← Back
BuildNYC
Over six families without stores
Fac Joe Shelter Retrofit Ghpp
4707 4TH AVENUE · BIN 3012214
💬 Discuss this project
1923Year Built
4Stories
C1Building Class
R7AZoning
6,380 sfGross Floor Area
8Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: Fac Cluster Housing Development Fund Corp Poration · 2,500 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 1 filing · 20 docs
Floor 4Under Construction22p · 1 filing · 20 docs
Floor 3Under Construction19p · 1 filing · 20 docs
Floor 2Under Construction18p · 1 filing · 20 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction26p · 2 filings · 20 docs
CellarUnder Construction25p · 1 filing · 20 docs
Site & exteriorMaterial storage9p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fifth Ave Committee2007/08/2026
NYC Department of Housing Preservation and Development803/21/2026
Fac - Restore - HDFC203/21/2026
Neighborhood Partnership Housing203/21/2026
Fac Cluster Housing Development Fund Corp Poration103/22/2026
Joe Fac Infinity103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Amal Hassan Hassan210/13/2025
Mje Professional Services103/26/2025
Old Structures Engineering105/14/2024
L. Naoum, P.E., P. C305/08/2024
Eskw/A104/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants503/21/2026
Rigid Structural Design403/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor707/08/2026
MSR ConstructionScaffold304/09/2026
Reliable EnterprisesScaffold204/09/2026
AJC Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803505/14/2024
Building Lifecycle
All (69)Filed (8)Permit Issued (12)Signed Off (2)Violation (31)Special Inspection (16)
06/26/2026
Signed off — Alteration
B01282700-I1
06/26/2026
Signed off — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01291197-I1
06/02/2026
Permit issued — Boiler Equipment
B01020662-S4-BE
04/30/2026
Violation issued (HPD, closed)
A
03/13/2026
Permit issued — Sidewalk Shed
B01201023-I1-SH
03/03/2026
Permit issued — General Construction
B01020662-I1-GC
03/02/2026
Permit issued — Structural
B01020662-S3-ST
03/02/2026
Permit issued — Mechanical Systems
B01020662-S2-MS
01/29/2026
Permit issued — Mechanical Systems
B01020662-S2-MS
10/15/2025
Permit issued — Plumbing
B01020662-S1-PL
10/14/2025
Permit issued — Protection and Mechanical Methods
B01291197-I1-PMM
10/13/2025
Filed — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01291197-I1
09/22/2025
Permit issued — Supported Scaffold
B01282700-I1-SF
09/19/2025
Filed — Alteration
B01282700-I1
04/07/2025
Violation issued (HPD, closed)
C
03/26/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01201023-I1
03/26/2025
Permit issued — Sidewalk Shed
B01201023-I1-SH
03/05/2025
Permit issued — General Construction
B01020662-I1-GC
03/04/2025
Permit issued — Structural
B01020662-S3-ST
01/19/2025
Violation issued (HPD, closed)
C
01/19/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
C
05/14/2024
Filed — Alteration
BOILER REPLACEMENT. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020662-S3
05/14/2024
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
05/14/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
05/08/2024
Filed — Alteration
BOILER REPLACEMENT. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020662-S4
05/03/2024
Filed — Alteration
BOILER REPLACEMENT. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020662-S1
05/03/2024
Filed — Alteration
BOILER REPLACEMENT. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020662-S2
05/03/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/03/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/02/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
04/19/2024
Violation issued (FDNY_NOV, closed)
04/19/2024
Violation issued (FDNY_NOV, closed)
04/03/2024
Violation issued (HPD, closed)
A
04/02/2024
Filed — Alteration
BOILER REPLACEMENT. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020662-I1
03/15/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
03/15/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
03/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/15/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
11/10/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
09/21/2019
Violation issued (HPD, closed)
A
05/25/2019
Violation issued (HPD, closed)
B
04/17/2015
Violation issued (HPD, closed)
C
04/17/2015
Violation issued (HPD, closed)
B
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/1999
Violation issued (ECB, closed)
Construction
01/16/1998
Violation issued (ECB, closed)
Construction
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedAJC Plumbing & Heating06/02/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises03/13/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/03/2026
DOB NOWStructuralPermit IssuedA.A.D. Construction03/02/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction03/02/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction01/29/2026
DOB NOWPlumbingPermit IssuedAJC Plumbing & Heating10/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR Construction10/14/2025
DOB NOWSupported ScaffoldSigned-offMSR Construction09/22/2025
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises03/26/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/05/2025
DOB NOWStructuralPermit IssuedA.A.D. Construction03/04/2025
BISPLISSUEDWilliam C. Gerakaris P&H02/26/2009
BISSPISSUEDAura Plumbing01/08/2009
BISEQISSUEDCrescent Street Construction05/12/2008
BISPLISSUEDWilliam C. Gerakaris P&H11/19/2007
BIS—ISSUEDCrescent Street Construction11/09/2007
BISEQISSUEDCrescent Street Construction11/09/2007
BISPLISSUEDWilliam C. Gerakaris P&H11/14/2005
BIS—ISSUEDCrescent Street Construction06/06/2005
BISBLISSUEDEast Coast Petroleum01/07/2002
BISOTISSUEDLilly Construction03/30/2000
BISOTISSUEDF Contracting07/16/1998
BISOTISSUEDF Contracting06/18/1998
BISOTISSUEDF Contracting04/13/1998
BISBLISSUEDMetropolitan Heat & Power Co03/14/1997
1 project · most recent 05/14/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/14/2024Permit IssuedAJC Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 03/27/2025
FiledStatusContractorScope
03/27/2025CompleteRichard Neu—
1 project · most recent 05/14/2024
Steel Masonry
FiledStatusContractorScope
05/14/2024Permit IssuedAJC Plumbing & HeatingSteel, Masonry
1 project · most recent 03/26/2025
Sidewalk Shed
FiledStatusContractorScope
03/26/2025Permit IssuedReliable EnterprisesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/14/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
05/14/2024MasonrySAMI HAJJAR P.Especial
05/03/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/03/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/03/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/03/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/03/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/03/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/03/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/02/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/02/2024Heating SystemsSAMI HAJJAR P.Especial
03/15/2024Mechanical SystemsSAMI HAJJAR P.Especial
03/15/2024FinalSAMI HAJJAR P.Eprogress
03/15/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/15/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/15/2024FinalSAMI HAJJAR P.Eprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026B01020662-S2Request digital key ↗
08/25/2026B01020662-S1Request digital key ↗
08/25/2026B01020662-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026B01020662-S1Open ↗
08/25/2026B01020662-I1Open ↗
08/25/2026B01020662-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026B01020662-S2Open ↗
08/30/2026B01020662-S2Open ↗
08/28/2026B01020662-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026B01020662-S2Open ↗
08/28/2026B01020662-S1Open ↗
08/28/2026B01020662-S3Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/25/2026B01020662-I1Open ↗
08/25/2026B01020662-S4Open ↗
08/25/2026B01020662-S3Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/25/2026B01020662-S1Open ↗
08/25/2026B01020662-I1Open ↗
08/25/2026B01020662-S2Open ↗
Showing 3 of 5 on file for this type