Elevator apt, fireproof with stores
Laurence Tower
471 3 AVENUE · BIN 1020078
💬 Discuss this project
1972Year Built
33Stories
D6Building Class
C1-9Zoning
351,560 sfGross Floor Area
311Units
LL97 CoveredRent Stabilized37 Open Violations 36 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: PLAZA REALTY INVESTORS, DE 1, LLC · 24,237 sf lot · 14.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 10 docs
Floor 114p · 4 filings · 20 docs
CellarUnder Construction25p · 6 filings · 20 docs
Sub-Cellar11p · 1 filing · 20 docs
Basement1p · 1 filing · 10 docs
1 job · most recent 08/09/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/09/2023Signed-offBEKGLOBAL INCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXB09AXVJU 9,000 BTU · Condensing Unit ×8
4MXS36RMVJUA 36,000 BTU · Condensing Unit ×1
2 jobs · most recent 10/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/08/2025Permit IssuedCHAMP PLUMBING & HTG CORPGas
03/15/2023Permit IssuedARCO PLBG AND HTG INCWater/Sanitary
22 jobs · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026Permit IssuedAKAY ELECTRIC CORPORATIONGeneral Wiring
03/07/2026CancelledAKAY ELECTRIC CORPORATIONGeneral Wiring
02/11/2026CompleteAKAY ELECTRIC CORPORATIONGeneral Wiring
11/10/2025CompleteAKAY ELECTRIC CORPORATION—
09/08/2025Permit IssuedSCIENTIFIC ELEC. CO. INC—
03/27/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/20/2023CompleteATMOS ELECTRIC SVCE CORP—
11/29/2023CompletePRECISION ELECL CONT CORPGeneral Wiring
06/03/2023CompleteDELUXE ELECL & MAINT CORP1 meters, 1 new_meters
04/20/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
04/10/2023CompleteFUSION ELECTL CONTRNG LLCGeneral Wiring
03/07/2023CancelledAKAY ELECTRIC CORPORATION1 meters, 1 new_meters
02/05/2023CompleteLENS ELECTRIC, INCGeneral Wiring
08/05/2021Permit IssuedROBERT CHIMENTI14 meters, 1 new_meters
03/16/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 job · most recent 02/07/2025
Concrete
FiledStatusContractorScope
02/07/2025Permit IssuedSTARK CONSTRUCTION GROUPConcrete
2 jobs · most recent 05/17/2021
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/17/2021Permit IssuedAR CONTRACTING GROUP INCSidewalk Shed
05/23/2019Permit IssuedAR CONTRACTING GROUP INCScaffold
Building Lifecycle
All (198)Filed (33)Permit Issued (26)Signed Off (10)Facade (FISP) (15)Violation (60)Inspection (18)Objection (6)Special Inspection (30)
05/27/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
05/08/2026
Violation issued (ECB, open)
Zoning
04/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/13/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Violation issued (HPD, closed)
B
03/25/2026
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2025
Permit issued — Boiler Equipment
M01283429-I1-BE
10/20/2025
Permit issued — Plumbing
M01283429-S1-PL
10/08/2025
Filed — Alteration
REFILING OF BIS# 122222692 FOR INSTALLATION OF NEW GAS METER, GAS BOOSTER PUMP, AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01283429-I1
10/08/2025
Filed — Alteration
REFILING OF BIS# 122222692 FOR INSTALLATION OF NEW GAS METER, GAS BOOSTER PUMP, AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01283429-S1
10/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/08/2025
Special inspection requirement — Maintenance information
Stephen Shishko
10/08/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Stephen Shishko
10/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
10/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
09/08/2025
Permit issued — General Construction
M01274805-I1-GC
09/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
09/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
08/21/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING OFFICES ON 1ST FLOOR. INTERIOR DEMOLITION OF NON-LOAD BEARING WALLS ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01274805-I1
08/20/2025
Special inspection requirement — Interior lighting power
LAWRENCE MAREK
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE MAREK
08/20/2025
Special inspection requirement — Lighting controls
LAWRENCE MAREK
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE MAREK
08/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
LAWRENCE MAREK
08/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
LAWRENCE MAREK
07/08/2025
Signed off — Alteration
M01165185-I1
07/02/2025
Permit issued — Mechanical Systems
M01165185-I1-MS
04/18/2025
Violation issued (HPD, closed)
C
04/18/2025
Violation issued (HPD, closed)
C
04/07/2025
Filed — Alteration
M01165185-I1
02/07/2025
Filed — Alteration
INSTALLATION OF CONCRETE PAD AND MISCELLANEOUS GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00901122-P4
02/03/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
02/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
02/03/2025
Special inspection requirement — Final
Anthony Stasio
02/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/21/2024
Filed — Alteration
INSTALLATION OF CONCRETE PAD AND MISCELLANEOUS GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00901122-P3
08/10/2024
Special inspection requirement — Post-installed Anchors
Anthony Stasio
08/10/2024
Special inspection requirement — Final
Anthony Stasio
08/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
08/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
03/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/12/2024
Signed off — Alteration
M00959245-I1
02/09/2024
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
12/18/2023
Permit issued — Structural
M00901122-I1-ST
Latest 60 of 198 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALGIN MANAGEMENT5707/08/2026
AR CONTRACTING GROUP1507/08/2026
ELIKASHVILI & KULICK DENTAL ASSOCIA607/08/2026
145 EAST 27TH STREET1003/22/2026
PLAZA REALTY INVESTORS, DE 1, LLC103/22/2026
PLAZA REALTY INVESTORS2203/22/2026
C/O ALIGN MANAGEMENT PLAZ103/22/2026
LEEDING BUILDERS GROUP LL203/22/2026
LAURENCE TOWERS GARAGE CO403/22/2026
LAEX TAGE C/O MIDSTATE CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING1003/21/2026
CHERICO KING ARCHITECT P.C.2203/21/2026
BMB BUILDING CONSULTING403/21/2026
LMS-ACE SERVICES203/21/2026
2260 MAG203/21/2026
JAM CONSULTANTS, INC.203/21/2026
MP DESIGN AND CONSTRUCTION403/21/2026
A1 EXPEDITING SERVICE403/21/2026
LEEKODESIGN203/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AR CONTRACTING GROUP INCGeneral Contractor1907/08/2026
BEKGLOBAL INCGeneral Contractor603/21/2026
VELOCITY PLUMBING & HEATPlumbing307/08/2026
STARK CONSTRUCTION GROUPGeneral Contractor303/21/2026
FGG CONTRACTING INCGeneral Contractor303/21/2026
FRANCHISE INTERIOR DEVELOGeneral Contractor307/08/2026
LRJ CONSTRUCTION LLCGeneral Contractor203/21/2026
JOSEPH WEINSTEIN ELECTRICElectrical203/22/2026
CLIFTON WALDRONElectrical203/21/2026
LHS INTERNATIONAL INCGeneral Contractor107/08/2026
OLYMPOS CORPGeneral Contractor104/09/2026
UNITECH DESIGN INCGeneral Contractor107/08/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
REEM PLBG & HTG CORPPlumbing107/08/2026
SERVICE SIGN ERECTORSScaffold107/08/2026
AKAY ELECTRIC CORPORATIONElectrical103/22/2026
UNITECH DESIGNScaffold107/08/2026
ATUL KELUSKARElectrical103/21/2026
ESPOSITO, RICHARDElectrical103/21/2026
FRANK LA GREGAElectrical103/21/2026
LEKTRIC INSTALLATIONS CORElectrical103/22/2026
PRECISION ELECL CONT CORPElectrical103/22/2026
RICHARD ESPOSITOElectrical103/21/2026
SCIENTIFIC ELEC. CO. INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746410/08/2025
CHERICO KING ARCHITECT PC56741108/21/2025
FRAME DESIGN AND CONSTRUC7971104/07/2025
MT GROUP798204/07/2025
EDG2578402/07/2025
HAMANN ENGINEERING, PLLC4949508/09/2023
PROSPECT ENGINEERING P.C.2775105/05/2023
BUILDTECH ENGINEERING6369203/15/2023
CONCESSI ENGINEERING, P.C540103/11/2023
SOYU ARCHITECTURE, INC.7399205/08/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP10/20/2025
DOB NOWPlumbingPermit IssuedCHAMP PLUMBING & HTG CORP10/20/2025
DOB NOWGeneral ConstructionPermit IssuedOLYMPOS CORP09/08/2025
DOB NOWMechanical SystemsSigned-offFRANCHISE INTERIOR DEVELO07/02/2025
DOB NOWStructuralPermit IssuedSTARK CONSTRUCTION GROUP12/18/2023
DOB NOWSignSigned-offUNITECH DESIGN INC11/29/2023
DOB NOWGeneral ConstructionSigned-offUNITECH DESIGN INC05/18/2023
DOB NOWGeneral ConstructionSigned-offLRJ CONSTRUCTION05/15/2023
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP05/03/2023
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC03/30/2023
DOB NOWMechanical SystemsSigned-offBEKGLOBAL INC03/03/2023
DOB NOWGeneral ConstructionPermit IssuedBEKGLOBAL INC01/12/2023
DOB NOWGeneral ConstructionPermit IssuedFRANCHISE INTERIOR DEVELO11/14/2022
DOB NOWGeneral ConstructionSigned-offFGG CONTRACTING INC02/22/2022
DOB NOWSidewalk ShedPermit IssuedAR CONTRACTING GROUP INC06/29/2021
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT11/18/2020
DOB NOWSupported ScaffoldPermit IssuedAR CONTRACTING GROUP INC06/10/2020
DOB NOWSidewalk ShedPermit IssuedAR CONTRACTING GROUP INC06/10/2020
DOB NOWSupported ScaffoldPermit IssuedAR CONTRACTING GROUP INC05/21/2020
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT03/20/2020
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT02/28/2020
DOB NOWMechanical SystemsSigned-offLHS INTERNATIONAL INC12/28/2019
DOB NOWSidewalk ShedPermit IssuedAR CONTRACTING GROUP INC07/11/2019
DOB NOWSupported ScaffoldPermit IssuedAR CONTRACTING GROUP INC05/24/2019
DOB NOWSidewalk ShedPermit IssuedAR CONTRACTING GROUP INC01/31/2019
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO02/22/2018
BISFBISSUEDSTUART N SCHWARTZ09/13/2024
BISPLISSUEDTRADELINE PLUMBING INC09/13/2024
BISFBISSUEDSTUART N SCHWARTZ12/11/2023
BISPLISSUEDTRADELINE PLUMBING INC04/07/2023
BISFBISSUEDSTUART N SCHWARTZ04/07/2023
BISOTISSUEDAR CONTRACTING GROUP INC06/24/2021
BISOTISSUEDAR CONTRACTING GROUP INC07/06/2020
BISOTISSUEDLRJ CONSTRUCTION LLC02/28/2020
BISOTISSUEDLRJ CONSTRUCTION LLC02/26/2020
BISOTISSUEDLRJ CONSTRUCTION LLC01/29/2020
BISBLISSUEDWASOFF PLBG & UTILITY CO12/06/2019
BISOTISSUEDAR CONTRACTING GROUP INC06/19/2019
BISOTISSUEDAR CONTRACTING GROUP INC05/30/2019
BISOTISSUEDM.B.KIM,ARCHITECT,P.C08/28/2018
+ 36 more permits on file
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
05/27/2026Fail-Final Boiler Equipment InspectionFailView ↗
04/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/13/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2024Pass-Final Sign Permit InspectionPassView ↗
08/01/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/31/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2023Fail-Final Boiler Equipment InspectionFailView ↗
11/17/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
05/27/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
10/08/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
10/08/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Shishkospecial
10/08/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
10/08/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
10/08/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/08/2025Maintenance informationStephen Shishkoenergy_progress
10/08/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/08/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
09/08/2025Tenant Protection Plan ComplianceStephen Shishkospecial
09/08/2025Tenant Protection Plan ComplianceStephen Shishkospecial
08/20/2025Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
08/20/2025Interior lighting powerLAWRENCE MAREKenergy_progress
08/20/2025Fire-Resistance Rated ConstructionLAWRENCE MAREKprogress
08/20/2025Energy Code Compliance InspectionsLAWRENCE MAREKprogress
08/20/2025Tenant Protection Plan ComplianceLAWRENCE MAREKspecial
08/20/2025Lighting controlsLAWRENCE MAREKenergy_progress
02/03/2025FinalAnthony Stasioprogress
02/03/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
02/03/2025Tenant Protection Plan Compliance—special
02/03/2025Post-installed AnchorsAnthony Stasiospecial
08/10/2024FinalAnthony Stasioprogress
08/10/2024Post-installed AnchorsAnthony Stasiospecial
08/10/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
08/10/2024Tenant Protection Plan Compliance—special
09/21/2023FinalAnthony Stasioprogress
Latest 25 of 70.
▾Documents — 471 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch23
09/06/2026M00011682-I1Request digital key ↗
09/01/2026M00765515-I1Request digital key ↗
09/01/2026M00765516-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00316546-I1Request digital key ↗
09/05/2026M00319934-I1Request digital key ↗
09/05/2026M00319934-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00260712-I1Request digital key ↗
08/15/2026M00260712-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/03/2026M00122172-I1Request digital key ↗
08/15/2026M00122172-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00170940-I1Request digital key ↗
▸Applications & Permits81
▸BISWORK PERMIT APPLICATION42
04/10/2023122222692Open ↗
04/10/2023122222692Open ↗
04/10/2023122222692Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION39
03/22/2023122222692Open ↗
03/20/2023122222692Open ↗
12/09/2022122222692Open ↗
Showing 3 of 39 on file for this type
▸Seals & Professional Certifications133
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/05/2026M00319934-I1Open ↗
09/05/2026M00319934-P1Open ↗
09/04/2026M00290885-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/26/2026M01283429-I1Open ↗
09/26/2026M01283429-I1Open ↗
09/06/2026M00659945-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
08/21/2018123401540Open ↗
05/01/2018123432927Open ↗
04/12/2017122170257Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/26/2026M01283429-I1Open ↗
09/26/2026M01283429-I1Open ↗
09/26/2026M01283429-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
01/03/2020140882560Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/21/2018123401540Open ↗
04/14/2016122754340Open ↗
12/18/2014122222692Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
01/03/2020140882560Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
01/03/2020140882560Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/18/2014122222692Open ↗
12/18/2014122222692Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/18/2014122222692Open ↗
▸Safety & Tenant Protection16
▸DOB NOWTenant Protection Plan10
09/05/2026M00319934-I1Open ↗
09/05/2026M00319934-P1Open ↗
09/04/2026M00290885-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES6
04/05/2023122222692Open ↗
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos44
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/05/2026M00319934-I1Open ↗
09/05/2026M00319934-P1Open ↗
09/01/2026M08052512-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
08/21/2018123401540Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/04/2026M00290885-I1Open ↗
09/01/2026M00765515-I1Open ↗
09/01/2026M00765516-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/03/2020140882560Open ↗
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
08/21/2018123401540Open ↗
05/01/2018123432927Open ↗
04/12/2017122170257Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
03/16/2022123432927Open ↗
10/01/2021140882560Open ↗
06/23/2021140887397Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/16/2022123432927Open ↗
11/12/2020123401540Open ↗
04/12/2017122170257Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
06/17/2021140887397Open ↗
06/17/2021140888207Open ↗
06/16/2021140882560Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
01/03/2020140882560Open ↗
▸BISNYCECC ANALYSIS3
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
01/03/2020140882560Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
06/23/2014121777194Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
03/16/2022123432927Open ↗
10/01/2021140882560Open ↗
06/23/2021140887397Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
03/17/2022123432927Open ↗
10/01/2021140882560Open ↗
06/23/2021140887397Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER4
04/10/2023122222692Open ↗
04/10/2023122222692Open ↗
04/10/2023122222692Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/18/2019123401540Open ↗
05/07/2015121634650Open ↗
▸BISSHED LETTER1
02/26/2015140100272Open ↗
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT30
03/16/2022123432927Open ↗
03/08/2022123432927Open ↗
03/08/2022123432927Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
06/17/2021140887397Open ↗
06/17/2021140888207Open ↗
06/16/2021140882560Open ↗
▸Filing & Intake Forms41
▸BISBOROUGH INTAKE FORM15
04/10/2023122222692Open ↗
04/10/2023122222692Open ↗
04/10/2023122222692Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET12
08/21/2018123401540Open ↗
05/01/2018123432927Open ↗
04/14/2016122754340Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION8
05/13/2021140849296Open ↗
11/06/2020140888207Open ↗
09/21/2020140882560Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/20/2020140888207Open ↗
02/13/2020140887397Open ↗
01/03/2020140882560Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type