← Back
Predominantly retail with other uses
475 MYRTLE AVENUE
BROOKLYN · BIN 3054456
💬 Discuss this project
1960Year Built
2Stories
K4Building Class
R7AZoning
3,200 sfGross Floor Area
5Units
Predominantly retail with other uses · Owner of record: AMOL REALTY CORP · 3,200 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof3p · 1 filing · 19 docs
Floor 82p · 1 filing · 19 docs
Floor 72p · 1 filing · 19 docs
Floor 62p · 1 filing · 19 docs
Floor 53p · 1 filing · 19 docs
Floor 42p · 1 filing · 19 docs
Floor 32p · 1 filing · 19 docs
Floor 22p · 1 filing · 19 docs
Floor 13p · 1 filing · 19 docs
Cellar2p · 1 filing · 19 docs
1 job · most recent 09/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/03/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ZRUN024GSS0 27,000 BTU · Vrf Outdoor ×15
ZRUM036GSS0 42,000 BTU · Vrf Outdoor ×12
ZRUM048GSS0 54,000 BTU · Vrf Outdoor ×1
ZRUM096BTE6 108,000 BTU · Vrf Outdoor ×1
ZRUM121BTE6 134,840 BTU · Vrf Outdoor ×1
Aaon RNA-015-B-A-8-GJB0A-A05N0 186,800 BTU · Doas ×1
Ventilation
Greenheck QEI-12 1,540 CFM · Exhaust Fan ×2
CU-160HP-A 1,723 CFM · Exhaust Fan ×1
CUBE-100HP 315 CFM · Exhaust Fan ×1
SQ-97-VG 105 CFM · Exhaust Fan ×1
1 job · most recent 09/03/2026
FiledStatusContractorScope
09/03/2026———
1 job · most recent 07/13/2018
FiledStatusContractorScope
07/13/2018CancelledWILLDAN ELECTRICAL OF NY—
1 job · most recent 09/03/2026
Concrete
FiledStatusContractorScope
09/03/2026——Concrete
Building Lifecycle
All (38)Filed (5)Objection (3)Special Inspection (30)
09/03/2026
Filed — New Building
Propose foundation for a new 8-story cast-in-place residential building, filed in conjunction with NB # B01423447-I1.
B01423447-S4
08/20/2026
Objection raised — Other
08/20/2026
Objection raised — Other
08/20/2026
Objection raised — Other
08/13/2026
Filed — New Building
Propose foundation for a new 8-story cast-in-place residential building, filed in conjunction with NB # B01423447-I1.
B01423447-S2
08/13/2026
Filed — New Building
Propose foundation for a new 8-story cast-in-place residential building, filed in conjunction with NB # B01423447-I1.
B01423447-S1
08/13/2026
Filed — New Building
Propose foundation for a new 8-story cast-in-place residential building, filed in conjunction with NB # B01423447-I1.
B01423447-S3
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/12/2026
Special inspection requirement — Post-installed Anchors
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/12/2026
Special inspection requirement — Maintenance information
08/11/2026
Special inspection requirement — Lighting in dwelling units
08/11/2026
Special inspection requirement — Exterior lighting power
08/11/2026
Special inspection requirement — Electrical motors and elevators
08/11/2026
Special inspection requirement — Lighting controls
08/11/2026
Special inspection requirement — Metering
08/11/2026
Special inspection requirement — Interior lighting power
07/29/2026
Special inspection requirement — Shutoff dampers
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/29/2026
Special inspection requirement — Maintenance information
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2026
Special inspection requirement — Post-installed Anchors
07/29/2026
Special inspection requirement — Mechanical Systems
07/29/2026
Special inspection requirement — Final
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/28/2026
Filed — New Building
Propose foundation for a new 8-story cast-in-place residential building, filed in conjunction with NB # B01423447-I1.
B01423447-I1
07/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/05/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
07/05/2026
Special inspection requirement — Air barrier continuity plan testing
07/05/2026
Special inspection requirement — Metering
07/05/2026
Special inspection requirement — Protection of exposed foundation insulation
07/02/2026
Special inspection requirement — Air barrier - visual inspection
07/02/2026
Special inspection requirement — Maintenance information
07/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/02/2026
Special inspection requirement — Insulation placement and R values
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LE CAPITAL NYC409/14/2026
JESSIE CONVENIENCES INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INM ARCHITECTS PC109/03/2026
FLORINELA MURESAN308/13/2026
STUDIOSC ARCHITECTURE PLLC107/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/12/2026Fire-Resistant Penetrations and Joints—special
08/12/2026Post-installed Anchors—special
08/12/2026HVAC-R and service water heating system controls—energy_progress
08/12/2026HVAC-R and service water piping design and insulation—energy_progress
08/12/2026HVAC-R and service water heating equipment—energy_progress
08/12/2026Maintenance information—energy_progress
08/11/2026Lighting in dwelling units—energy_progress
08/11/2026Exterior lighting power—energy_progress
08/11/2026Electrical motors and elevators—energy_progress
08/11/2026Lighting controls—energy_progress
08/11/2026Metering—energy_progress
08/11/2026Interior lighting power—energy_progress
07/29/2026Shutoff dampers—energy_progress
07/29/2026HVAC-R and service water heating system controls—energy_progress
07/29/2026Maintenance information—energy_progress
07/29/2026Fire-Resistant Penetrations and Joints—special
07/29/2026Post-installed Anchors—special
07/29/2026Mechanical Systems—special
07/29/2026Final—progress
07/29/2026HVAC-R and service water piping design and insulation—energy_progress
07/29/2026HVAC-R and service water heating equipment—energy_progress
07/05/2026Exterior Insulation and Finish Systems (EIFS)—special
07/05/2026Wall Panels, Curtain Walls, and Veneers—special
07/05/2026Air barrier continuity plan testing—energy_progress
07/05/2026Metering—energy_progress
Latest 25 of 42.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026B01423447-S3Request digital key ↗
08/16/2026B01423447-S2Request digital key ↗
08/16/2026B01423447-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01423447-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026B01423447-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/15/2026B01423447-S5Open ↗
09/15/2026B01423447-S7Open ↗
09/15/2026B01423447-S4Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
09/15/2026B01423447-S7Open ↗
09/15/2026B01423447-S6Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/16/2026B01423447-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026B01423447-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026B01423447-I1Open ↗