One story retail building
470 DRIGGS AVENUE
BROOKLYN · BIN 3061624
💬 Discuss this project
1950Year Built
1Stories
K1Building Class
M1-2/R6AZoning
10,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 470 DRIGGS AVENUE LLC · 10,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof6p · 3 filings · 20 docs
Floor 27p · 5 filings · 20 docs
Floor 130p · 12 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KALMON DOLGIN AFFILIATES INC.6507/08/2026
470 DRIGGS AVE LLC103/22/2026
VARTEL NY CONSTRUCTION103/22/2026
470 DRIGGS2803/21/2026
BIER GARTEN WILLIAMSBURG LLC703/21/2026
RESTAURANT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ZENREICH ARCHITECT1003/21/2026
LEWSAN CONSULTING603/21/2026
PRAXIS WORK SHOP603/21/2026
BOLT ARCHITECTURE203/21/2026
BOYD CONSULTING203/21/2026
TRIBECA CONST CONSULTING203/21/2026
EXPEDIENT CONSULTING1203/21/2026
JP EXPEDITE203/21/2026
MMSR CONSULTING GROUP LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IRWIN FRIEDMAN & SON INCPlumbing407/08/2026
TAVELLA PLBG & HTG CORPPlumbing307/08/2026
TAVELLA PLBG HTGGeneral Contractor203/22/2026
IRWIN FRIEDMAN & SON INCFire Protection207/08/2026
GFX SITE DEVELOPMENT INCGeneral Contractor203/21/2026
MUHAN SPACE CORPGeneral Contractor204/09/2026
CITY SIGNSScaffold107/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection107/08/2026
DUMANI CONSTRUCTION INCGeneral Contractor107/08/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
INFINITI ESC PLUMBING CORPlumbing106/28/2026
L J ELEC'L SERV. INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369405/15/2026
KATZ ENGINEERING238705/23/2025
AK ENGINEERING PC678605/12/2025
MWB ENGINEERING7942405/12/2025
BOLTARCHITECTURE,PLLC6712107/28/2022
DM ENGINEERS PLLC6427206/15/2021
Building Lifecycle
All (208)Filed (28)Permit Issued (16)Signed Off (5)Violation (40)Inspection (12)Objection (77)Special Inspection (30)
06/26/2026
Special inspection requirement — Final
RONALD VILLANO
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
06/26/2026
Special inspection requirement — Sprayed fire-resistant materials
Luis Pichardo
06/11/2026
Objection resolved — Addressed
06/02/2026
Objection raised — Scope
05/15/2026
Filed — Alteration
HEREWITH FILING FOR NEW TENANT FIT-OUT OF EXISTING EATING AND DRINKING STABLISHMENT AS PER PLANS
B01121824-P2
03/12/2026
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM FOR 1ST FLOOR COMMERCIAL SPACE - FOOLPROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01173622-I1
02/09/2026
Permit issued — Sign
B01272049-I1-SG
02/02/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS LED CHANNEL LETTER WALL SIGN, NO CHANGE TO USE, EGRESS OR OCCUPATION
B01272049-I1
12/23/2025
Violation issued (FDNY_NOV, closed)
12/23/2025
Violation issued (FDNY_NOV, closed)
12/23/2025
Violation issued (FDNY_NOV, closed)
12/10/2025
Signed off — Alteration
B01138104-I1
12/10/2025
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES FOR INTERIOR RENOVATION OF COMMERCIAL SPACE FOOLPROOF. NO CHANGE TO USE, EGRESS OR OCCUANCY.
B01138106-I1
12/09/2025
Signed off — Alteration
RENOVATION OF COMMERCIAL RESTAURANT SPACE. INSTALLATION OF NON-BEARING PARTITIONS, NEW LIGHTING, FINISHES AND MILL WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY, NO EXTERIOR WORK.
B01134686-I1
11/07/2025
Violation issued (FDNY_ORDER, closed)
11/07/2025
Violation issued (FDNY_ORDER, closed)
11/07/2025
Violation issued (FDNY_ORDER, closed)
11/05/2025
Objection raised — Inspections
11/05/2025
Objection resolved — Addressed
11/05/2025
Objection resolved — Addressed
11/05/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
09/26/2025
Violation issued (FDNY_ORDER, closed)
09/26/2025
Violation issued (FDNY_NOV, closed)
09/26/2025
Violation issued (FDNY_NOV, closed)
09/25/2025
Objection raised — Electrical
09/11/2025
Special inspection requirement — Sprayed fire-resistant materials
Luis Pichardo
09/11/2025
Special inspection requirement — Final
RONALD VILLANO
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
09/08/2025
Objection raised — Structural
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
08/18/2025
Objection raised — Scope
08/18/2025
Objection raised — Fire_Protection
08/18/2025
Objection raised — Structural
08/18/2025
Objection raised — Fire_Protection
08/18/2025
Objection raised — Fire_Protection
08/18/2025
Objection raised — Plumbing
08/18/2025
Objection raised — Fire_Protection
08/14/2025
Special inspection requirement — Final
ADITYA DESAI
08/07/2025
Objection raised — Admin
08/07/2025
Objection raised — Scope
08/04/2025
Filed — No Work
B01256512-I1
07/30/2025
Objection raised — Scope
07/30/2025
Objection resolved — Addressed
07/21/2025
Filed — Alteration
HEREWITH FILING FOR NEW TENANT FIT-OUT OF EXISTING EATING AND DRINKING STABLISHMENT AS PER PLANS
B01121824-P1
06/04/2025
Permit issued — Plumbing
B01121824-S1-PL
06/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
YURI KATZ
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YURI KATZ
05/23/2025
Filed — Alteration
Installation of new 4" control valve with tamper switch on the 1st floor and modifications to existing and installation of new sprinkler system as per plans filed herewith. No change in use, egress, or occupancy.
B00474781-P7
05/21/2025
Objection resolved — Addressed
05/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 208 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedELMER DAWSON02/09/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR06/04/2025
DOB NOWPlumbingSigned-offTAVELLA PLBG & HTG CORP05/02/2025
DOB NOWMechanical SystemsSigned-offMUHAN SPACE CORP04/16/2025
DOB NOWGeneral ConstructionSigned-offGFX SITE DEVELOPMENT03/10/2025
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP02/25/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG02/05/2025
DOB NOWGeneral ConstructionSigned-offMUHAN SPACE CORP01/29/2025
DOB NOWPlumbingSigned-offTAVELLA PLBG & HTG CORP05/31/2024
DOB NOWPlumbingSigned-offIRWIN FRIEDMAN & SON INC11/03/2022
DOB NOWPlumbingSigned-offIRWIN FRIEDMAN & SON INC08/31/2021
DOB NOWSprinklersSigned-offIRWIN FRIEDMAN & SON INC08/10/2021
DOB NOWPlumbingPermit IssuedIRWIN FRIEDMAN & SON INC07/09/2021
DOB NOWGeneral ConstructionPermit IssuedDUMANI CONSTRUCTION INC06/22/2021
DOB NOWPlumbingSigned-offIRWIN FRIEDMAN & SON INC05/05/2021
DOB NOWSprinklersSigned-offIRWIN FRIEDMAN & SON INC05/05/2021
BISOTISSUEDYOUNGBUK ART SERVICES LLC12/07/2018
BISSPISSUEDNEW YORK STANDARD MECH CO02/12/2015
BISFPISSUEDACTIVE FIRE CONTROL, INC02/10/2015
BISMHISSUEDVARTEL NY CONSTRUCTION11/18/2014
BIS—ISSUEDVARTEL NY CONSTRUCTION11/13/2014
BISEQISSUEDVARTEL NY CONSTRUCTION11/10/2014
BISPLISSUEDNEW YORK STANDARD MECH CORP07/11/2014
BISPLISSUEDDPH PLUMBING & HTG CORP02/14/2014
BISMHISSUEDVARTEL NY CONSTRUCTION01/16/2014
BIS—ISSUEDVARTEL NY CONSTRUCTION11/14/2013
BISEQISSUEDVARTEL NY CONSTRUCTION11/14/2013
BISEQISSUEDVARTEL NY CONSTRUCTION02/22/2013
BIS—ISSUEDVARTEL NY CONSTRUCTION02/22/2013
BISEQISSUEDMJM CONSTR. SERVICES LLC09/18/2012
1 project · most recent 05/23/2025
FiledStatusContractorScope
05/23/2025Signed-offIRWIN FRIEDMAN & SON INC—
2 projects · most recent 05/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/15/2026Permit IssuedINFINITI ESC PLUMBING CORWater/Sanitary
06/15/2021Permit IssuedIRWIN FRIEDMAN & SON INCGas, Water/Sanitary
4 projects · most recent 03/04/2026
General Wiring
FiledStatusContractorScope
03/04/2026Permit IssuedAMPERE ELECL SERVICES COR—
08/01/2025Permit IssuedKYL ELECTRIC LLCGeneral Wiring
05/09/2025Permit IssuedL J ELEC'L SERV. INC.General Wiring
03/30/2022Permit IssuedMAK ELECTRICAL CONTR CORPGeneral Wiring
1 project · most recent 05/15/2026
FiledStatusContractorScope
05/15/2026Permit IssuedINFINITI ESC PLUMBING COR1 scope_items
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
06/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/23/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
06/26/2026FinalRONALD VILLANOprogress
06/26/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
06/26/2026Sprayed fire-resistant materialsLuis Pichardospecial
09/11/2025Sprayed fire-resistant materialsLuis Pichardospecial
09/11/2025FinalRONALD VILLANOprogress
09/11/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
08/14/2025FinalADITYA DESAIprogress
05/27/2025Energy Code Compliance InspectionsYURI KATZprogress
05/27/2025Fire-Resistant Penetrations and JointsYURI KATZspecial
05/07/2025Energy Code Compliance InspectionsYURI KATZprogress
05/07/2025Fire-Resistant Penetrations and JointsYURI KATZspecial
05/06/2025Sprinkler SystemsFLORINELA MURESANspecial
05/06/2025Fire-Resistant Penetrations and JointsAri Kamospecial
04/03/2025FinalRONALD VILLANOprogress
04/03/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
04/03/2025Sprayed fire-resistant materialsLuis Pichardospecial
02/26/2025HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
02/26/2025Maintenance informationFLORINELA MURESANenergy_progress
02/26/2025HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
02/26/2025HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
02/26/2025Post-installed AnchorsAri Kamospecial
02/26/2025Fire-Resistant Penetrations and JointsAri Kamospecial
01/16/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
11/26/2024Shutoff dampersFLORINELA MURESANenergy_progress
11/26/2024HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
Latest 25 of 60.
▾Documents — 455 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch18
09/01/2026B00474781-S1Request digital key ↗
09/01/2026B00531354-I1Request digital key ↗
08/29/2026B00534877-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/01/2026B00474781-I1Request digital key ↗
09/01/2026B00474781-P5Request digital key ↗
09/01/2026B00474781-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/21/2026B01256512-I1Request digital key ↗
08/14/2026B00922826-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/02/2026B00113548-I1Request digital key ↗
09/02/2026B00120223-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION44
12/10/2018322051863Open ↗
04/25/2016320859692Open ↗
03/31/2016340290535Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION13
12/10/2018322051863Open ↗
02/18/2015321037347Open ↗
02/14/2015320859692Open ↗
Showing 3 of 13 on file for this type
▸BISPLACE OF ASSEMBLY6
02/12/2016321064209Open ↗
08/05/2015321064209Open ↗
02/26/2015321046907Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
04/16/2016320859692Open ↗
04/15/2016320859692Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/19/2015320258403Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01117090-I1Open ↗
08/13/2026B01117090-P1Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications136
▸DOB NOWProgress Inspector Seal & Signature41
09/02/2026B01138106-P1Open ↗
09/02/2026B01138106-P1Open ↗
09/02/2026B01138106-P1Open ↗
Showing 3 of 41 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
12/10/2018322051863Open ↗
03/25/2016320859692Open ↗
03/25/2016320859692Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/02/2026B00113548-I1Open ↗
09/02/2026B00120223-I1Open ↗
09/01/2026B00474781-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026B01138106-P1Open ↗
09/02/2026B01138106-P1Open ↗
08/31/2026B01117090-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/10/2018322051863Open ↗
08/19/2015340290535Open ↗
01/17/2014320859692Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/10/2018322051863Open ↗
01/17/2014320859692Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2015340290535Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2015340290535Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment32
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
05/12/2016320859692Open ↗
04/25/2016320859692Open ↗
12/11/2015320859692Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING5
03/07/2015320859692Open ↗
03/07/2015320859692Open ↗
03/07/2015320859692Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
05/21/2015320859692Open ↗
04/29/2015320859692Open ↗
03/23/2015320859692Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
05/20/2016320258403Open ↗
05/20/2016320258403Open ↗
05/20/2016320258403Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
05/21/2015321058911Open ↗
05/21/2015320859692Open ↗
05/15/2015321058911Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS1
05/20/2016320258403Open ↗
▸Safety & Tenant Protection22
▸DOB NOWHPD-1: Anti-Harassment Area Checklist11
08/13/2026B00474781-P7Open ↗
08/13/2026B00531354-I1Open ↗
08/13/2026B00474781-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWCertificate of No Harassment4
08/13/2026B01121824-P2Open ↗
08/13/2026B01121824-I1Open ↗
08/13/2026B01134686-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
08/19/2015340290535Open ↗
Showing 1 of 2 on file for this type
▸BISANTI-HARASSMENT CHECKLIST2
01/17/2014320859692Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026B01117090-P1Open ↗
08/13/2026B01117090-I1Open ↗
▸BISANTI-HARASSMENT AREA CHECKLIST1
08/19/2015340290535Open ↗
▸Environmental & Asbestos59
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/01/2026B00474781-I1Open ↗
09/01/2026B00474781-P3Open ↗
09/01/2026B00474781-P7Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWOER: Notice to Proceed18
08/13/2026B00531354-I1Open ↗
08/13/2026B01138104-I1Open ↗
08/13/2026B00474781-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/13/2026B01117090-I1Open ↗
08/13/2026B01138104-I1Open ↗
08/13/2026B01138106-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/29/2015321058911Open ↗
11/24/2014321037347Open ↗
01/17/2014320859692Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
05/05/2015321058911Open ↗
04/20/2015320586790Open ↗
04/08/2015320859692Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
08/19/2015340290535Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
03/25/2016320859692Open ↗
03/25/2016320859692Open ↗
06/10/2015320859692Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/25/2016320859692Open ↗
06/10/2015320859692Open ↗
06/02/2015320859692Open ↗
▸BISTR8: Energy Code Progress Inspections3
03/06/2013320258403Open ↗
03/06/2013320258403Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports2
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/19/2015340290535Open ↗
▸Approvals, Objections & Sign-offs37
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
05/24/2016320258403Open ↗
05/12/2016320859692Open ↗
05/10/2016320258403Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE10
12/06/2013320258403Open ↗
11/16/2013320258403Open ↗
08/18/2015320258403Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
03/06/2015321046907Open ↗
03/06/2015321064209Open ↗
01/29/2015321058911Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/24/2016320258403Open ↗
04/23/2015321046907Open ↗
04/23/2015321064209Open ↗
Showing 3 of 4 on file for this type
▸BISFLAME SPREAD/FIRE LETTER2
04/23/2015321046907Open ↗
04/23/2015321064209Open ↗
▸BISSUPERSEDING LETTER1
07/28/2014320859692Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT16
12/11/2018322051863Open ↗
05/24/2016320258403Open ↗
03/25/2016320859692Open ↗
Showing 3 of 16 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/21/2013320258403Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
03/06/2013320258403Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET11
12/11/2018322051863Open ↗
01/29/2015321058911Open ↗
11/24/2014321037347Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION9
02/12/2016321064209Open ↗
02/03/2016320258403Open ↗
08/21/2015320859692Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2015340290535Open ↗
▸DOB NOWAI1 Form1
08/13/2026B00474781-P1Open ↗
▸Other Documents9
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION2
04/01/2015320258403Open ↗
04/01/2015320859692Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026B01117090-I1Open ↗
08/13/2026B01117090-P1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION1
04/01/2015320258403Open ↗