ECB07/10/2025ATOI OBSERVED DEMO THAT HAD BEEN DONE TO THE FIRST FLOOR. WALLS REMOVED AS WELL AS MAJOR PORTION OF THE CEILING. APPROX 70%. NO DEMO PERMITS ON FILE, OBTAIN REQUIRED DEMOLITION PERMIT$-2,500 due
HPD07/14/2006SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1FL, 1st STORY
HPD07/14/2006SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1FL, 1st STORY
HPD05/06/2006SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND WALLS IN THE KITCHEN LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD05/06/2006SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD05/06/2006SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
ECB06/03/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDERS TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #39153289K, FILE A CERTIFICATE OF CORRECTIONHearing held — result not yet published$1K proposed
ECB06/03/2026FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO FILE FOR A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #39153288Z, FILE A CERTIFICATE OF CORRECTIONHearing held — result not yet published$1K proposed
ECB06/03/2026FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #39153286P, FILE A CERTIFICATE OF CORRECTIONHearing held — result not yet published$1K proposed
ECB06/03/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDERS TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #39153287R, FILE A CERTIFICATE OF CORRECTIONHearing held — result not yet published$1K proposed
ECB07/10/2025ATOI OBSERVED ELECTRICAL BX CABLES HANGING THROUGH OUT. WIRES CUT AT ELECTRIC PANEL. OUTLETS AND SWITCHES HANGING. DUE TO WALL REMOVAL., OBTAIN PERMITNothing owed — awaiting certificate of correction
ECB07/10/2025ATOI OBSERVED THE FIRESTOPPING AT THE CEILING OF A TWO FAMILY HOUSE WAS REMOVED. EXPOSED WOOD FLOOR JOISTS. THERE IS A TENANT LIVING ABOVE., PROVIDE/MAINTAIN FIRE STOPPINGNothing owed — awaiting certificate of correction
ECB07/10/2025ATOI OBSERVED DEMO DEBRIS THJROUGHOUT THE FIRST FLOOR. WOOD, PLASTER, TRASH BAGS ETC., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPINGNothing owed — awaiting certificate of correction