ECB03/13/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #39518594X, FILE A CERTIFICATE OF CORRECTION$6K due
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
ECB02/08/2024FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER: ATOI STORM DRAIN DISCONNECTED WITH A OPEN END & CAN DISTRIBUTE STORM WATER IN A NEGATIVE WAY AT THE REAR YARD CONTRARY TO PC 1101.2., REPAIR AND/OR REPLA$3K due
DOB10/04/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB06/30/202328-302.1, FTM: ATOI ON A 2-STORY, MIXED USE, BRICK BUILDING, IN R3-2 -C2-2 DISTRICT, OBSERVED AT EXPOSURE 2, ALONG SCHENECTADY AVE, A HORIZONTAL CRACKS AT MULTIPLE LOCATIONS AT THE LEVEL OF THE PARAPET-WALL-BAS$12K due
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB03/01/2022INSTALL A TOTAL OF APPROXIMATELY 80 LINEAR FEET OF SIDEWALK SHED ALONG THE ENTIRE 2 STORY PORTION OF BUILDING ON THE AVENUE N, & SCHENECTADY AVENUE SIDES OF BUILDING
ECB03/01/2022CRACKS THAT HAVE BEEN PATCHED ON EXP 1 ( SCHENECTADY AVENUE SIDE) ARE OPEN AGAIN AND BIGGER LOOKS LIKE PARAPET WALLL IS MOVING INWARD, ALSO NEW CRACKS ON EXP 4 (AVENUE N SIDE) OPENED UP ABOUT AN 1 IN SOME PARTS$12K due
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
ECB04/08/2019FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 4 ROOF LEADER(DRAIN) LEAKING AND DRAINING ONTO THE PREMISES AT 4703 AVE N AND NOT TIED INTO THE SANITARY WASTE SYSTEM AND AS SUCH IS N$3K due
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB12/12/2001V-DOB VIOLATION - ACTIVE
DOB12/12/2001V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
ECB09/25/200632A/B4B/BQ9/36/50A/50B/50C/50I/50D/50F/50G/50H/50A-EXPOSED WIRING/BQ9-NO WORK PERMIT ISSUED FOR NEW BL/50B-FLUE PIPE NOT SEALED @ CHIMNEY/50C-WATER LEAK @ CIRCULATOR /50D-DEBRIS TO BE CLEANED FROM BL RMNothing owed — awaiting certificate of correction
Predominantly retail with other uses · 2,000 sf lot · 1.29 FAR built · Flood zone X500