476 11TH STREET
BROOKLYN · Park Slope · BIN 3023015
💬 Discuss this project
1901Year Built
3Stories
A5Building Class
R6BZoning
2,942 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 1,683 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing work on cellar, basement, and floors 1-346p · 5 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 3Plumbing work on cellar, basement, and floors 1-341p · 5 filings · 20 docs
Floor 2Plumbing work on cellar, basement, and floors 1-343p · 5 filings · 20 docs
Floor 1Plumbing work on cellar, basement, and floors 1-348p · 6 filings · 20 docs
CellarPlumbing work on cellar, basement, and floors 1-325p · 4 filings · 20 docs
BasementConvert 2 family to 1 family dwelling with 3rd floor enlarge13p · 2 filings · 20 docs
Sub-BasementPlumbing work on cellar, basement, and floors 1-330p · 4 filings · 20 docs
Site & exteriorHeavy Duty Pipe Scaffold22p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/10/2021$2.0M—Private party → Private party$687/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Prudigm Engineering607/18/2023
Enigma Engineering408/23/2022
Gaby Tchilinguirian R.A303/23/2022
Navi Structural Engineering309/10/2021
Design Build Engineering108/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates2403/21/2026
Eurocelt Expediting603/21/2026
Laszlo Kovacs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dno Equipment and DevelopmentGeneral Contractor1507/08/2026
Dno Equipment and DevelopmentScaffold603/21/2026
Republic Exterior ServiceScaffold407/08/2026
Republic Scaffold & HoistScaffold407/08/2026
Accurate MechanicalPlumbing307/08/2026
QMB Plumbing & HeatingPlumbing207/08/2026
Accurate MechanicalGeneral Contractor203/22/2026
D.D.S. Mechanical PBG & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE20501207/18/2023
20/20 Inspections1471303/10/2022
Prudigm Engineering Llcu4304103/10/2022
Building Lifecycle
All (156)Filed (17)Permit Issued (19)Signed Off (8)Violation (6)Inspection (6)Objection (70)Special Inspection (30)
12/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/25/2023
Signed off — Alteration
Filing for plumbing work on floors Cellar, Basement, 1 thru 3, Roof. No change to use, egress, or occupancy.
B00498409-I1
07/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
07/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
07/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
07/18/2023
Filed — Alteration
Filing for plumbing work on floors Cellar, Basement, 1 thru 3, Roof. No change to use, egress, or occupancy.
B00498409-P4
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
07/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
07/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
06/07/2023
Objection resolved — Addressed
06/06/2023
Objection raised — Other
05/30/2023
Filed — Alteration
Filing for plumbing work on floors Cellar, Basement, 1 thru 3, Roof. No change to use, egress, or occupancy.
B00498409-P3
04/14/2023
Filed — Alteration
Filing for plumbing work on floors Cellar, Basement, 1 thru 3, Roof. No change to use, egress, or occupancy.
B00498409-P2
03/28/2023
Signed off — Alteration
B00667835-I1
03/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
03/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
03/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
03/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
03/09/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/08/2023
Signed off — Alteration
Subsequent foundation work associated with the rear deck. No change to use, egress, or occupancy.
B00500527-I1
03/07/2023
Signed off — Alteration
Subsequent foundation work associated with the rear deck. No change to use, egress, or occupancy.
B00500527-S1
02/16/2023
Permit issued — Plumbing
B00498409-I1-PL
01/24/2023
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00578811-I1
01/24/2023
Signed off — Alteration
B00579153-I1
01/19/2023
Signed off — Alteration
B00568054-I1
12/20/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/19/2022
Permit issued — Plumbing
B00498409-I1-PL
09/01/2022
Permit issued — Foundation
B00500527-S1-FO
08/30/2022
Special inspection requirement — Footing and Foundation
PAUL MARINO
08/30/2022
Special inspection requirement — Final
Sebastian Sztukowski
08/30/2022
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
08/30/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
08/23/2022
Filed — Alteration
Subsequent foundation work associated with the rear deck. No change to use, egress, or occupancy.
B00500527-P2
08/22/2022
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
08/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
08/22/2022
Special inspection requirement — Final
Sebastian Sztukowski
08/22/2022
Special inspection requirement — Footing and Foundation
PAUL MARINO
08/15/2022
Objection resolved — Addressed
08/08/2022
Permit issued — Construction Fence
B00568054-I1-FN
07/26/2022
Signed off — Alteration
Filing for renovation of an existing 2 family residence in cellar, basement, 1 thr 3, roof. Work includes removal of interior non load bearing partitions, chimney, doors, finish work. No change to use, egress, or occupancy.
B00465155-I1
07/11/2022
Objection resolved — Addressed
07/06/2022
Permit issued — Structural
B00500527-I1-ST
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection resolved — Addressed
06/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2022
Permit issued — General Construction
B00484976-I1-GC
05/11/2022
Objection resolved — Addressed
05/02/2022
Objection resolved — Addressed
04/29/2022
Special inspection requirement — Fenestration air leakage
PAUL MARINO
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAnthony Disabato02/16/2023
DOB NOWPlumbingSigned-offQMB Plumbing & Heating11/19/2022
DOB NOWFoundationSigned-offDno Equipment and Development09/01/2022
DOB NOWConstruction FenceSigned-offDno Equipment and Development08/08/2022
DOB NOWStructuralSigned-offDno Equipment and Development07/06/2022
DOB NOWGeneral ConstructionPermit IssuedDno Equipment and Development05/12/2022
DOB NOWSidewalk ShedSigned-offRepublic Exterior Service03/31/2022
DOB NOWSupported ScaffoldSigned-offRepublic Exterior Service03/31/2022
DOB NOWMechanical SystemsSigned-offDno Equipment and Development03/17/2022
DOB NOWGeneral ConstructionSigned-offDno Equipment and Development03/01/2022
DOB NOWGeneral ConstructionPermit IssuedDno Equipment and Development01/06/2022
DOB NOWPlumbingSigned-offQMB Plumbing & Heating11/22/2021
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist08/19/2021
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist08/18/2021
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating08/17/2021
DOB NOWConstruction FenceSigned-offDno Equipment and Development08/06/2021
DOB NOWGeneral ConstructionPermit IssuedDno Equipment and Development07/27/2021
DOB NOWStructuralSigned-offDno Equipment and Development07/02/2021
DOB NOWGeneral ConstructionSigned-offDno Equipment and Development03/08/2021
2 projects · most recent 11/14/2021
General Wiring
FiledStatusContractorScope
11/14/2021CompleteRome Electrical ContsGeneral Wiring
08/24/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/09/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/09/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/20/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
07/28/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/28/2023HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
07/28/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
07/28/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
07/05/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/05/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
07/05/2023HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
07/05/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
03/21/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
03/21/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
03/21/2023HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
03/21/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
08/30/2022Footing and FoundationPAUL MARINOprogress
08/30/2022FinalSebastian Sztukowskiprogress
08/30/2022Concrete - Cast-In-PlacePAUL MARINOspecial
08/30/2022Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
08/22/2022Concrete - Cast-In-PlacePAUL MARINOspecial
08/22/2022Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
08/22/2022FinalSebastian Sztukowskiprogress
08/22/2022Footing and FoundationPAUL MARINOprogress
04/29/2022Fenestration air leakagePAUL MARINOenergy_progress
04/29/2022Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/29/2022Chimneys and ventsPAUL MARINOspecial
04/29/2022Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
04/29/2022Fire-Resistance Rated ConstructionPAUL MARINOprogress
Latest 25 of 57.
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
09/01/2026B00500527-P2Request digital key ↗
09/01/2026B00498409-P2Request digital key ↗
09/01/2026B00498409-P4Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00465155-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)2
08/30/2026B00484976-I1Open ↗
08/15/2026B00484976-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/30/2026B00484976-I1Open ↗
08/15/2026B00484976-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/30/2026B00484976-I1Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature33
09/25/2026B00500527-S1Open ↗
09/25/2026B00500527-S1Open ↗
09/01/2026B00484976-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/25/2026B00500527-S1Open ↗
09/25/2026B00500527-S1Open ↗
09/01/2026B00484976-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00465155-I1Open ↗
09/01/2026B00500527-S1Open ↗
09/01/2026B00500527-P1Open ↗
Showing 3 of 17 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/30/2026B00484976-I1Open ↗
08/15/2026B00484976-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/30/2026B00484976-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/01/2026B00465155-I1Open ↗
09/01/2026B00500527-P2Open ↗
09/01/2026B00498409-P2Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/30/2026B00484976-I1Open ↗
08/15/2026B00498409-I1Open ↗
08/13/2026B00667835-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/30/2026B00484976-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/30/2026B00484976-I1Open ↗
▸Other Documents11
▸DOB NOWSURVEY: INITIAL5
08/30/2026B00484976-I1Open ↗
08/15/2026B00484976-P1Open ↗
08/15/2026B00484976-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram2
08/30/2026B00484976-I1Open ↗
08/15/2026B00484976-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/30/2026B00484976-I1Open ↗
08/15/2026B00484976-P1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/30/2026B00484976-I1Open ↗
▸DOB NOWFinal Survey1
08/30/2026B00484976-I1Open ↗