← Back
Two family frame
474 TENNYSON DRIVE
STATEN ISLAND · Great Kills-Eltingville · BIN 5174939
💬 Discuss this project
0Year Built
2Stories
B2Building Class
R3-1Zoning
2,314 sfGross Floor Area
2Units
Two family frame · 3,833 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR RIDGE DEV. CORP1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT107/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor803/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738107/09/2021
Building Lifecycle
All (20)Filed (1)Permit Issued (4)Inspection (2)Objection (2)Special Inspection (11)
01/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/28/2022
Permit issued — Structural
S00518480-I1-ST
10/28/2022
Permit issued — Foundation
S00518480-I1-FO
05/26/2022
Permit issued — Structural
S00518480-I1-GC
10/04/2021
Permit issued — General Construction
S00518480-I1-GC
08/17/2021
Objection raised — Scope
08/17/2021
Objection resolved — Addressed
07/09/2021
Filed — New Building
PROPOSED ACCESSORY DETACHED ONE CAR GARAGE.
S00518480-I1
05/13/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/07/2021
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
05/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/07/2021
Special inspection requirement — Subgrade Inspections
anthony santoro
05/07/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/07/2021
Special inspection requirement — Final
anthony santoro
05/07/2021
Special inspection requirement — Footing and Foundation
anthony santoro
05/07/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
05/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
05/07/2021
Special inspection requirement — Structural Wood Frame
anthony santoro
05/07/2021
Special inspection requirement — Interior lighting power
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedBEYER CONSTRUCTION10/28/2022
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION10/28/2022
DOB NOWStructuralPermit IssuedBEYER CONSTRUCTION05/26/2022
DOB NOWGeneral ConstructionPermit IssuedBEYER CONSTRUCTION10/04/2021
1 project · most recent 07/09/2021
Concrete Wood
FiledStatusContractorScope
07/09/2021Permit IssuedBEYER CONSTRUCTION CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/13/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/07/2021Concrete - Cast-In-Placeanthony santorospecial
05/07/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
05/07/2021Subgrade Inspectionsanthony santorospecial
05/07/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/07/2021Finalanthony santoroprogress
05/07/2021Footing and Foundationanthony santoroprogress
05/07/2021Energy Code Compliance Inspectionsanthony santoroprogress
05/07/2021Fire-Resistance Rated Constructionanthony santoroprogress
05/07/2021Structural Wood Frameanthony santoroprogress
05/07/2021Interior lighting poweranthony santoroenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026S00518480-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00518480-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00518480-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00518480-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S00518480-I1Open ↗
08/27/2026S00518480-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S00518480-I1Open ↗
08/27/2026S00518480-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026S00518480-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00518480-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00518480-I1—
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00518480-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00518480-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00518480-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00518480-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00518480-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00518480-I1Open ↗
▸Other Documents3
▸DOB NOWFinal Survey1
08/13/2026S00518480-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00518480-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S00518480-I1Open ↗