Elevator co-op, conversion from loft/warehouse
474 WEST BROADWAY
MANHATTAN · BIN 1008028
💬 Discuss this project
1880Year Built
5Stories
D0Building Class
R7-2Zoning
51,925 sfGross Floor Area
20Units
LL97 CoveredRent Stabilized14 Open Violations ▸FDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: SHUTTLEWORTH ARTISTS LTD · 10,561 sf lot · 4.92 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 2 filings · 15 docs
Floor 513p · 1 filing · 20 docs
Floor 412p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 214p · 2 filings · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRAT ENTERPRISES2208/12/2026
150 THOMPSON STREET LLC703/22/2026
PLATINUM SERVICES NY703/22/2026
THE ANDREWS ORGANIZATION103/22/2026
OWNER OF 146 THOMPSON ST103/22/2026
ANDREWS BUILDING103/22/2026
LEMBERG FOUNDATION703/21/2026
PHOENIX 132 SUTTON STREET603/21/2026
SHUTTLEWORTH ARTIST LTD C O ANDR603/21/2026
RUTHA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DEMAR PLUMBING1203/21/2026
SUSKA603/21/2026
Rigid Structural Design, LLC1403/21/2026
STONE ENGINEERING & ARCHITECTURE DP603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
BARNWELL CONSULTANTS203/21/2026
GREEN STUDIO203/21/2026
JP EXPEDITE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRAT ENTERPRISES CORPGeneral Contractor808/12/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
ARISTON CHIMNEY LLCGeneral Contractor303/21/2026
DEMAR MECHANICAL INCPlumbing307/08/2026
LUMITECH CONTRACTING CORPGeneral Contractor307/08/2026
CHAMP PLUMBING & HTG CORPPlumbing207/08/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
CAD SIGNS NYCScaffold107/08/2026
LACLAIR, KEVINElectrical103/21/2026
N Y WATER MAIN & SEWER SEElectrical103/21/2026
KHAIT, SElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEAN MENDEZ ARCHITECT, P.8621104/29/2025
METRIC CONSULTING AND INS1803104/29/2025
REVANS DESIGN PE PC4617903/18/2024
NEW AGE ENGINEERING PLLC7746209/01/2023
TOHFAZ UDDIN P.E.2001111/29/2022
STRUCTURAL CONSULTING SER1919103/18/2022
STONE ENGINEERING & ARCHI1362105/04/2021
Building Lifecycle
All (159)Filed (27)Permit Issued (20)Signed Off (8)Violation (60)Inspection (12)Objection (2)Special Inspection (30)
08/11/2026
Permit issued — Sidewalk Shed
M01268260-I1-SH
08/11/2026
Permit issued — Supported Scaffold
M01268264-I1-SF
08/11/2026
Permit issued — Protection and Mechanical Methods
M01268267-I1-PMM
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/18/2025
Permit issued — General Construction
M01205987-I1-GC
12/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
12/01/2025
Special inspection requirement — Final
Evan Petkanas
12/01/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
11/26/2025
Filed — Alteration
Roof replacement as per plans. No change in use, egress, or occupancy.
M01205987-P1
11/25/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01268264-P1
11/25/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01268260-P2
10/03/2025
Permit issued — Protection and Mechanical Methods
M01283807-I1-PMM
10/02/2025
Filed — Alteration
Installation of a temporary shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01283807-I1
09/22/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01268260-P1
08/20/2025
Permit issued — Protection and Mechanical Methods
M01268267-I1-PMM
08/20/2025
Permit issued — Sidewalk Shed
M01268260-I1-SH
08/19/2025
Filed — Alteration
M01268267-I1
08/19/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01268260-I1
08/19/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01268264-I1
08/19/2025
Permit issued — Supported Scaffold
M01268264-I1-SF
04/29/2025
Filed — Alteration
Roof replacement as per plans. No change in use, egress, or occupancy.
M01205987-I1
12/17/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2024
Signed off — Alteration
New deck to replace existing as per plans filed herewith. No change in use, egress or occupancy.
M00662371-I1
10/10/2024
Signed off — Alteration
New replacement deck in 2nd Floor courtyard within existing apartment. No change of use egress or occupancy.
M00662085-I1
05/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/04/2024
Signed off — Alteration
REPLACE LOW PRESSURE BOILER AND GAS BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00921869-S1
03/26/2024
Signed off — Alteration
REPLACE LOW PRESSURE BOILER AND GAS BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00921869-I1
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
03/18/2024
Filed — Alteration
REPLACE EXISTING LOW PRESSURE GAS PIPING FROM METERS IN CELLAR TO RESIDENTIAL UNITS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUCPANCY.
M00791174-P6
03/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
02/16/2024
Permit issued — General Construction
M00662085-I1-GC
02/06/2024
Permit issued — Structural
M00662371-I1-ST
09/27/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M08041384-I1
09/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
09/12/2023
Filed — Alteration
REPLACE EXISTING LOW PRESSURE GAS PIPING FROM METERS IN CELLAR TO RESIDENTIAL UNITS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUCPANCY.
M00791174-P5
09/08/2023
Permit issued — Plumbing
M00921869-S1-PL
09/08/2023
Permit issued — Boiler Equipment
M00921869-I1-BE
09/01/2023
Filed — Alteration
REPLACE LOW PRESSURE BOILER AND GAS BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00921869-S1
09/01/2023
Filed — Alteration
REPLACE LOW PRESSURE BOILER AND GAS BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00921869-I1
09/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
08/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
08/31/2023
Special inspection requirement — Maintenance information
Stephen Shishko
08/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
08/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
08/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
08/31/2023
Special inspection requirement — Maintenance information
Stephen Shishko
08/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
08/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
04/05/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/24/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/20/2023
Filed — Alteration
REPLACE EXISTING LOW PRESSURE GAS PIPING FROM METERS IN CELLAR TO RESIDENTIAL UNITS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUCPANCY.
M00791174-P4
03/14/2023
Signed off — Alteration
M00772208-I1
02/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
12/22/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/30/2022
Permit issued — Supported Scaffold
M08041384-I1-SF
11/29/2022
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M08041384-I1
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPRAT ENTERPRISES CORP08/11/2026
DOB NOWSupported ScaffoldPermit IssuedPRAT ENTERPRISES CORP08/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP08/11/2026
DOB NOWGeneral ConstructionPermit IssuedPRAT ENTERPRISES CORP12/18/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP10/03/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP08/20/2025
DOB NOWSidewalk ShedPermit IssuedPRAT ENTERPRISES CORP08/20/2025
DOB NOWSupported ScaffoldPermit IssuedPRAT ENTERPRISES CORP08/19/2025
DOB NOWGeneral ConstructionSigned-offLUMITECH CONTRACTING CORP02/16/2024
DOB NOWStructuralSigned-offLUMITECH CONTRACTING CORP02/06/2024
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP09/08/2023
DOB NOWBoiler EquipmentSigned-offCHAMP PLUMBING & HTG CORP09/08/2023
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP11/30/2022
DOB NOWPlumbingPermit IssuedDEMAR MECHANICAL INC10/24/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC09/28/2022
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC09/24/2022
DOB NOWGeneral ConstructionSigned-offARISTON CHIMNEY LLC09/14/2022
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/24/2021
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/24/2021
DOB NOWSignSigned-offSIGNS CAD CORP05/01/2019
BISOTISSUEDPRO-ONE CONTRACTING CORP06/17/2019
BISEQISSUEDPRO-ONE CONTRACTING CORP06/17/2019
BISOTISSUEDRELIABLE GENERAL CONTRACT03/07/2019
BISOTISSUEDPRO-ONE CONTRACTING CORP02/13/2018
BISPLISSUEDARCON PLBG SOLUTIONS10/12/2017
BISOTISSUEDBREUCKELEN BUILD INC09/13/2017
BISEQISSUEDPRO-ONE CONTRACTING CORP08/10/2017
BISOTISSUEDPRO-ONE CONTRACTING CORP03/03/2017
BISSPISSUEDALLSTATE SPRINKLER LLC08/23/2016
BISOTISSUEDPRO-ONE CONTRACTING CORP07/22/2016
BISOTISSUEDOMARA ORGANIZATION INC03/02/2016
BISPLISSUEDDEANGELIS PLBG & HTG.INC02/24/2016
BISOTISSUEDOMARA ORGANIZATION INC02/22/2016
BISSPISSUEDVIP FIRE SPRINKLER INC04/06/2015
BISOTISSUEDALWAYS DEPENDABLE CORP07/10/2014
BISOTISSUEDJEPOL CONSTRUCTION INC02/19/2014
BISPLISSUEDTIME MECHANICALS INC.01/12/2012
BISOTISSUEDWATTERS CONSTRUCTION INC11/16/2011
BISPLISSUEDR.J.C. MECHANICAL CORP09/08/2011
BISOTISSUEDWATTERS CONSTRUCTION INC08/11/2011
+ 30 more permits on file
1 project · most recent 03/18/2024
Gas
FiledStatusContractorScope
03/18/2024Permit IssuedDEMAR MECHANICAL INCGas
5 projects · most recent 10/28/2025
General Wiring
FiledStatusContractorScope
10/28/2025Permit IssuedAURORA ELECL CONTG INC—
04/19/2024CompleteSCHWARTZ ELEC. CONTR'S IN—
01/23/2024Permit IssuedAMC ELEC'L SERVICES, INC.—
05/04/2022Permit IssuedSCHWARTZ ELEC. CONTR'S INGeneral Wiring
03/10/2021Permit IssuedILLUMINOUS ELECTRIC CORP.—
3 projects · most recent 11/25/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
11/25/2025Permit IssuedPRAT ENTERPRISES CORPSidewalk Shed
11/25/2025Permit IssuedPRAT ENTERPRISES CORPScaffold
03/23/2021Permit IssuedPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/05/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/24/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/22/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/03/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
12/01/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
12/01/2025FinalEvan Petkanasprogress
12/01/2025MasonrySAMI HAJJAR P.Especial
12/01/2025Tenant Protection Plan ComplianceDean Mendezspecial
03/19/2024Fire-Resistant Penetrations and JointsPAUL REVANSspecial
03/12/2024Fire-Resistant Penetrations and JointsPAUL REVANSspecial
09/13/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
09/01/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
08/31/2023HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
08/31/2023Maintenance informationStephen Shishkoenergy_progress
08/31/2023HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
08/31/2023HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
08/31/2023HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
08/31/2023Maintenance informationStephen Shishkoenergy_progress
08/18/2023Tenant Protection Plan ComplianceStephen Shishkospecial
08/18/2023Tenant Protection Plan ComplianceStephen Shishkospecial
02/22/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
11/16/2022Post-installed AnchorsMD TOHFAZ UDDINspecial
10/11/2022HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
10/11/2022HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
10/11/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
10/11/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsPAUL REVANSspecial
10/11/2022Maintenance informationPAUL REVANSenergy_progress
10/11/2022HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
10/06/2022HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
Latest 25 of 36.
▾Documents — 412 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch26
09/04/2026M00483696-I1Request digital key ↗
09/02/2026M00662085-I1Request digital key ↗
09/02/2026M00662371-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00152933-I1Request digital key ↗
09/05/2026M00152939-I1Request digital key ↗
▸Applications & Permits87
▸BISWORK PERMIT APPLICATION46
06/18/2019122676906Open ↗
06/17/2019140666161Open ↗
05/13/2019123473035Open ↗
Showing 3 of 46 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION36
02/15/2019123473035Open ↗
08/07/2017123303647Open ↗
07/11/2017140666161Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWLPC Approval/Permit5
09/02/2026M00662085-I1Open ↗
08/24/2026M01205987-I1Open ↗
08/13/2026M00662371-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications118
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
07/09/2019123473035Open ↗
07/09/2019123473035Open ↗
02/12/2018123303647Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/04/2026M00483696-I1Open ↗
09/02/2026M00662085-I1Open ↗
09/01/2026M08041384-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M00921869-I1Open ↗
09/23/2026M00791174-I1Open ↗
09/01/2026M00791174-P4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026M00791174-I1Open ↗
09/23/2026M00921869-I1Open ↗
09/23/2026M00921869-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
02/15/2019123473035Open ↗
07/21/2016122676906Open ↗
03/11/2011120627321Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
03/11/2011120627321Open ↗
03/01/2011120620382Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/15/2019123473035Open ↗
02/15/2019123473035Open ↗
07/11/2017140666161Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/11/2017140666161Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/11/2017140666161Open ↗
▸Trade Schedules & Equipment35
▸BISSCHEDULE B - PLUMBING11
10/24/2011120614031Open ↗
10/24/2011120614031Open ↗
10/19/2011120614031Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
07/16/2015120529044Open ↗
07/06/2015120529044Open ↗
06/09/2015120529044Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS5
05/28/2015110477378Open ↗
05/28/2015110477378Open ↗
05/28/2015110477378Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
08/07/2017123303647Open ↗
03/02/2015122281280Open ↗
03/02/2015122281280Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
06/01/2015110477378Open ↗
06/01/2015110477378Open ↗
05/28/2015110477378Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
08/07/2017123303647Open ↗
07/21/2016122676906Open ↗
07/11/2017140666161Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/28/2015110477378Open ↗
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/02/2026M00662085-I1Open ↗
08/13/2026M00791174-P4Open ↗
08/13/2026M00791174-P5Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
03/01/2011120620382Open ↗
02/16/2011120614031Open ↗
Showing 2 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
02/15/2019123473035Open ↗
08/29/2017123303647Open ↗
08/21/2017123303647Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
03/11/2011120627321Open ↗
Showing 1 of 3 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
07/09/2019123473035Open ↗
07/09/2019123473035Open ↗
02/12/2018123303647Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/09/2019123473035Open ↗
02/12/2018123303647Open ↗
09/20/2017121997198Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/11/2017140666161Open ↗
▸Approvals, Objections & Sign-offs39
▸BISADMINISTRATIVE OBJECTIONS12
07/21/2016122676906Open ↗
03/14/2013121548165Open ↗
03/11/2011120627321Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS APPROVAL11
02/15/2019123473035Open ↗
02/12/2018123303647Open ↗
09/20/2017121997198Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
07/09/2019123473035Open ↗
02/12/2018123303647Open ↗
09/20/2017121997198Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/20/2017121997198Open ↗
03/09/2016122281280Open ↗
11/20/2013120459182Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
04/23/2013120424889Open ↗
▸BISSUPERSEDING LETTER1
02/24/2016121997198Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M01205987-I1Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
07/09/2019123473035Open ↗
02/15/2019123473035Open ↗
02/12/2018123303647Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET19
02/15/2019123473035Open ↗
08/07/2017123303647Open ↗
07/21/2016122676906Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION5
07/06/2016121997198Open ↗
10/19/2011120614031Open ↗
10/19/2011120614031Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
07/09/2019123473035Open ↗
02/12/2018123303647Open ↗
09/20/2017121997198Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/11/2017140666161Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/15/2017123303647Open ↗
03/11/2011120627321Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/24/2026M01205987-I1Open ↗
08/13/2026M01205987-P1Open ↗