← Back
BuildNYC
Office with apartments (no commercial)
472 5TH AVENUE
BROOKLYN · Park Slope · BIN 3022550
💬 Discuss this project
1921Year Built
3Stories
O8Building Class
C4-3AZoning
6,144 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Office with apartments (no commercial) · Owner of record: Delta Properties NY · 2,394 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsNoble Dental Care PC2 filings
RoofNoble Dental Care PC2 filings · 20 docs
Floor 5Payless1 filing
Floor 4Payless, Unit 4721 filing
Floor 3Noble Dental Care PC, Payless2 filings · 12 docs
Floor 2Noble Dental Care PC, Payless2 filings · 12 docs
Floor 1Noble Dental Care PC, Payless3 filings · 20 docs
CellarNoble Dental Care PC1p · 1 filing · 12 docs
Site & exteriorHeavy duty sidewalk shed1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Alpha Associates307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stewart1105/18/2026
Enthink Engineers108/12/2022
Norman C. Lok, PE104/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Anch Construction ServicesGeneral Contractor904/09/2026
MNK EnterprisesScaffold303/21/2026
Night Hawk Plumbing & HeatingPlumbing207/08/2026
Lintech ElectricElectrical103/22/2026
Capitol Design & MaintenanceSign hanger107/08/2026
G. Rollins Plumbing & HeatingPlumbing107/08/2026
G Rollins Plumbing & HeatingGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Stewart Engineering Services25061105/18/2026
Building Lifecycle
All (59)Filed (13)Permit Issued (9)Signed Off (3)Violation (4)Inspection (4)Special Inspection (26)
07/23/2026
Signed off — Alteration
Install an HVAC Unit on the 1st Floor Roof and associated ductwork on the 1st Floor
B00536607-I1
05/18/2026
Filed — Alteration
Install an HVAC Unit on the 1st Floor Roof and associated ductwork on the 1st Floor
B00536607-P1
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EGAR STEWART
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
EGAR STEWART
05/18/2026
Special inspection requirement — Mechanical Systems
EGAR STEWART
05/18/2026
Special inspection requirement — Final
EGAR STEWART
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
EGAR STEWART
04/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EGAR STEWART
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
EGAR STEWART
04/22/2026
Special inspection requirement — Mechanical Systems
EGAR STEWART
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
04/22/2026
Special inspection requirement — Final
EGAR STEWART
04/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
EGAR STEWART
09/22/2025
Permit issued — Mechanical Systems
B00536607-I1-MS
09/15/2025
Filed — Alteration
Install an HVAC Unit on the 1st Floor Roof and associated ductwork on the 1st Floor
B00536607-I1
02/23/2023
Signed off — Alteration
B00792206-I1
09/23/2022
Permit issued — Plumbing
B00536602-I1-PL
09/09/2022
Filed — Alteration
B00536605-P5
09/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
EGAR STEWART
09/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
09/09/2022
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
09/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
09/08/2022
Special inspection requirement — Sprinkler Systems
09/07/2022
Filed — Alteration
Install plumbing piping, water closet, lavatory basin, sinks, dental systems, bath tubs, gas range and HVAC units
B00536602-P2
09/07/2022
Filed — Alteration
B00535630-P3
08/12/2022
Filed — Alteration
B00792206-I1
08/12/2022
Permit issued — Sidewalk Shed
B00792206-I1-SH
03/22/2022
Permit issued — General Construction
B00535630-I1-GC
12/07/2021
Filed — Alteration
B00536605-P1
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
12/03/2021
Special inspection requirement — Sprinkler Systems
11/23/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2021
Filed — Alteration
Install plumbing piping, water closet, lavatory basin, sinks, dental systems, bath tubs, gas range and HVAC units
B00536602-P1
09/28/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2021
Permit issued — General Construction
B00535630-I1-GC
09/07/2021
Filed — Alteration
B00536605-I1
08/03/2021
Permit issued — Plumbing
B00536602-I1-PL
07/26/2021
Filed — Alteration
Install plumbing piping, water closet, lavatory basin, sinks, dental systems, bath tubs, gas range and HVAC units
B00536602-I1
07/26/2021
Filed — Alteration
B00535630-P1
07/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
07/26/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
07/26/2021
Special inspection requirement — Final
EGAR STEWART
07/26/2021
Special inspection requirement — Fire-Resistance Rated Construction
EGAR STEWART
07/26/2021
Special inspection requirement — Lighting controls
EGAR STEWART
07/26/2021
Special inspection requirement — Insulation placement and R values
EGAR STEWART
07/26/2021
Special inspection requirement — Interior lighting power
EGAR STEWART
07/15/2021
Permit issued — General Construction
B00535630-I1-GC
06/11/2021
Permit issued — General Construction
B00535630-I1-GC
06/09/2021
Filed — Alteration
B00535630-I1
05/08/2018
Signed off — Alteration
B00032909-I1
04/18/2018
Permit issued — Sign
B00032909-I1-SG
04/16/2018
Filed — Alteration
B00032909-I1
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/1997
Violation issued (ECB, closed)
Construction
09/12/1991
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
09/12/1991
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAnch Construction Services09/22/2025
DOB NOWPlumbingPermit IssuedNight Hawk Plumbing & Heating09/23/2022
DOB NOWSidewalk ShedSigned-offMNK Enterprises08/12/2022
DOB NOWGeneral ConstructionPermit IssuedAnch Construction Services03/22/2022
DOB NOWGeneral ConstructionPermit IssuedAnch Construction Services09/13/2021
DOB NOWPlumbingPermit IssuedG. Rollins Plumbing & Heating08/03/2021
DOB NOWGeneral ConstructionPermit IssuedAnch Construction Services07/15/2021
DOB NOWGeneral ConstructionPermit IssuedAnch Construction Services06/11/2021
DOB NOWSignSigned-offCapitol Design & Maintenance04/18/2018
BISOTISSUEDPro N.Y. Solutions10/17/2020
BIS—ISSUEDUniversal Unlimited10/22/1991
BISSPISSUEDCapitol Firs Sprinkler07/26/1991
BISEQISSUEDStegla Construction07/22/1991
BISPLISSUEDEconomy Plumbing & Heating Co07/11/1991
BISEQISSUEDStegla Construction07/03/1991
BISMHISSUEDStegla Construction07/03/1991
1 project · most recent 05/18/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Signed-offAnch Construction ServicesAir Conditioning Systems, Heating Systems
Cooling
Rheem RHEEM Model # RGEDZR120CA222A 118,000 BTU · Packaged Unit ×4
Heating
Rheem RHEEM Model # RGEDZR120CA222A 225,000 BTU · Packaged Unit ×4
1 project · most recent 09/07/2022
Gas Water/Sanitary
FiledStatusContractorScope
09/07/2022Permit IssuedNight Hawk Plumbing & HeatingGas, Water/Sanitary
3 projects · most recent 08/12/2022
General Wiring
FiledStatusContractorScope
08/12/2022Permit IssuedRichard Neu—
05/28/2021Permit IssuedLintech ElectricGeneral Wiring
05/03/2018CompleteMerit Electrical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/18/2026HVAC-R and service water piping design and insulationEGAR STEWARTenergy_progress
05/18/2026HVAC-R and service water heating system controlsEGAR STEWARTenergy_progress
05/18/2026Mechanical SystemsEGAR STEWARTspecial
05/18/2026FinalEGAR STEWARTprogress
05/18/2026Energy Code Compliance InspectionsEGAR STEWARTprogress
05/18/2026HVAC-R and service water heating equipmentEGAR STEWARTenergy_progress
04/22/2026HVAC-R and service water piping design and insulationEGAR STEWARTenergy_progress
04/22/2026HVAC-R and service water heating system controlsEGAR STEWARTenergy_progress
04/22/2026Mechanical SystemsEGAR STEWARTspecial
04/22/2026Energy Code Compliance InspectionsEGAR STEWARTprogress
04/22/2026FinalEGAR STEWARTprogress
04/22/2026HVAC-R and service water heating equipmentEGAR STEWARTenergy_progress
09/09/2022HVAC-R and service water heating equipmentEGAR STEWARTenergy_progress
09/09/2022Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
09/09/2022Energy Code Compliance InspectionsEGAR STEWARTprogress
09/08/2022Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
09/08/2022Sprinkler Systems—special
12/03/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
12/03/2021Sprinkler Systems—special
07/26/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
07/26/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
07/26/2021FinalEGAR STEWARTprogress
07/26/2021Fire-Resistance Rated ConstructionEGAR STEWARTprogress
07/26/2021Lighting controlsEGAR STEWARTenergy_progress
07/26/2021Insulation placement and R valuesEGAR STEWARTenergy_progress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Noble Dental Care PCMedical / HealthcareCellar, Floors 1–3, Roof
Project B00536607 Alteration · LOC Issued · 09/15/2025
Project B00536605 Alteration · Approved · 09/07/2021
Project B00536602 Alteration · Permit Entire · 07/26/2021
Project B00535630 Alteration · Permit Entire · 06/09/2021
PaylessRetailFloors 1–5
Project B00032909 Alteration · LOC Issued · 04/16/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026B00032909-I1Request digital key ↗
09/01/2026B00536605-P5Request digital key ↗
09/01/2026B00536605-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/06/2020340773130Open ↗
▸BISWORK PERMIT APPLICATION1
10/17/2020340773130Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature18
09/25/2026B00536607-I1Open ↗
09/25/2026B00536607-I1Open ↗
09/25/2026B00536607-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026B00032909-I1Open ↗
09/01/2026B00536605-P5Open ↗
09/01/2026B00536605-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/25/2026B00536607-I1Open ↗
08/31/2026B00535630-P1Open ↗
08/31/2026B00536607-P1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/06/2020340773130Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/06/2020340773130Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/06/2020340773130Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026B00032909-I1Open ↗
09/01/2026B00536605-P1Open ↗
09/01/2026B00536605-P5Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/06/2020340773130Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/12/2020340773130Open ↗
10/17/2020340773130Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/12/2020340773130Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/12/2020340773130Open ↗
10/06/2020340773130Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
11/12/2020340773130Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/06/2020340773130Open ↗