| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/03/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ZRUN024GSS0 27,000 BTU · Vrf Outdoor ×15 ZRUM036GSS0 42,000 BTU · Vrf Outdoor ×12 ZRUM048GSS0 54,000 BTU · Vrf Outdoor ×1 ZRUM096BTE6 108,000 BTU · Vrf Outdoor ×1 ZRUM121BTE6 134,840 BTU · Vrf Outdoor ×1 Aaon RNA-015-B-A-8-GJB0A-A05N0 186,800 BTU · Doas ×1 Ventilation Greenheck QEI-12 1,540 CFM · Exhaust Fan ×2 CU-160HP-A 1,723 CFM · Exhaust Fan ×1 CUBE-100HP 315 CFM · Exhaust Fan ×1 SQ-97-VG 105 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/13/2018 | Cancelled | WILLDAN ELECTRICAL OF NY | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | — | — | Concrete |
| Owner | Filings | Most Recent |
|---|---|---|
| LE CAPITAL NYC | 4 | 09/14/2026 |
| JESSIE CONVENIENCES INC. | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| INM ARCHITECTS PC | 1 | 09/03/2026 |
| FLORINELA MURESAN | 3 | 08/13/2026 |
| STUDIOSC ARCHITECTURE PLLC | 1 | 07/28/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| WILLDAN ELECTRICAL OF NY | Electrical | 1 | 03/22/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/12/2026 | Post-installed Anchors | — | special |
| 08/12/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/12/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 08/12/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 08/12/2026 | Maintenance information | — | energy_progress |
| 08/11/2026 | Lighting in dwelling units | — | energy_progress |
| 08/11/2026 | Exterior lighting power | — | energy_progress |
| 08/11/2026 | Electrical motors and elevators | — | energy_progress |
| 08/11/2026 | Lighting controls | — | energy_progress |
| 08/11/2026 | Metering | — | energy_progress |
| 08/11/2026 | Interior lighting power | — | energy_progress |
| 07/29/2026 | Shutoff dampers | — | energy_progress |
| 07/29/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/29/2026 | Maintenance information | — | energy_progress |
| 07/29/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/29/2026 | Post-installed Anchors | — | special |
| 07/29/2026 | Mechanical Systems | — | special |
| 07/29/2026 | Final | — | progress |
| 07/29/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/29/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/05/2026 | Exterior Insulation and Finish Systems (EIFS) | — | special |
| 07/05/2026 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 07/05/2026 | Air barrier continuity plan testing | — | energy_progress |
| 07/05/2026 | Metering | — | energy_progress |