← Back
QUEENS
48-03 192 STREET
QUEENS · BIN 4626080
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AN SHEN MA ARCHITECT408/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYKER SOLUTIONS INCGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AN SHEN MA ARCHITECT2968108/11/2026
HRF SERVICES CORP5616108/11/2026
Building Lifecycle
All (55)Filed (4)Permit Issued (1)Objection (20)Special Inspection (30)
08/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01399685-S3
08/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
AN MA
08/05/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
08/04/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Addressed
06/18/2026
Permit issued — Construction Fence
Q01399685-S1-FN
06/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01399685-S2
06/03/2026
Objection resolved — Addressed
06/02/2026
Objection resolved — Addressed
05/27/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01399685-S1
05/26/2026
Objection raised — Other
05/26/2026
Objection raised — Cost
05/26/2026
Objection raised — Other
05/26/2026
Objection raised — Scope
05/26/2026
Objection raised — Scope
05/26/2026
Objection raised — Energy
05/26/2026
Objection raised — Scope
05/26/2026
Objection raised — Zoning
05/26/2026
Objection raised — Other
05/26/2026
Objection raised — Other
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
AN MA
05/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
05/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01399685-I1
05/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/08/2026
Special inspection requirement — Subgrade Inspections
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/08/2026
Special inspection requirement — Final
05/08/2026
Special inspection requirement — Footing and Foundation
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
05/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/08/2026
Special inspection requirement — Structural Wood Frame
05/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/08/2026
Special inspection requirement — Interior lighting power
05/08/2026
Special inspection requirement — Mechanical Systems
05/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/08/2026
Special inspection requirement — Maintenance information
05/08/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/08/2026
Special inspection requirement — Fenestration areas
05/08/2026
Special inspection requirement — Insulation placement and R values
05/08/2026
Special inspection requirement — Fenestration air leakage
05/08/2026
Special inspection requirement — Permanent certificate
05/08/2026
Special inspection requirement — Ventilation and air distribution system
05/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/08/2026
Special inspection requirement — Air barrier - visual inspection
05/08/2026
Special inspection requirement — Air barrier — testing
05/08/2026
Special inspection requirement — Structural Cold-Formed Steel
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedDYKER SOLUTIONS INC06/18/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAN MAspecial
08/05/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSHAHRIAR QUAYYUMspecial
08/05/2026HVAC-R and service water heating system controlsAN MAenergy_progress
05/15/2026Fire-Resistant Penetrations and JointsAN MAspecial
05/15/2026Energy Code Compliance InspectionsAN MAprogress
05/15/2026HVAC-R and service water piping design and insulationAN MAenergy_progress
05/08/2026Structural Steel - High Strength Bolting—special
05/08/2026Subgrade Inspections—special
05/08/2026Structural Stability – Alterations of existing buildings—special
05/08/2026Final—progress
05/08/2026Footing and Foundation—progress
05/08/2026Energy Code Compliance Inspections—progress
05/08/2026Fire-Resistance Rated Construction—progress
05/08/2026Structural Wood Frame—progress
05/08/2026HVAC-R and service water heating system controls—energy_progress
05/08/2026Fenestration and door U-factor and product ratings—energy_progress
05/08/2026Interior lighting power—energy_progress
05/08/2026Mechanical Systems—special
05/08/2026HVAC-R and service water piping design and insulation—energy_progress
05/08/2026Maintenance information—energy_progress
05/08/2026Electric vehicle service equipment requirements—energy_progress
05/08/2026Fenestration areas—energy_progress
05/08/2026Insulation placement and R values—energy_progress
05/08/2026Fenestration air leakage—energy_progress
05/08/2026Permanent certificate—energy_progress
Latest 25 of 34.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026Q01399685-S3Request digital key ↗
08/16/2026Q01399685-S2Request digital key ↗
08/16/2026Q01399685-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01399685-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026Q01399685-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01399685-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026Q01399685-S1Open ↗
08/16/2026Q01399685-S3Open ↗
08/16/2026Q01399685-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01399685-S3Open ↗
08/23/2026Q01399685-S3Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01399685-S3Open ↗
08/23/2026Q01399685-S3Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026Q01399685-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026Q01399685-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01399685-S3Open ↗
08/15/2026Q01399685-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/15/2026Q01399685-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01399685-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01399685-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q01399685-I1Open ↗