Office only, 1 story
470 SEAVIEW AVENUE
STATEN ISLAND · BIN 5050091
💬 Discuss this project
1979Year Built
1Stories
O1Building Class
R3-1Zoning
9,117 sfGross Floor Area
1Units
Office only, 1 story · Owner of record: BRIDGE MGT CO. % HOFFMANN · 23,862 sf lot · 0.38 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof1p · 1 filing · 2 docs
Floor 17p · 3 filings · 20 docs
5 jobs · most recent 01/30/2024
General Wiring
FiledStatusContractorScope
01/30/2024CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
12/01/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
10/27/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
06/17/2021Permit IssuedMANGI ELECTRICAL CORP1 meters
02/13/2018CompletePOWERHOUSE ELEC'L CONT IGeneral Wiring
Building Lifecycle
All (65)Filed (12)Permit Issued (6)Signed Off (5)Inspection (7)Objection (14)Special Inspection (21)
07/18/2024
Signed off — Alteration
Plumbing modifications and associated piping and related finishes as per plans. There will be no change in use, egress, or occupancy
S00926636-I1
07/18/2024
Signed off — Alteration
HVAC modifications and associated ductwork as per plans. There will be no change in use, egress, or occupancy.
S00926625-I1
07/18/2024
Signed off — Alteration
This project consist of renovations to portions of the first floor of an existing outpatient dialysis center located in a once-story single tenant building. There will be no change in use, egress, or occupancy.
S00925224-I1
07/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/11/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
05/28/2024
Special inspection requirement — Preliminary
SRINIVAS THIMMAPPA
05/28/2024
Special inspection requirement — Mechanical Systems
DEV SRINIVAS
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
05/28/2024
Special inspection requirement — Final
SRINIVAS THIMMAPPA
05/24/2024
Objection raised — Scope
05/24/2024
Objection resolved — Addressed
05/22/2024
Filed — Alteration
HVAC modifications and associated ductwork as per plans. There will be no change in use, egress, or occupancy.
S00926625-P2
05/22/2024
Filed — Alteration
Plumbing modifications and associated piping and related finishes as per plans. There will be no change in use, egress, or occupancy
S00926636-P2
05/21/2024
Filed — Alteration
This project consist of renovations to portions of the first floor of an existing outpatient dialysis center located in a once-story single tenant building. There will be no change in use, egress, or occupancy.
S00925224-P2
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
05/09/2024
Special inspection requirement — Final
SRINIVAS THIMMAPPA
05/09/2024
Special inspection requirement — Preliminary
SRINIVAS THIMMAPPA
05/09/2024
Special inspection requirement — Mechanical Systems
DEV SRINIVAS
05/09/2024
Special inspection requirement — Final
SRINIVAS THIMMAPPA
05/09/2024
Special inspection requirement — Preliminary
SRINIVAS THIMMAPPA
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
03/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2024
Objection raised — Scope
03/06/2024
Objection resolved — Addressed
03/05/2024
Filed — Alteration
This project consist of renovations to portions of the first floor of an existing outpatient dialysis center located in a once-story single tenant building. There will be no change in use, egress, or occupancy.
S00925224-P1
03/04/2024
Filed — Alteration
HVAC modifications and associated ductwork as per plans. There will be no change in use, egress, or occupancy.
S00926625-P1
03/04/2024
Filed — Alteration
Plumbing modifications and associated piping and related finishes as per plans. There will be no change in use, egress, or occupancy
S00926636-P1
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
02/29/2024
Special inspection requirement — Final
SRINIVAS THIMMAPPA
02/29/2024
Special inspection requirement — Preliminary
SRINIVAS THIMMAPPA
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
02/29/2024
Special inspection requirement — Preliminary
SRINIVAS THIMMAPPA
02/29/2024
Special inspection requirement — Final
SRINIVAS THIMMAPPA
02/29/2024
Special inspection requirement — Mechanical Systems
DEV SRINIVAS
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
02/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/22/2024
Permit issued — Plumbing
S00926636-I1-PL
01/10/2024
Permit issued — General Construction
S00925224-I1-GC
01/10/2024
Permit issued — Mechanical Systems
S00926625-I1-MS
12/19/2023
Objection resolved — Addressed
12/12/2023
Permit issued — Mechanical Systems
S00926625-I1-MS
11/14/2023
Objection raised — Inspections
11/14/2023
Objection resolved — Addressed
11/14/2023
Objection raised — Scope
11/14/2023
Objection resolved — Addressed
11/14/2023
Objection raised — Inspections
11/14/2023
Objection resolved — Addressed
11/08/2023
Objection raised — Scope
10/31/2023
Filed — Alteration
Plumbing modifications and associated piping and related finishes as per plans. There will be no change in use, egress, or occupancy
S00926636-I1
10/31/2023
Filed — Alteration
HVAC modifications and associated ductwork as per plans. There will be no change in use, egress, or occupancy.
S00926625-I1
10/26/2023
Filed — Alteration
This project consist of renovations to portions of the first floor of an existing outpatient dialysis center located in a once-story single tenant building. There will be no change in use, egress, or occupancy.
S00925224-I1
08/25/2023
Signed off — Alteration
S00920876-I1
08/23/2023
Permit issued — Mechanical Systems
S00920876-I1-MS
08/18/2023
Filed — Alteration
S00920876-I1
06/24/2022
Signed off — Alteration
Replacement of existing (2) gas risers and branch lines from the output side of meter bar from two existing gas meters to supply existing equipment in order to comply with LL 152/16
S00578150-I1
04/28/2022
Filed — Alteration
Replacement of existing (2) gas risers and branch lines from the output side of meter bar from two existing gas meters to supply existing equipment in order to comply with LL 152/16
S00578150-P1
04/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
Latest 60 of 65 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ISLAND REHAB SERVICES1407/08/2026
BRIDGE MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINNACLE ENGINEERS PC605/22/2024
PETRVS305/21/2024
RONALD D.VICTORIO R.A.308/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOHLER ENGINEERING903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECC GROUP INCGeneral Contractor707/08/2026
BUILDING CONCEPTS INCGeneral Contractor203/21/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
TRISTAR PLBG & HTG INCPlumbing107/08/2026
TRUE NORTH MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PE AND CONSULTANTS NEW YO8161905/22/2024
A TECH ENGINEERING NYC, P6738108/18/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTRISTAR PLBG & HTG INC01/22/2024
DOB NOWGeneral ConstructionSigned-offECC GROUP INC01/10/2024
DOB NOWMechanical SystemsSigned-offECC GROUP INC01/10/2024
DOB NOWMechanical SystemsSigned-offECC GROUP INC12/12/2023
DOB NOWMechanical SystemsSigned-offBUILDING CONCEPTS INC08/23/2023
DOB NOWPlumbingSigned-offTRUE NORTH MECHANICAL LLC12/11/2021
BISPLISSUEDEMPIRE PLUMBING INC08/05/2011
BISMHISSUEDKELAIR INC07/26/2005
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/28/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
05/28/2024PreliminarySRINIVAS THIMMAPPAprogress
05/28/2024Mechanical SystemsDEV SRINIVASspecial
05/28/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
05/28/2024FinalSRINIVAS THIMMAPPAprogress
05/09/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
05/09/2024FinalSRINIVAS THIMMAPPAprogress
05/09/2024PreliminarySRINIVAS THIMMAPPAprogress
05/09/2024Mechanical SystemsDEV SRINIVASspecial
05/09/2024FinalSRINIVAS THIMMAPPAprogress
05/09/2024PreliminarySRINIVAS THIMMAPPAprogress
05/09/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
05/09/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
02/29/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
02/29/2024FinalSRINIVAS THIMMAPPAprogress
02/29/2024PreliminarySRINIVAS THIMMAPPAprogress
02/29/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
02/29/2024PreliminarySRINIVAS THIMMAPPAprogress
02/29/2024FinalSRINIVAS THIMMAPPAprogress
02/29/2024Mechanical SystemsDEV SRINIVASspecial
02/29/2024Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026S00578150-P1Request digital key ↗
08/22/2026S00920876-I1Request digital key ↗
08/22/2026S00926636-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/02/2011520074080Open ↗
▸BISWORK PERMIT APPLICATION1
08/08/2011520074080Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/22/2026S00920876-I1Open ↗
08/22/2026S00926636-P1Open ↗
08/22/2026S00926636-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026S00926636-P2Open ↗
09/01/2026S00926625-P1Open ↗
09/01/2026S00926625-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026S00926625-P1Open ↗
09/01/2026S00926625-P1Open ↗
09/01/2026S00926625-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/02/2011520074080Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/02/2011520074080Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/02/2011520074080Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/02/2011520074080Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/22/2026S00926636-P1Open ↗
08/22/2026S00926636-I1Open ↗
08/21/2026S00925224-P1Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/02/2011520074080Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/02/2011520074080Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/02/2011520074080Open ↗