air barrier - visual inspection
MARISA HARTE
01/08/2026
Special inspection requirement — Interior lighting power
MARISA HARTE
01/08/2026
Special inspection requirement — Electrical motors and elevators
MARISA HARTE
01/08/2026
Special inspection requirement — Shutoff dampers
MARISA HARTE
01/08/2026
Special inspection requirement — Maintenance information
MARISA HARTE
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
01/08/2026
Special inspection requirement — Masonry
MARISA HARTE
01/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/06/2026
Cycle 9 facade inspection completed
01/05/2026
Permit issued — Plumbing
B00749005-I1-PL
12/17/2025
Permit issued — Supported Scaffold
B01123703-I1-SF
12/09/2025
Signed off — Alteration
Lafayette Bldg 03, Exterior Facade repairs: Removal/replacement/repairs of concrete slab, exterior wythe reconstruction of brick cavity wall, repointing, sill, shelf angle, masonry, expansion joint and sealant. Abate lead and asbestos materials.
B01034528-I1
12/09/2025
Cycle 9 facade report submitted
12/04/2025
Permit issued — General Construction
B00748999-I1-GC
10/23/2025
Permit issued — Support of Excavation
B00748999-S1-SE
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/18/2026
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/18/2026
DOB NOWStructuralPermit IssuedMaric Mechanical03/18/2026
DOB NOWSuspended ScaffoldSigned-offJ&N Construction Group03/13/2026
DOB NOWPlumbingPermit IssuedFJP Mechanical03/02/2026
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical02/26/2026
DOB NOWStructuralPermit IssuedMaric Mechanical02/26/2026
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical02/25/2026
DOB NOWPlumbingSigned-offMPC Plumbing & Heating01/05/2026
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group12/17/2025
DOB NOWGeneral ConstructionPermit IssuedJrcruz12/04/2025
DOB NOWSupport of ExcavationPermit IssuedJrcruz10/23/2025
DOB NOWSidewalk ShedSigned-offJ & N Construction Group09/09/2025
DOB NOWConstruction FenceSigned-offJ & N Construction Group09/05/2025
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng04/04/2025
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group02/20/2025
DOB NOWConstruction FenceSigned-offRoma Scaffolding11/04/2024
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group10/09/2024
DOB NOWSuspended ScaffoldSigned-offJ&N Construction Group09/06/2024
DOB NOWConstruction FenceSigned-offJ & N Construction Group08/21/2024
DOB NOWSidewalk ShedSigned-offJ & N Construction Group08/21/2024
DOB NOWConstruction FenceSigned-offRoma Scaffolding01/28/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng01/17/2024
DOB NOWConstruction FenceSigned-offRoma Scaffolding01/25/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/18/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/04/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding06/08/2020
BISEQISSUEDRoma Scaffolding02/01/2024
BISEQISSUEDRoma Scaffolding02/03/2023
BISEQISSUEDRoma Scaffolding02/10/2022
BISEQISSUEDRoma Scaffolding02/11/2021
BISEQISSUEDRoma Scaffolding02/19/2020
BISEQISSUEDRoma Scaffolding02/11/2019
BISEQISSUEDRoma Scaffolding02/08/2018
BISEQISSUEDRoma Scaffolding02/14/2017
BISEQISSUEDRoma Scaffolding07/01/2016
BISEQISSUEDUniversal Construction RE08/25/2015
BISOTISSUEDUniversal Construction RE07/22/2015
BISEQISSUEDRoma Scaffolding07/07/2015
BISEQISSUEDUniversal Construction RE05/22/2015
+ 7 more permits on file
1 project · most recent 01/12/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/12/2026Permit IssuedMaric MechanicalVentilation Systems
Ventilation
Greenheck SBE-1H24-3 1,250 CFM · Exhaust Fan ×2
1 project · most recent 01/12/2026
Storm
FiledStatusContractorScope
01/12/2026Permit IssuedFJP MechanicalStorm
7 projects · most recent 03/16/2026
General Wiring
FiledStatusContractorScope
03/16/2026Permit IssuedOhm's ElectricalGeneral Wiring
02/11/2025CompleteLit Mode Electrical Contg—
02/11/2025CompleteLit Mode Electrical Contg—
08/13/2024CompleteLit Mode Electrical Contg—
09/21/2023CompleteHylan Datacom & Electrical—
06/06/2021CompleteSezekcol ElectricGeneral Wiring
05/22/2019CompleteJ&H Electrical ContGeneral Wiring
1 project · most recent 09/03/2025
FiledStatusContractorScope
09/03/2025Permit IssuedJrcruz1 scope_items
1 project · most recent 04/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/03/2025Permit IssuedD&N Construction & ConsultngSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/28/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/27/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
01/23/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
01/23/2026High-Pressure Fuel-Gas Piping (Welding)MARISA HARTEspecial
01/23/2026Tenant Protection Plan ComplianceMARISA HARTEspecial
01/23/2026Post-installed AnchorsMARISA HARTEspecial
01/23/2026Energy Code Compliance InspectionsMARISA HARTEprogress
01/23/2026Lighting controlsMARISA HARTEenergy_progress
01/23/2026Electrical motors and elevatorsMARISA HARTEenergy_progress
01/23/2026HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
01/23/2026Maintenance informationMARISA HARTEenergy_progress
01/23/2026Shutoff dampersMARISA HARTEenergy_progress
01/23/2026Interior lighting powerMARISA HARTEenergy_progress
01/23/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
01/23/2026Tenant Protection Plan ComplianceMARISA HARTEspecial
01/23/2026Mechanical SystemsMARISA HARTEspecial
01/23/2026Energy Code Compliance InspectionsMARISA HARTEprogress
01/23/2026FinalMARISA HARTEprogress
01/20/2026Tenant Protection Plan ComplianceMARISA HARTEspecial
01/20/2026Air barrier - visual inspectionMARISA HARTEenergy_progress
01/20/2026FinalMARISA HARTEprogress
01/20/2026Energy Code Compliance InspectionsMARISA HARTEprogress
01/20/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
01/20/2026MasonryMARISA HARTEspecial
01/08/2026Air barrier - visual inspectionMARISA HARTEenergy_progress
01/08/2026Interior lighting powerMARISA HARTEenergy_progress
01/08/2026Electrical motors and elevatorsMARISA HARTEenergy_progress
Latest 25 of 58.
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch18
08/28/2026B00749005-I1Request digital key ↗
08/26/2026B00987395-I1Request digital key ↗
08/25/2026B00990594-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00353101-I1Request digital key ↗
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION17
02/06/2024340466463Open ↗
02/03/2023340466463Open ↗
02/12/2022340466463Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
11/19/2019340466463Open ↗
11/12/2019340466463Open ↗
02/10/2017340466463Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications73
▸DOB NOWSpecial Inspector Seal & Signature17
10/14/2026B01205038-I1Open ↗
10/14/2026B01205038-I1Open ↗
09/01/2026B00990594-S3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026B00749005-I1Open ↗
08/25/2026B00990594-P2Open ↗
08/25/2026B00990594-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00990594-S3Open ↗
08/31/2026B00990594-P3Open ↗
08/28/2026B00990594-S2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
01/24/2017340277355Open ↗
01/24/2017340277355Open ↗
02/04/2016340137284Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
02/10/2017340466463Open ↗
07/05/2015340277355Open ↗
05/15/2015340241394Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
02/10/2017340466463Open ↗
07/05/2015340277355Open ↗
05/15/2015340241394Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
02/10/2017340466463Open ↗
07/05/2015340277355Open ↗
05/15/2015340241394Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/30/2009320087838Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/30/2009320087838Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
02/10/2017340466463Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00353101-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/25/2026B00990594-I1Open ↗
08/25/2026B00990594-S1Open ↗
08/25/2026B00990594-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/30/2009320087838Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/06/2014340137284Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/04/2016340137284Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/22/2015340137284Open ↗
05/06/2014340137284Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
02/10/2017340466463Open ↗
07/05/2015340277355Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/04/2016340137284Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/06/2014340137284Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/04/2016340137284Open ↗
▸BISNYCECC ANALYSIS1
05/06/2014340137284Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
11/03/2024340466463Open ↗
02/10/2017340466463Open ↗
07/22/2015340137284Open ↗
Showing 3 of 9 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
02/10/2017340466463Open ↗
07/05/2015340277355Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/26/2026B00987395-I1Open ↗
08/20/2026B00748999-I1Open ↗
08/15/2026B00748999-S1Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
11/04/2024340466463Open ↗
01/24/2017340277355Open ↗
02/04/2016340137284Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/06/2024340466463Open ↗
02/03/2023340466463Open ↗
02/26/2021340466463Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER6
02/12/2022340466463Open ↗
02/26/2020340466463Open ↗
02/26/2020340466463Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
11/03/2024340466463Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/30/2009320087838Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B00353101-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00353101-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01034528-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/04/2016340137284Open ↗
05/06/2014340137284Open ↗
▸Filing & Intake Forms9
▸BISEFILING JOB APPLICATION COVER SHEET6
02/10/2017340466463Open ↗
07/05/2015340277355Open ↗
05/15/2015340241394Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
11/19/2019340466463Open ↗
▸BISEFILING COVER SHEET1
10/30/2009320087838Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B01098985-P1Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications3
08/13/2026B01097161-I1Open ↗
08/13/2026B00987395-I1Open ↗
08/13/2026B01205038-I1Open ↗
▸DOB NOWCalculations3
08/13/2026B00987395-I1Open ↗
08/13/2026B01097161-I1Open ↗
08/13/2026B01205038-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
02/19/2015340137284Open ↗
09/16/2014340184712Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
09/16/2014340184712Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B00748999-S1Open ↗