2 Open Violations 0 unresolved · 2 paperwork only▸
ECB10/31/2011WORK W/O A PERMIT. AT THE TIME OF INSPECTION I OBSERVED 1 WEIL-MCLAIN BOILER AND 1 G.E. HWH INSTALLED IN THE CELLAR W/O A PERMIT. REMEDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB10/31/2011GAS BEING SUPPLIED TO BLDG W/O INSPECTION AND CERTIFICATION BY DOB. ATTHE TIME OF INSPECTION I OBSERVED 1 WEIL-MCLAIN BOILER AND 1 G.E. HOT WATER HEATER IN USE W/O GAS AUTHORIZATION. INSPECTIONS MUST BE DONE TONothing owed — awaiting certificate of correction
One story - permanent living quarter · 5,000 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.