← Back
Predominantly retail with other uses
470 KINGS HIGHWAY
BROOKLYN · BIN 3178499
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R7AZoning
10,200 sfGross Floor Area
7Units
1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 470 KINGS HIGHWAY LLC · 7,950 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof5p · 2 filings · 20 docs
Floor 13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/28/2023$5.2M—Private party → 470 KINGS HIGHWAY LLC$507/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EJC ENGINEERING, PLLC307/25/2025
YAGUDAYEV ARCHITECTURE STUDIO P.C.103/14/2025
ASHRAF CORP206/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MA DESIGNS NYC203/21/2026
YAGUDAYEV ARCHITECTURE STUDIO P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALTHAIBANI CORPORATIONGeneral Contractor303/21/2026
KIEXSY CORPGeneral Contractor107/08/2026
PASHA USA CONSTRUCTION INGeneral Contractor104/09/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
HIGHLAND PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519407/25/2025
JAY KAVI CORPORATION8500104/23/2024
Building Lifecycle
All (83)Filed (6)Permit Issued (5)Violation (5)Inspection (9)Objection (28)Special Inspection (30)
01/14/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/18/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
08/18/2025
Special inspection requirement — Heating Systems
Younes Abouyaala
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/18/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
08/18/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Younes Abouyaala
08/18/2025
Special inspection requirement — Final
NAVEEN KUMAR
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
08/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/08/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
08/06/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/06/2025
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
08/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2025
Filed — Alteration
subsequent filing for mechanical work as per plans, installation of a Type 1 Hood and kitchen Exhaust, new air conditioning system with associated ductwork, installation of make up air system for commercial space
B01194318-P1
07/25/2025
Special inspection requirement — Final
NAVEEN KUMAR
07/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/25/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/25/2025
Special inspection requirement — Heating Systems
Younes Abouyaala
07/25/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/25/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Younes Abouyaala
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/28/2025
Permit issued — Mechanical Systems
B01194318-S1-MS
05/16/2025
Permit issued — Plumbing
B01194318-S2-PL
05/15/2025
Permit issued — General Construction
B01194318-I1-GC
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Cost
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Fire_Protection
05/02/2025
Objection raised — Energy
05/02/2025
Objection raised — Mechanical
05/02/2025
Objection raised — Plumbing
05/02/2025
Objection raised — Mechanical
05/02/2025
Objection raised — Mechanical
05/02/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
05/01/2025
Objection raised — Plumbing
05/01/2025
Objection raised — Plumbing
04/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2025
Filed — Alteration
subsequent filing for mechanical work as per plans, installation of a Type 1 Hood and kitchen Exhaust, new air conditioning system with associated ductwork, installation of make up air system for commercial space
B01194318-S1
04/24/2025
Filed — Alteration
subsequent filing for mechanical work as per plans, installation of a Type 1 Hood and kitchen Exhaust, new air conditioning system with associated ductwork, installation of make up air system for commercial space
B01194318-S2
04/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/22/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/15/2025
Objection resolved — Addressed
04/15/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedKIEXSY CORP05/28/2025
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC05/16/2025
DOB NOWGeneral ConstructionPermit IssuedPASHA USA CONSTRUCTION IN05/15/2025
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC06/12/2024
DOB NOWMechanical SystemsPermit IssuedALTHAIBANI CORPORATION04/29/2024
BISPLISSUEDA.I.S. PLUMBING & HTG INC10/07/2010
BISMHISSUEDCBS CONSTRUCTION INC09/07/2010
BISFPISSUEDIDEAL FIRE CONTROL INC10/11/2001
BISMHISSUEDJ. AND F. REFRIGERATION,*01/12/2001
BISOTISSUEDA INTERNATIONAL LTD08/03/1994
1 project · most recent 07/25/2025
FiledStatusContractorScope
07/25/2025——4 heads
1 project · most recent 07/25/2025
Water/Sanitary
FiledStatusContractorScope
07/25/2025Signed-offGREGG NY PLUMBING, INCWater/Sanitary
2 projects · most recent 06/16/2025
General Wiring
FiledStatusContractorScope
06/16/2025Permit IssuedKINGS ELECTRIC CO., INC.1 meters, 1 new_meters
02/14/2024CompleteDORION NORTON ELECL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/08/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
08/06/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/06/2025Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/18/2025Maintenance informationYounes Abouyaalaenergy_progress
08/18/2025Heating SystemsYounes Abouyaalaspecial
08/18/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/18/2025Mechanical SystemsYounes Abouyaalaspecial
08/18/2025Exhaust and Vent Systems in Plenums and DuctsYounes Abouyaalaspecial
08/18/2025FinalNAVEEN KUMARprogress
08/18/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/18/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/18/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/18/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/25/2025FinalNAVEEN KUMARprogress
07/25/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/25/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/25/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/25/2025Maintenance informationYounes Abouyaalaenergy_progress
07/25/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/25/2025Heating SystemsYounes Abouyaalaspecial
07/25/2025Mechanical SystemsYounes Abouyaalaspecial
07/25/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/25/2025Exhaust and Vent Systems in Plenums and DuctsYounes Abouyaalaspecial
04/22/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/22/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/22/2025Maintenance informationYounes Abouyaalaenergy_progress
04/18/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/26/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
Latest 25 of 30.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01035587-S1Request digital key ↗
08/25/2026B01035587-I1Request digital key ↗
08/21/2026B01194318-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
09/30/2026B01194318-P1Open ↗
09/30/2026B01194318-P1Open ↗
09/30/2026B01194318-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01194318-S1Open ↗
08/21/2026B01194318-S2Open ↗
08/21/2026B01194318-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/30/2026B01194318-P1Open ↗
08/25/2026B01194318-S1Open ↗
08/24/2026B01035587-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01194318-I1Open ↗
08/21/2026B01194318-S1Open ↗
08/21/2026B01194318-S2Open ↗
Showing 3 of 4 on file for this type