← Back
BuildNYC
Single or multiple dwelling with stores or offices
474 CONEY ISLAND AVENUE
BROOKLYN · Kensington · BIN 3337124
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
C8-2Zoning
7,138 sfGross Floor Area
6Units
0 Active Violations 2 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: Church & Coney · 3,528 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Basic Groups4p · 3 filings · 18 docs
CellarBasic Groups4p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ceka807/08/2026
Church & Coney603/22/2026
AA 476 Coney Island103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Basic Groups304/26/2021
Jian Engineering110/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ryan Design Architecture103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jay Helfgott ElectricElectrical203/21/2026
Ness Mechanical P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY Acom Engineering7061304/26/2021
Building Lifecycle
All (29)Filed (4)Permit Issued (1)Violation (16)Special Inspection (8)
12/15/2025
Violation issued (FDNY_ORDER, closed)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2021
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
04/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
04/27/2021
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
04/27/2021
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
04/26/2021
Filed — Alteration
FILE PLUMBING APPLICATION TO INSTALL (1) NEW FIRE SUPPRESSION SHUT-OFF VALVE ON 1ST FLOOR IN CONJUNCTION WITH JOB#B00407408. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00438474-P2
04/08/2021
Violation issued (FDNY_NOV, closed)
04/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
04/07/2021
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
04/07/2021
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
04/07/2021
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
01/26/2021
Permit issued — Plumbing
B00438474-I1-PL
12/15/2020
Filed — Alteration
B00438500-I1
12/15/2020
Filed — Alteration
FILE PLUMBING APPLICATION TO INSTALL (1) NEW FIRE SUPPRESSION SHUT-OFF VALVE ON 1ST FLOOR IN CONJUNCTION WITH JOB#B00407408. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00438474-I1
10/15/2020
Filed — Alteration
B00407408-I1
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/06/2017
Violation issued (ECB, closed)
Construction
07/22/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2008
Violation issued (ECB, closed)
Construction
07/06/2006
Violation issued (ECB, closed)
Site Safety
06/16/2005
Violation issued (ECB, closed)
Construction
04/30/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
04/30/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
04/03/1995
Violation issued (FDNY_NOV, closed)
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNess Mechanical P & H01/26/2021
BISOTISSUEDSteel Tone Construction04/09/2018
BISOTISSUEDSteel Tone Construction02/15/2018
BISPLISSUEDTop Plumbing Group02/15/2018
BISOTISSUEDDesign N Safety01/31/2018
BISOTISSUEDB.H. Contractor02/11/2015
BISEQISSUEDBest Yalana Construction & Rest Co10/28/2008
BISEQISSUEDMSS Construction10/09/2008
BISOTISSUEDY Levy Contracting08/31/2006
BISEQISSUEDY Levy Contracting08/31/2006
BISEQISSUEDY Levy Contracting11/01/2005
BISOTISSUEDY Levy Contracting11/01/2005
BISOTISSUEDSLB Contrng09/14/2005
BIS—ISSUEDSLB Contrng09/07/2005
BISFPISSUEDIdeal Fire Control04/30/2003
2 projects · most recent 04/26/2021
Gas Water/Sanitary
FiledStatusContractorScope
04/26/2021Signed-offMelonik Plumbing & HeatingGas
10/15/2020——Gas, Water/Sanitary
3 projects · most recent 03/09/2021
General Wiring
FiledStatusContractorScope
03/09/2021Permit IssuedLive Wire Electric 11 meters, 1 new_meters
02/28/2018Permit IssuedKings Electric CoGeneral Wiring
02/28/2018Permit IssuedKings Electric Co4 meters, 4 new_meters
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/27/2021HVAC and service water heating system controls YING JIANGenergy_progress
04/27/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
04/27/2021Energy Code Compliance InspectionsYING JIANGprogress
04/27/2021HVAC and service water heating equipment YING JIANGenergy_progress
04/07/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
04/07/2021Energy Code Compliance InspectionsYING JIANGprogress
04/07/2021HVAC and service water heating system controls YING JIANGenergy_progress
04/07/2021HVAC and service water heating equipment YING JIANGenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Basic GroupsUnknownCellar, Floor 1
Project B00438474 Alteration · Permit Entire · 12/15/2020
Project B00438500 Alteration · Approved · 12/15/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00438474-I1Request digital key ↗
08/15/2026B00438474-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00438500-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/02/2026B00407408-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION8
02/16/2018321717914Open ↗
02/16/2018321717914Open ↗
02/16/2018321717914Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
11/05/2018321717914Open ↗
07/12/2018321717914Open ↗
01/17/2018321717914Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/05/2018321717914Open ↗
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/15/2019321717914Open ↗
05/15/2019321717914Open ↗
02/01/2018321717914Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00438474-P2Open ↗
09/01/2026B00438474-P2Open ↗
09/01/2026B00438474-P2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/17/2018321717914Open ↗
01/17/2018321717914Open ↗
10/28/2008310217618Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026B00407408-I1Open ↗
09/02/2026B00438474-P2Open ↗
09/02/2026B00438474-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/28/2008310217618Open ↗
10/09/2008310209379Open ↗
09/25/2008310201796Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00438474-P2Open ↗
08/23/2026B00438474-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/09/2015340221879Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/09/2015340221879Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/09/2015340221879Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/05/2018321717914Open ↗
01/17/2018321717914Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
02/09/2015340221879Open ↗
10/28/2008310217618Open ↗
09/25/2008310201796Open ↗
▸BISTenant Protection Plan and Notes1
01/17/2018321717914Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
10/28/2008310217618Open ↗
10/09/2008310209379Open ↗
09/25/2008310201796Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/17/2018321717914Open ↗
02/09/2015340221879Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/15/2019321717914Open ↗
01/17/2018321717914Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/15/2019321717914Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
10/28/2008310217618Open ↗
10/09/2008310209379Open ↗
09/25/2008310201796Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/15/2019321717914Open ↗
08/09/2016340221879Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
05/15/2019321717914Open ↗
11/05/2018321717914Open ↗
01/17/2018321717914Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
02/01/2018321717914Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
04/26/2019321717914Open ↗
11/05/2018321717914Open ↗
08/16/2018321717914Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
01/19/2018321717914Open ↗
10/28/2008310217618Open ↗
10/09/2008310209379Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
05/15/2019321717914Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/09/2015340221879Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/16/2018321717914Open ↗