← Back
Two family frame
472 TENNYSON DRIVE
STATEN ISLAND · BIN 5174937
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3-1Zoning
2,404 sfGross Floor Area
2Units
Two family frame · 3,845 sf lot · 0.63 FAR built
Locations of Work
StructuralPlumbing
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEYER CONSTRUCTION407/08/2026
BELAIR RIDGE DEVELOPMENT CORP.1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
PATRICIA L GASS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor1507/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
LASER LITE ELECT'L INC.Electrical103/22/2026
DESIGN PLBG & HTG SVC INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738107/09/2021
Building Lifecycle
All (61)Filed (6)Permit Issued (11)Signed Off (5)Inspection (10)Special Inspection (29)
01/05/2023
Permit issued — Foundation
S00516741-I1-FO
01/05/2023
Permit issued — Structural
S00516741-I1-ST
01/05/2023
Permit issued — Foundation
S00516741-I1-MS
12/01/2022
Signed off — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR NEW TWO FAMILY RESIDENCE.
S00516741-S1
12/01/2022
Signed off — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR NEW TWO FAMILY RESIDENCE.
S00516741-S3
12/01/2022
Signed off — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR NEW TWO FAMILY RESIDENCE.
S00516741-S2
10/28/2022
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00591918-I1
09/29/2022
Signed off — Alteration
S00362603-I1
09/29/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/29/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/27/2022
Permit issued — Curb Cut
S00516741-S2-CC
09/19/2022
Permit issued — Curb Cut
S00516741-S3-CC
09/16/2022
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR NEW TWO FAMILY RESIDENCE.
S00516741-S3
09/16/2022
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR NEW TWO FAMILY RESIDENCE.
S00516741-S2
09/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/30/2022
Inspection — Pass-Final Scaffold Non-Directive 14
Pass
View inspection ↗
08/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
05/26/2022
Permit issued — Construction Fence
S00362603-I1-FN
05/26/2022
Permit issued — Foundation
S00516741-I1-GC
04/27/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/22/2022
Permit issued — Plumbing
S47406543-S1-PL
11/22/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/13/2021
Permit issued — Plumbing
S00516741-S1-PL
11/10/2021
Permit issued — Plumbing
S00591918-I1-PL
10/07/2021
Permit issued — Structural
S00516741-I1-GC
09/29/2021
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR NEW TWO FAMILY RESIDENCE.
S00516741-S1
09/28/2021
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00591918-I1
07/09/2021
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR NEW TWO FAMILY RESIDENCE.
S00516741-I1
05/13/2021
Special inspection requirement — Air barrier — testing
anthony santoro
05/13/2021
Special inspection requirement — Ventilation and air distribution system
anthony santoro
05/13/2021
Special inspection requirement — Air barrier - visual inspection
anthony santoro
05/11/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
05/11/2021
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
05/11/2021
Special inspection requirement — Structural Wood Frame
anthony santoro
05/11/2021
Special inspection requirement — Footing and Foundation
anthony santoro
05/05/2021
Special inspection requirement — Insulation placement and R values
anthony santoro
05/05/2021
Special inspection requirement — Permanent certificate
anthony santoro
05/05/2021
Special inspection requirement — Fenestration areas
anthony santoro
05/05/2021
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
05/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
05/05/2021
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
05/05/2021
Special inspection requirement — Interior lighting power
anthony santoro
05/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
05/05/2021
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
05/05/2021
Special inspection requirement — Maintenance information
anthony santoro
05/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
05/05/2021
Special inspection requirement — Metering
anthony santoro
05/05/2021
Special inspection requirement — Fenestration air leakage
anthony santoro
05/05/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
05/05/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/05/2021
Special inspection requirement — Mechanical Systems
anthony santoro
05/05/2021
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
05/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/05/2021
Special inspection requirement — Subgrade Inspections
anthony santoro
05/05/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/05/2021
Special inspection requirement — Final
anthony santoro
09/25/2020
Filed — Alteration
S00362603-I1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offBEYER CONSTRUCTION01/05/2023
DOB NOWStructuralSigned-offBEYER CONSTRUCTION01/05/2023
DOB NOWFoundationSigned-offBEYER CONSTRUCTION01/05/2023
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION09/27/2022
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION09/19/2022
DOB NOWConstruction FenceSigned-offBEYER CONSTRUCTION05/26/2022
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION05/26/2022
DOB NOWPlumbingSigned-offDESIGN PLBG & HTG SVC IN02/22/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.11/13/2021
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.11/10/2021
DOB NOWStructuralPermit IssuedBEYER CONSTRUCTION10/07/2021
1 project · most recent 09/16/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/16/2022Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 03/11/2022
General Wiring
FiledStatusContractorScope
03/11/2022CompleteLASER LITE ELECT'L INC.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/29/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2022Pass-Final Scaffold Non-Directive 14PassView ↗
08/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/27/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/22/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/13/2021Air barrier — testing anthony santoroenergy_progress
05/13/2021Ventilation and air distribution systemanthony santoroenergy_progress
05/13/2021Air barrier - visual inspectionanthony santoroenergy_progress
05/11/2021Energy Code Compliance Inspectionsanthony santoroprogress
05/11/2021Fire-Resistance Rated Constructionanthony santoroprogress
05/11/2021Structural Wood Frameanthony santoroprogress
05/11/2021Footing and Foundationanthony santoroprogress
05/05/2021Insulation placement and R valuesanthony santoroenergy_progress
05/05/2021Permanent certificateanthony santoroenergy_progress
05/05/2021Fenestration areasanthony santoroenergy_progress
05/05/2021Duct leakage testing, insulation and designanthony santoroenergy_progress
05/05/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
05/05/2021Protection of exposed foundation insulationanthony santoroenergy_progress
05/05/2021Interior lighting poweranthony santoroenergy_progress
05/05/2021HVAC-R and service water heating system controlsanthony santoroenergy_progress
05/05/2021Electric vehicle service equipment requirementsanthony santoroenergy_progress
05/05/2021Maintenance informationanthony santoroenergy_progress
05/05/2021HVAC-R and service water piping design and insulationanthony santoroenergy_progress
05/05/2021Meteringanthony santoroenergy_progress
05/05/2021Fenestration air leakageanthony santoroenergy_progress
05/05/2021Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
05/05/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/05/2021Mechanical Systemsanthony santorospecial
05/05/2021Concrete - Cast-In-Placeanthony santorospecial
05/05/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
Latest 25 of 29.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/25/2026S00591918-I1Request digital key ↗
08/24/2026S00516741-I1Request digital key ↗
08/24/2026S00516741-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00362603-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/08/2021540195340Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/08/2021540195340Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/08/2021540195340Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00516741-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00516741-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00516741-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/05/2026S00362603-I1Open ↗
08/24/2026S00516741-I1Open ↗
08/24/2026S00516741-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S00516741-I1Open ↗
08/24/2026S00516741-S3Open ↗
08/24/2026S00516741-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S00516741-I1Open ↗
08/24/2026S00516741-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/08/2021540195340Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/08/2021540195340Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00516741-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00516741-I1—
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00516741-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00516741-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00516741-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00516741-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00516741-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00516741-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00516741-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00516741-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/08/2021540195340Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
04/08/2021540195340Open ↗
▸BISNYS DEC COASTAL EROSION HAZARD APPROVAL1
04/08/2021540195340Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/08/2021540195340Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION2
06/28/2021540195340Open ↗
04/08/2021540195340Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
06/28/2021540195340Open ↗
06/28/2021540195340Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026S00516741-S1Open ↗
08/13/2026S00516741-I1Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
04/08/2021540195340Open ↗
▸BISNYS DEC COASTAL EROSION HAZARD MAP1
04/08/2021540195340Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00516741-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00516741-I1Open ↗
▸DOB NOWLowest Floor Elevation Plan1
08/24/2026S00516741-S1Open ↗