← Back
BuildNYC
BROOKLYN
4706 CHURCH AVENUE
BROOKLYN · BIN 3102748
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Active Violations 2 likely answered ▸FDNY Report ↗
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Syed Engineering109/01/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Magic FoamGeneral Contractor303/21/2026
William Hird & Co UncFire Protection105/16/2007
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Syed Engineering7054109/01/2023
Building Lifecycle
04/13/2026
Work without a permit. New gas piping installed at gas meter labeled 2ND floor. Nipple and appliance valve installed at bottom of old drip tee. No…
ECB violation · open
04/13/2026
Failure to maintain. Future connection installed at gas meter labled 2ND floor. Gas pipe uncapped, open gas piping poses a hazard. Future…
ECB violation · open
11/13/2025
Boiler inspection report filed
Initial · no defects · Accepted
09/12/2025
VC5: failed to (maintain/produce) records for operation of commercial kitchen and/or inspection, testing, and maintenance of appliance, device,…
FDNY_NOV violation · closed
11/12/2024
Boiler inspection report filed
Initial · no defects · Accepted
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Magic Foam—
BIS—William Hird & Co Unc—
Nothing on file for this building.
Nothing on file for this building.
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account