← Back
Two stories - detached, small or mid-size
473 VAN DUZER STREET
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5013993
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,488 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,495 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneralOther
Filed — no permit issued9p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/28/2025
Building Lifecycle
All (7)Filed (1)Violation (1)Special Inspection (5)
10/28/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01308590-I1
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/24/2025
Special inspection requirement — Final
Walid Abdulla
10/24/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/03/2014
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 10/28/2025
FiledStatusContractorScope
10/28/2025Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 10/28/2025
FiledStatusContractorScope
10/28/2025——9 panels, 3.69 kw, 191 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/24/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/24/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/24/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/24/2025FinalWalid Abdullaprogress
10/24/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01308590-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01308590-I1Open ↗
08/25/2026S01308590-I1Open ↗
08/25/2026S01308590-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01308590-I1Open ↗
08/25/2026S01308590-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026S01308590-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026S01308590-I1Open ↗