← Back
Walk-up apt, over six families with stores
474 9 AVENUE
MANHATTAN · BIN 1013587
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C1-7AZoning
10,743 sfGross Floor Area
15Units
Rent Stabilized10 Open Violations 8 unresolved · 2 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 474 NINTH AVENUE REALTY HOLDINGS LLC · 2,480 sf lot · 4.33 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 7 docs
Floor 22p · 1 filing · 5 docs
Floor 1
Cellar2p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY309/13/2026
474 NINTH AVENUE REALTY HOLDINGS LLC903/22/2026
LATTE 474203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AR FIGUEROA ARCHITECT LLC207/16/2026
ALWAYS FAST SERVICES CORP105/29/2026
PRIME DESIGN GROUP LLC410/08/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor208/26/2026
SENAD MEHOVICElectrical103/21/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA INSPECTIONS3461107/16/2026
J & J ASSOCIATES NY INC3786310/08/2020
Building Lifecycle
All (90)Filed (7)Permit Issued (4)Signed Off (2)Violation (60)Objection (6)Special Inspection (11)
08/25/2026
Permit issued — Sidewalk Shed
M01408477-I1-SH
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/07/2026
Objection raised — Cost
08/07/2026
Objection raised — Other
07/16/2026
Filed — Alteration
REPAIR MULTIPLE CRACKS & SECTIONS OF MISSING FACADE PARGING AT EXISTING WEST (FRONT)AND SOUTH ELEVATIONS TO RESOLVE VIOLATIONS 39172164K & 39189756K.
M01428125-I1
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Adrian Figueroa
07/08/2026
Special inspection requirement — Final
Spencer Goroff
05/29/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01408477-I1
05/29/2026
Permit issued — Sidewalk Shed
M01408477-I1-SH
05/22/2026
Violation issued (ECB, open)
Construction
05/22/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2026
Violation issued (ECB, open)
Construction
10/01/2025
Violation issued (FDNY_ORDER, closed)
10/01/2025
Violation issued (FDNY_ORDER, closed)
07/28/2025
Signed off — Alteration
M00840231-I1
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
04/04/2023
Permit issued — General Construction
M00840231-I1-GC
03/15/2023
Violation issued (HPD, closed)
A
03/09/2023
Filed — Alteration
M00840231-I1
03/07/2023
Special inspection requirement — Final
Spencer Goroff
12/08/2022
Violation issued (HPD, closed)
B
12/08/2022
Violation issued (HPD, open)
A
12/08/2022
Violation issued (HPD, closed)
C
12/08/2022
Violation issued (HPD, closed)
B
12/08/2022
Violation issued (HPD, closed)
C
09/09/2022
Violation issued (HPD, open)
A
09/09/2022
Violation issued (HPD, open)
A
09/09/2022
Violation issued (HPD, closed)
B
09/09/2022
Violation issued (HPD, closed)
B
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
07/28/2021
Signed off — Alteration
APPLICATION FILED FOR REPLACEMENT OF (2) TOILET FIXTURES & INSTALLATION OF (9) NEW FIXTURES. ALL PER ATTACHED PLANS.
M00286717-I1
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/14/2021
Violation issued (ECB, closed)
Construction
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2020
Violation issued (ECB, closed)
Construction
10/08/2020
Filed — Alteration
APPLICATION FILED FOR REPLACEMENT OF (2) TOILET FIXTURES & INSTALLATION OF (9) NEW FIXTURES. ALL PER ATTACHED PLANS.
M00286717-P2
09/29/2020
Violation issued (ECB, closed)
Construction
09/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY GUPTA
09/27/2020
Special inspection requirement — Energy Code Compliance Inspections
CARLTON PRIME
09/27/2020
Special inspection requirement — HVAC insulation and sealing
CARLTON PRIME
06/22/2020
Filed — Alteration
APPLICATION FILED FOR APPROVAL OF NEW RANGEHOOD, ROOFTOP EXHAUST, MAKEUP AIR VENTILATOR & ASSOCIATED DUCTWORK.
M00341327-I1
06/22/2020
Objection raised — Inconsistency
06/22/2020
Objection resolved — Addressed
06/22/2020
Special inspection requirement — Maintenance information
CARLTON PRIME
06/22/2020
Special inspection requirement — Permanent certificate
CARLTON PRIME
05/07/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/10/2020
Special inspection requirement — Final
04/10/2020
Special inspection requirement — Mechanical Systems
03/23/2020
Filed — Alteration
APPLICATION FILED FOR REPLACEMENT OF (2) TOILET FIXTURES & INSTALLATION OF (9) NEW FIXTURES. ALL PER ATTACHED PLANS.
M00286717-P1
02/25/2020
Permit issued — Plumbing
M00286717-I1-PL
01/22/2020
Filed — Alteration
APPLICATION FILED FOR REPLACEMENT OF (2) TOILET FIXTURES & INSTALLATION OF (9) NEW FIXTURES. ALL PER ATTACHED PLANS.
M00286717-I1
11/15/2019
Violation issued (HPD, closed)
C
11/15/2019
Violation issued (HPD, closed)
C
10/05/2018
Violation issued (HPD, closed)
I
03/25/2018
Violation issued (HPD, closed)
A
03/25/2018
Violation issued (HPD, closed)
B
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC08/25/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC05/29/2026
DOB NOWGeneral ConstructionSigned-offPR04/04/2023
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP02/25/2020
BISOTISSUEDEAST ENDERS NYC INC01/21/2020
BISBLISSUEDWASOFF PLBG & UTILITY CO02/28/2003
BISPLISSUEDWASOFF PLBG & UTILITY CO02/28/2003
BISOTISSUEDCITY SIGN & AWNING INC/TOWER SIG01/23/2001
1 project · most recent 06/22/2020
Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2020——Others, Ventilation Systems
Ventilation
Captiveaire DMUA18FA 1,075 CFM · Makeup Air ×1
Other
Captiveaire NCA14FA 1,900 CFM · Kitchen Exhaust ×1
3 projects · most recent 05/29/2026
General Wiring
FiledStatusContractorScope
05/29/2026Permit IssuedRICHARD NEU—
05/03/2022CompleteE & M ELECTRICAL NY CORPGeneral Wiring
10/11/2019CancelledSPECTRUM ELECTRIC, LLCGeneral Wiring
1 project · most recent 05/29/2026
Sidewalk Shed
FiledStatusContractorScope
05/29/2026Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/08/2026Tenant Protection Plan ComplianceAdrian Figueroaspecial
07/08/2026FinalSpencer Goroffprogress
03/07/2023FinalSpencer Goroffprogress
09/27/2020Fire-Resistant Penetrations and JointsVIJAY GUPTAspecial
09/27/2020Energy Code Compliance InspectionsCARLTON PRIMEprogress
09/27/2020HVAC insulation and sealing CARLTON PRIMEenergy_progress
06/22/2020Maintenance informationCARLTON PRIMEenergy_progress
06/22/2020Permanent certificateCARLTON PRIMEenergy_progress
05/07/2020Fire-Resistant Penetrations and Joints—special
04/10/2020Final—progress
04/10/2020Mechanical Systems—special
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch3
08/31/2026M00840231-I1Request digital key ↗
08/17/2026M01408477-I1Request digital key ↗
08/15/2026M01428125-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00286717-I1Request digital key ↗
08/15/2026M00286717-P2Request digital key ↗
08/15/2026M00286717-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00341327-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
11/18/2020123845919Open ↗
11/26/2019123845919Open ↗
▸BISWORK PERMIT APPLICATION1
01/21/2020123845919Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/05/2026M00286717-I1Open ↗
09/05/2026M00286717-P2Open ↗
09/05/2026M00286717-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00286717-P2Open ↗
09/01/2026M00286717-P2Open ↗
08/28/2026M01428125-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/16/2019123845919Open ↗
11/26/2019123845919Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00286717-P2Open ↗
08/28/2026M01428125-I1Open ↗
▸Safety & Tenant Protection13
▸DOB NOWHPD-1: Anti-Harassment Area Checklist7
08/17/2026M01408477-I1Open ↗
08/15/2026M01428125-I1Open ↗
08/14/2026M00341327-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
08/14/2026M00341327-I1Open ↗
08/13/2026M00286717-P2Open ↗
08/13/2026M00286717-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
11/26/2019123845919Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
12/13/2019123845919Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00286717-P2Open ↗
09/05/2026M00286717-P1Open ↗
09/05/2026M00286717-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/26/2019123845919Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/24/2021123845919Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/24/2021123845919Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/26/2019123845919Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/24/2021123845919Open ↗
05/24/2021123845919Open ↗
05/24/2021123845919Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/24/2021123845919Open ↗
▸BISFINAL1
05/24/2021123845919Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/26/2019123845919Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/24/2021123845919Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
12/08/2020123845919Open ↗
▸BISEFILING COVER SHEET1
11/26/2019123845919Open ↗