← Back
BuildNYC
Walk-up apt, over six families with stores
477 LENOX AVENUE
MANHATTAN · BIN 1058228
💬 Discuss this project
1926Year Built
5Stories
C7Building Class
R7-2Zoning
11,790 sfGross Floor Area
15Units
Rent Stabilized9 Active Violations 1 likely answered ▸
Walk-up apt, over six families with stores · Owner of record: 477 Lenox Member · 2,500 sf lot · 4.72 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 11 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S&S Holding503/21/2026
477 Food307/08/2026
477 Lenox Member303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/26/2023$7.4M—SL LENOX HOLDINGS LLC → 477 LENOX MEMBER LLC$628/sf building
07/14/2016$4.5M—S. & S. HOLDING CORP. → 477 LENOX HOUSING DEVELOPMENT FUND CORPORATION$385/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GBN Engineering107/07/2021
Alberto Roman109/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group103/21/2026
Superior Fire Control103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Superior Fire Controlspecialty_contractor107/08/2026
Ideal Fire SystemsFire Protection108/07/2003
LBM Construction of NYGeneral Contractor108/25/2017
Lilly ConstructionGeneral Contractor107/01/2002
Rennon ConstructionGeneral Contractor108/25/2017
Squan Construction ServicesGeneral Contractor106/02/2015
Telcom Engineering GroupGeneral Contractor106/17/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-Tech Engineering6659109/01/2020
Building Lifecycle
06/29/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4W, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · open
06/29/2026
§ 27-2033 ADM code provide ready access to buildings heating system locked door at boiler room
HPD violation · open
06/29/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ. FT AT CEILING, NORTH, WEST, AND SOUTH WALLS…
HPD violation · open
06/21/2026
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage receptacles at…
HPD violation · open
06/11/2026
§ 27-2033 ADM code provide ready access to buildings heating system door locked at basement at boiler room
HPD violation · closed
211 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Superior Fire Control—
BIS—LBM Construction of NY—
BIS—Rennon Construction—
BIS—Squan Construction Services—
BIS—Telcom Engineering GP—
BIS—Ideal Fire Systems—
BIS—Lilly Construction—
Nothing on file for this building.
Nothing on file for this building.
67 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account