Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacade and roof repairs, brick masonry replacementUnder Construction1 filing
Herewith filing Facade spot repair and roof repairs. No Change in use or egress.
On file for this project
3 documents
RoofHalstead Management Company LLCUnder Construction7p · 2 filings · 16 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
Mechanical Systems
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
On file for this project
4 documents · 7 drawing sheets
Direct replac. of condensing unit on roof top & Air Handler unit on PH Apart. to connect to existing ductwork. Install new split system condensing unit to connect to new one way ceiling cassette on master bedroom. No change of use, egress or occupancy
On file for this project
12 documents
PenthouseMechanical system replacement1 filing · 12 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Direct replac. of condensing unit on roof top & Air Handler unit on PH Apart. to connect to existing ductwork. Install new split system condensing unit to connect to new one way ceiling cassette on master bedroom. No change of use, egress or occupancy
On file for this project
12 documents
Floor 15Unit 15D2 filings · 12 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Replace kitchen and one bathroom plumbing fixtures.
On file for this project
6 documents
Herewith file plans for the interior renovation of apartment 15D. Remove and Construct minor partitions. Replace bathroom and kitchen. No change to use egress or occupancy.
On file for this project
6 documents
Floor 14
Floor 13
Floor 12
Floor 111 filing · 8 docs
PlumbingStructural
Issued Permit Scope
Plumbing · Structural
BATHROOM ALTERATION, EXISTING TUB, TOILET AND LAVATORY REMOVED AND REPLACED IN SAME LOCATION
On file for this project
8 documents
Floor 10Unit 10D1 filing · 8 docs
PlumbingStructural
Issued Permit Scope
Plumbing · Structural
BATHROOM ALTERATION, EXISTING TUB, TOILET AND LAVATORY REMOVED AND REPLACED IN SAME LOCATION
On file for this project
8 documents
Floor 9
Floor 8Unit 8E1 filing · 5 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
PROPOSED INTERIOR RENOVATION OF AN EXT'G RESIDENTIAL UNIT; APT 8E ON THE 8TH FLOOR. WORK INVOLVES MINOR INTERIOR DEMOLITION, NEW MILLWORK, NEW DOOR AND NEW DECORATIVE PILASTERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Floor 7Unit 7C1 filing · 9 docs
Structural
Issued Permit Scope
Structural
HEREBY FILING FOR THE INTERIOR RENOVATION ON 7TH FLOOR APT 7C. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
9 documents · 4 drawing sheets
Floor 6
Floor 5Unit 5A, Unit 5B, Unit 5C4p · 1 filing · 16 docs
ArchitectureDMGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 SHOWER, 2 LAVS, 3 WC, 2 TUBS, 1 SINK); CAP & REMOVE (1 TUB, 1 SINK); INSTALL NEW PLUMBING FIXTURES (1 LAV, 1 W/M); AND RELOCATE PLUMBING FIXTURES WITH NEW (1 LAV, 1 DW) AT APT 5A ON THE 5TH FL
On file for this project
16 documents · 4 drawing sheets
Floor 4Unit 4B, Unit 4D2 filings · 13 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
HEREBY FILING FOR THE INTERIOR RENOVATION ON 4TH FLOOR APT 4B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
8 documents
Renovate apt 4D. replace kit sink and dishwasher . Replace toilet, tub, lav in bath # 1. Replace toilet and lav in bath # 2. All in same rough in. No change in use egrress or occupancy
On file for this project
5 documents
Floor 3Unit 3D11p · 1 filing · 17 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Structural
Renovation of an existing apartment#3D1 on the third floor. No change to use, egress or occupancy.
On file for this project
21 documents · 1 drawing sheet
Floor 2
Floor 1Crockett & Jones, KvadartUnder Construction5p · 10 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
INTERIOR DEMOLITION OF RETAIL ON 1ST FLR AND CELLAR. INCLUDES REMOVAL OF EXSTNG NON-STRUCTURAL PARTITIONS, DOORS, CEILINGS, LIGHTS, FLOOR FINISHES, MILLWORK, AND ELECTRICAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents
STOREFRONT REPAIRS INCLUDING DOORS AND WINDOWS REPLACEMENT AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
INTERIOR RENOVATION TO EXISTING RETAIL SPACE. NEW LIGHTING THROUGHOUT. NO CHANGE TO ZONE, USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION. NO WORK TO WINDOWS AND FACADE.
On file for this project
9 documents
Latest 3 of 10 filings on this floor.
MezzanineKvadart4p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Subsequent mechanical filing for Job #M00453218-I1
On file for this project
6 documents · 2 drawing sheets
Subsequent structural filing for job #M00453218-I1
On file for this project
11 documents · 1 drawing sheet
Subsequent plumbing and sprinkler filing for Job #M00453218
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
CellarCrockett & Jones, KvadartUnder Construction5p · 3 filings · 16 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
INTERIOR DEMOLITION OF RETAIL ON 1ST FLR AND CELLAR. INCLUDES REMOVAL OF EXSTNG NON-STRUCTURAL PARTITIONS, DOORS, CEILINGS, LIGHTS, FLOOR FINISHES, MILLWORK, AND ELECTRICAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents
Subsequent mechanical filing for Job #M00453218-I1
On file for this project
6 documents · 2 drawing sheets
Subsequent plumbing and sprinkler filing for Job #M00453218
On file for this project
5 documents · 3 drawing sheets
Site & exteriorHalstead Management Company LLCUnder Construction5 filings · 16 docs
CivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
5 documents · 7 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents · 7 drawing sheets
Installation of temporary supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 7 drawing sheets
Latest 3 of 5 filings on this floor.