← Back
Two stories - detached, small or mid-size
476 WESTMINSTER ROAD
BROOKLYN · Flatbush (West)-Ditmas Park-Parkville · BIN 3119265
💬 Discuss this project
1906Year Built
2.75Stories
A1Building Class
R3XZoning
2,583 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 12 docs
Floor 11p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC206/26/2024
RISE ARCHITECTURE106/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES103/21/2026
KAMTECH RESTORATION CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAMTECH RESTORATION CORPGeneral Contractor104/09/2026
L C CARPIO NO 2 CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802206/26/2024
Building Lifecycle
All (16)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Objection (2)Special Inspection (6)
08/27/2024
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01052120-I1
06/26/2024
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01052120-P1
06/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
06/26/2024
Special inspection requirement — Final
Kaijin Liang
06/26/2024
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
05/21/2024
Permit issued — Solar
B01052120-I1-SL
05/15/2024
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01052120-I1
11/08/2021
Signed off — Alteration
OUTSIDE DECK RENOVATION TO RESOLVE VIOLATION
B00526561-I1
08/02/2021
Permit issued — General Construction
B00526561-I1-GC
07/08/2021
Objection raised — Scope
07/08/2021
Objection resolved — Addressed
06/30/2021
Filed — Alteration
OUTSIDE DECK RENOVATION TO RESOLVE VIOLATION
B00526561-I1
05/21/2021
Special inspection requirement — Final
SHIMON GREENEBAUM
03/23/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP05/21/2024
DOB NOWGeneral ConstructionSigned-offL C CARPIO NO 208/02/2021
1 project · most recent 07/25/2024
FiledStatusContractorScope
07/25/2024CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/26/2024Structural Stability – Alterations of existing buildingsKaijin Liangspecial
06/26/2024Fire-Resistant Penetrations and JointsKaijin Liangspecial
06/26/2024Energy Code Compliance InspectionsKaijin Liangprogress
06/26/2024FinalKaijin Liangprogress
06/26/2024Air barrier - visual inspectionKaijin Liangenergy_progress
05/21/2021FinalSHIMON GREENEBAUMprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026B01052120-I1Request digital key ↗
08/25/2026B01052120-P1Request digital key ↗
08/15/2026B00526561-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B01052120-I1Open ↗
09/02/2026B01052120-I1Open ↗
09/02/2026B01052120-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026B01052120-I1Open ↗
08/25/2026B01052120-P1Open ↗
08/13/2026B00526561-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01052120-I1Open ↗
09/02/2026B01052120-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026B01052120-I1Open ↗
08/25/2026B01052120-P1Open ↗
08/13/2026B00526561-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01052120-I1Open ↗