← Back
One family attached or semi-detached
473 CHRISTOPHER AVENUE
BROOKLYN · Brownsville · BIN 3085234
💬 Discuss this project
1985Year Built
2Stories
A5Building Class
R6Zoning
1,116 sfGross Floor Area
1Units
One family attached or semi-detached · 1,802 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUNRUN407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC211/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272211/12/2024
Building Lifecycle
All (13)Filed (2)Permit Issued (1)Special Inspection (10)
11/21/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/21/2024
Special inspection requirement — Final
Walid Abdulla
11/12/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01127738-P1
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/12/2024
Special inspection requirement — Final
Walid Abdulla
11/12/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/29/2024
Permit issued — Solar
B01127738-I1-SL
10/22/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01127738-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/29/2024
1 project · most recent 10/22/2024
FiledStatusContractorScope
10/22/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 11/12/2024
FiledStatusContractorScope
11/12/2024Signed-offSUNRUN INSTALLATION SVC14 panels, 5.74 kw, 147.9 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/21/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/21/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/21/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/21/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/21/2024FinalWalid Abdullaprogress
11/12/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/12/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/12/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/12/2024FinalWalid Abdullaprogress
11/12/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026B01127738-I1Request digital key ↗
08/23/2026B01127738-P1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01127738-I1Open ↗
09/02/2026B01127738-I1Open ↗
09/02/2026B01127738-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01127738-I1Open ↗
09/02/2026B01127738-I1Open ↗
08/24/2026B01127738-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026B01127738-I1Open ↗
08/13/2026B01127738-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026B01127738-I1Open ↗
08/13/2026B01127738-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01127738-I1Open ↗