Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof22p · 1 filing · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 417p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMTA312/11/2025
DE NARDIS ENGINEERING, LLC212/11/2025
MHG ARCHITECTS PC112/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
Building Lifecycle
All (43)Filed (6)Objection (7)Special Inspection (30)
07/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
THOMAS THOMANN
06/25/2026
Special inspection requirement — Vestibules
06/18/2026
Objection resolved — Addressed
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
06/17/2026
Special inspection requirement — Maintenance information
01/13/2026
Objection raised — Other
01/06/2026
Objection raised — Other
01/06/2026
Objection raised — Other
12/31/2025
Objection raised — Other
12/31/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/11/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299947-S1
12/11/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299947-S2
12/11/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299947-S3
12/11/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299947-S5
12/10/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299947-S4
12/10/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299947-I1
11/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
11/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/31/2025
Special inspection requirement — Insulation placement and R values
10/28/2025
Special inspection requirement — Structural Steel - Welding
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/28/2025
Special inspection requirement — Post-installed Anchors
10/28/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/28/2025
Special inspection requirement — Concrete - Cast-In-Place
10/28/2025
Special inspection requirement — Concrete - Precast
10/28/2025
Special inspection requirement — Concrete – Prestressed
10/28/2025
Special inspection requirement — Masonry
10/28/2025
Special inspection requirement — Post-installed Anchors
10/28/2025
Special inspection requirement — Structural Steel - Details
10/28/2025
Special inspection requirement — Structural Steel - High Strength Bolting
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/28/2025
Special inspection requirement — Sprayed fire-resistant materials
10/28/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
10/28/2025
Special inspection requirement — Air barrier - visual inspection
10/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/28/2025
Special inspection requirement — Fenestration air leakage
10/28/2025
Special inspection requirement — Protection of exposed foundation insulation
10/28/2025
Special inspection requirement — Air barrier — testing
10/28/2025
Special inspection requirement — Air barrier continuity plan testing
10/28/2025
Special inspection requirement — Fenestration areas
Nothing on file for this building.
1 project · most recent 12/11/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/11/2025——Heating and Air Conditioning Systems
Heat / Cool
Daikin SSSSSSS 48,000 BTU · Erv ×3
1 project · most recent 12/11/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/11/2025——Storm, Water/Sanitary
1 project · most recent 12/11/2025
Steel Concrete Masonry
FiledStatusContractorScope
12/11/2025——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
07/23/2026Subsurface Investigations (Borings/Test Pits)THOMAS THOMANNspecial
06/25/2026Vestibules—energy_progress
06/17/2026Energy Code Compliance Inspections—progress
06/17/2026Maintenance information—energy_progress
11/18/2025HVAC-R and service water heating system controls—energy_progress
11/18/2025HVAC-R and service water piping design and insulation—energy_progress
11/18/2025HVAC-R and service water heating equipment—energy_progress
10/31/2025Insulation placement and R values—energy_progress
10/28/2025Structural Steel - Welding—special
10/28/2025Fire-Resistant Penetrations and Joints—special
10/28/2025Post-installed Anchors—special
10/28/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
10/28/2025Fire-Resistant Penetrations and Joints—special
10/28/2025Concrete - Cast-In-Place—special
10/28/2025Concrete - Precast—special
10/28/2025Concrete – Prestressed—special
10/28/2025Masonry—special
10/28/2025Post-installed Anchors—special
10/28/2025Structural Steel - Details—special
10/28/2025Structural Steel - High Strength Bolting—special
10/28/2025Fire-Resistant Penetrations and Joints—special
10/28/2025Sprayed fire-resistant materials—special
10/28/2025Wall Panels, Curtain Walls, and Veneers—special
10/28/2025Air barrier - visual inspection—energy_progress
10/28/2025Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 42.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026B01299947-S3Request digital key ↗
08/19/2026B01299947-I1Request digital key ↗
08/19/2026B01299947-S5Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026B01299947-I1Open ↗
08/13/2026B01299947-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 21
08/19/2026B01299947-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/19/2026B01299947-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01299947-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026B01299947-S5Open ↗
08/19/2026B01299947-S4Open ↗
08/19/2026B01299947-S3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/19/2026B01299947-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/19/2026B01299947-S1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/19/2026B01299947-S5Open ↗
08/19/2026B01299947-S3Open ↗
08/19/2026B01299947-S2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWSite Survey: Initial2
08/19/2026B01299947-I1Open ↗
08/13/2026B01299947-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1