← Back
BuildNYC
BROOKLYN
472 EMERALD STREET
BROOKLYN · BIN 3430218
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active ViolationsFDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Soltage1 filing · 2 docs
Site & exteriorTemporary construction fence installationUnder Construction1p · 1 filing · 2 docs
Filed — no permit issuedDUMONT BESS PROJECT foundation and retaining walls36p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Soltage1409/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eqedsgn105/05/2026
WSP USA302/13/2026
WSP USA110/08/2025
WSP110/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York503/21/2026
K & M Associates503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Always First ServicesScaffold107/01/2026
Building Lifecycle
All (36)Filed (6)Permit Issued (1)Violation (5)Objection (13)Special Inspection (11)
06/03/2026
Permit issued — Construction Fence
B01394210-I1-FN
06/03/2026
Objection resolved — Resolved
05/15/2026
Objection resolved — Addressed
05/05/2026
Filed — Alteration
Installation of temporary construction fence as per plan.
B01394210-I1
02/23/2026
Objection raised — Other
02/23/2026
Objection raised — Other
02/23/2026
Objection raised — Other
02/23/2026
Objection raised — Other
02/23/2026
Objection raised — Other
02/13/2026
Filed — Alteration CO
B01279787-I1
02/06/2026
Filed — Alteration
Foundation and structural work associated with the installation of a new battery energy storage system
B01276874-S1
02/05/2026
Filed — Alteration
B01334723-I1
10/17/2025
Objection raised — Inspections
10/17/2025
Objection raised — Structural
10/17/2025
Objection raised — Scope
10/17/2025
Objection raised — Scope
10/17/2025
Objection raised — Structural
10/17/2025
Objection raised — Structural
10/08/2025
Filed — Alteration
DESIGN AND INSTALL A DRY NEW MANUAL FIXED WATER SPRAY SYSTEM IN ASSOCIATION WITH A NEW BATTERY ENERGY STORAGE SYSTEM
B01272823-I1
10/08/2025
Filed — Alteration
Foundation and structural work associated with the installation of a new battery energy storage system
B01276874-I1
09/05/2025
Special inspection requirement — Concrete - Precast
09/05/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/05/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/05/2025
Special inspection requirement — Structural Steel - Welding
09/05/2025
Special inspection requirement — Subgrade Inspections
09/05/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
08/25/2025
Special inspection requirement — Footing and Foundation
08/25/2025
Special inspection requirement — Masonry
08/25/2025
Special inspection requirement — Structural Steel - Details
08/25/2025
Special inspection requirement — Final
08/15/2025
Special inspection requirement — Sprinkler Systems
04/15/2024
Violation issued (ECB, closed)
Construction
10/24/2023
Violation issued (ECB, closed)
Construction
05/15/2023
Violation issued (ECB, closed)
Construction
05/15/2023
Violation issued (ECB, closed)
Construction
05/15/2023
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedAlways First Services06/03/2026
1 project · most recent 10/08/2025
FiledStatusContractorScope
10/08/2025——50 heads
1 project · most recent 02/06/2026
Steel Concrete Masonry
FiledStatusContractorScope
02/06/2026——Steel, Concrete, Masonry
1 project · most recent 05/05/2026
Fence
FiledStatusContractorScope
05/05/2026Permit IssuedAlways First ServicesFence
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/05/2025Concrete - Precast—special
09/05/2025Structural Steel - High Strength Bolting—special
09/05/2025Subsurface Investigations (Borings/Test Pits)—special
09/05/2025Structural Steel - Welding—special
09/05/2025Subgrade Inspections—special
09/05/2025Subsurface Conditions – Fill Placement & In-Place Density—special
08/25/2025Footing and Foundation—progress
08/25/2025Masonry—special
08/25/2025Structural Steel - Details—special
08/25/2025Final—progress
08/15/2025Sprinkler Systems—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SoltageIndustrial / WarehouseFloor 1
Project B01334723 Alteration · Approved · 02/05/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026B01276874-I1Request digital key ↗
08/20/2026B01276874-S1Request digital key ↗
08/18/2026B01279787-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISBPP-15 - Application for waiver of Builders pavement requirements1
03/06/2026340921809Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01279787-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026B01276874-S1Open ↗
08/20/2026B01276874-I1Open ↗
08/18/2026B01334723-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/06/2026340921809Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/18/2026B01279787-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01276874-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/06/2026340921809Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/18/2026B01279787-I1Open ↗