← Back
BuildNYC
One family attached or semi-detached
4742 BEDFORD AVENUE
BROOKLYN · BIN 3247162
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R4Zoning
1,260 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One family attached or semi-detached · Owner of record: 4742 Bedford Group · 2,237 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
Site & exteriorUnder Construction42p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/02/2024$485K—Private party → 4742 BEDFORD GROUP LLC$385/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri603/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archvision Design Studio703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ecto RestorationScaffold208/11/2026
Ecto Restorationspecialty_contractor107/08/2026
Ecto Restorationspecialty_contractor104/09/2026
Katan P & HPlumbing107/08/2026
M & M Piping and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394503/09/2026
Mohammad Ahead - Professi9286308/21/2025
Building Lifecycle
08/28/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B01008387-S1-PL
08/10/2026
Permit renewed — Construction Fence
Renewed without changes
B01008387-S2-FN
06/25/2026
I observed a closed site. Construction fence erected along exp#1,2, and 4 is expired, in violation of bc 106.8.2
ECB violation · open
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedEcto Restoration08/10/2026
DOB NOWMechanical SystemsPermit IssuedEcto Restoration04/21/2026
DOB NOWConstruction FencePermit IssuedEcto Restoration11/20/2025
DOB NOWMechanical SystemsPermit IssuedEcto Restoration11/07/2025
DOB NOWPlumbingPermit IssuedKatan P & H08/28/2025
DOB NOWPlumbingPermit IssuedM & M Piping and Heating06/16/2025
1 project · most recent 03/09/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
03/09/2026Permit IssuedEcto RestorationHeating and Air Conditioning Systems
1 project · most recent 03/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/09/2026Permit IssuedKatan P & HGas, Storm, Water/Sanitary
1 project · most recent 10/16/2025
General Wiring
FiledStatusContractorScope
10/16/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 03/09/2026
Concrete Masonry Wood
FiledStatusContractorScope
03/09/2026Permit IssuedEcto RestorationConcrete, Masonry, Wood
1 project · most recent 03/09/2026
Fence
FiledStatusContractorScope
03/09/2026Permit IssuedEcto RestorationFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
05/22/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
03/02/2026Excavations - Sheeting, Shoring, and BracingMOHAMMAD AHEADspecial
03/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FARHAD BASSIRI-TEHRANIspecial
03/02/2026Subgrade InspectionsFARHAD BASSIRI-TEHRANIspecial
03/02/2026Structural Steel - WeldingMOHAMMAD AHEADspecial
03/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD AHEADspecial
03/02/2026MasonryMOHAMMAD AHEADspecial
03/02/2026Structural Steel - DetailsMOHAMMAD AHEADspecial
03/02/2026Structural Steel - High Strength BoltingMOHAMMAD AHEADspecial
03/02/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/02/2026Concrete - Cast-In-PlaceFARHAD BASSIRI-TEHRANIspecial
03/02/2026Fire-Resistant Penetrations and JointsMOHAMMAD AHEADspecial
03/02/2026Structural Stability – Alterations of existing buildingsFARHAD BASSIRI-TEHRANIspecial
03/02/2026FinalFARHAD BASSIRI-TEHRANIprogress
03/02/2026Lowest Floor ElevationFARHAD BASSIRI-TEHRANIprogress
03/02/2026Footing and FoundationFARHAD BASSIRI-TEHRANIprogress
03/02/2026Protection of exposed foundation insulationFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026Insulation placement and R valuesFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026Fenestration air leakageFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026Air barrier - visual inspectionFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026HVAC-R and service water piping design and insulationFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026Lighting in dwelling unitsFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026Interior lighting powerFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026Fenestration areasFARHAD BASSIRI-TEHRANIenergy_progress
03/02/2026Fenestration and door U-factor and product ratingsFARHAD BASSIRI-TEHRANIenergy_progress
Latest 25 of 81.
72 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account