Factory, industrial, semi-fireproof
48-25 36 STREET
QUEENS · BIN 4003377
💬 Discuss this project
1953Year Built
1Stories
F4Building Class
M1-1Zoning
25,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, industrial, semi-fireproof · 30,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof9p · 2 filings · 20 docs
Floor 112p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP704/09/2026
OLMSTEAD PROPERTIES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMINION EXPEDITING803/21/2026
LEVIN ENGINEERING PLLC403/21/2026
ARPAD BAKSA ARCHITECT, P.C.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEKALB DEVELOPMENT CORPGeneral Contractor504/09/2026
PARK CONTRACTING GROUPGeneral Contractor204/09/2026
EMPIRE STATE FIRE SPRINKLFire Protection207/08/2026
MID COUNTY MECHANICAL CORGeneral Contractor104/09/2026
CAPE PLUMBING INCPlumbing107/08/2026
JASON SALOME ELEC'L CONTGElectrical103/22/2026
MASTER TECH PLUMBING LLCPlumbing107/08/2026
2260 MAG CORPGeneral Contractor107/08/2026
CITY SUBURB INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524302/19/2026
LEVIN ENGINEERING PLLC1267212/05/2025
BAZINI ENGINEERING, P.C.1808111/20/2025
LMW ENGINEERING GROUP LLC279310/09/2025
AA BUILDING & INSPECTION1519106/23/2025
JCT DEVELOPMENT NY, INC5030308/14/2020
Building Lifecycle
All (97)Filed (16)Permit Issued (13)Signed Off (8)Violation (9)Inspection (9)Objection (12)Special Inspection (30)
08/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01261584-I1
05/19/2026
Signed off — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-S3
05/19/2026
Signed off — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-I1
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2026
Signed off — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-S2
03/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM. DESIGNED BY HYDRAULIC CALCULATION AS PER NFPA-13 2007 SECTION 22.4.2.1.1 NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01232990-I1
03/10/2026
Signed off — Alteration
INSTALL VENTILATION SYSTEM FOR TWO STORAGE ACETYLENE ROOMS ON THE FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01316463-I1
02/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2026
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
02/23/2026
Special inspection requirement — Masonry
Shahrish Shuvo
02/23/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
02/23/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
02/23/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
02/23/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
02/23/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
02/23/2026
Special inspection requirement — Final
Shahrish Shuvo
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/20/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
02/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/19/2026
Filed — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-P1
02/19/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Permit issued — Sprinklers
Q01232990-I1-EW-SP
01/20/2026
Special inspection requirement — Sprinkler Systems
Dmitry Levin
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dmitry Levin
01/02/2026
Objection resolved — Addressed
01/02/2026
Objection resolved — Addressed
12/30/2025
Objection raised — Scope
12/30/2025
Objection raised — Scope
12/11/2025
Permit issued — Mechanical Systems
Q01316463-I1-GC-CX
12/05/2025
Filed — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM. DESIGNED BY HYDRAULIC CALCULATION AS PER NFPA-13 2007 SECTION 22.4.2.1.1 NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01232990-P1
12/05/2025
Special inspection requirement — Sprinkler Systems
Dmitry Levin
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dmitry Levin
11/25/2025
Filed — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-P3
11/20/2025
Filed — Alteration
INSTALL VENTILATION SYSTEM FOR TWO STORAGE ACETYLENE ROOMS ON THE FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01316463-I1
11/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/10/2025
Special inspection requirement — Mechanical Systems
Joseph Bazini
11/10/2025
Special inspection requirement — Final
Joseph Bazini
10/17/2025
Signed off — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-S1
10/17/2025
Signed off — Alteration
APPLICATION FOR PARTIAL DEMOLITION OF PARAPETWALL & REBUILD MATCHING WITH THE EXISTING ONE,NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01225900-I1
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jieming Wang
10/10/2025
Special inspection requirement — Final
Jieming Wang
10/10/2025
Special inspection requirement — Structural Steel - Details
Jieming Wang
10/10/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Jieming Wang
10/09/2025
Filed — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-P2
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/26/2025
Permit issued — Plumbing
Q01204349-S3-PL
09/25/2025
Filed — Alteration
Installation of Mechanical system related to renovation in existing 1 story building.
Q01204349-S3
08/12/2025
Permit issued — General Construction
Q01225900-I1-GC
08/11/2025
Special inspection requirement — Final
Jieming Wang
08/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jieming Wang
08/11/2025
Special inspection requirement — Structural Steel - Details
Jieming Wang
08/11/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Jieming Wang
07/30/2025
Permit issued — Sidewalk Shed
Q01261584-I1-SH
07/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01261584-I1
07/21/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
07/21/2025
Special inspection requirement — Masonry
Shahrish Shuvo
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offEMPIRE STATE FIRE SPRINKL01/28/2026
DOB NOWMechanical SystemsSigned-offMID COUNTY MECHANICAL COR12/11/2025
DOB NOWPlumbingSigned-offMASTER TECH PLUMBING LLC09/26/2025
DOB NOWGeneral ConstructionSigned-offDEKALB DEVELOPMENT08/12/2025
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP07/30/2025
DOB NOWSprinklersSigned-offEMPIRE STATE FIRE SPRINKL07/14/2025
DOB NOWMechanical SystemsSigned-offDEKALB DEVELOPMENT07/03/2025
DOB NOWStructuralSigned-offDEKALB DEVELOPMENT07/01/2025
DOB NOWGeneral ConstructionSigned-offDEKALB DEVELOPMENT06/27/2025
DOB NOWGeneral ConstructionSigned-offCITY SUBURB INC05/16/2025
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP04/09/2025
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC01/25/2021
DOB NOWMechanical SystemsPermit Issued2260 MAG CORP09/11/2020
BISOTISSUEDBJS RENOVATIONS INC09/07/2020
BIS—ISSUEDBJS RENOVATIONS INC08/19/2020
BISPLISSUEDQMB PLUMBING & HEATING INC09/28/2018
BISOTISSUEDWEIS DESIGN MANAGEMENT*08/10/2018
BISCCISSUEDWEIS DESIGN MANAGEMENT*10/24/2017
BISPLISSUEDQMB PLUMBING & HEATING INC06/09/2017
BISOTISSUEDWEIS DESIGN MANAGEMENT*06/05/2017
BISPLISSUEDS & L PLUMBING INC03/08/2005
BISPLISSUEDL.R.P. CORPORATION03/11/2004
BISMHISSUEDORIENTAL CONSTRUCTION LLC03/05/2004
BISPLISSUEDWASOFF PLBG & UTILITY CO10/31/2003
BISOTISSUEDORIENTAL CONSTRUCTION10/22/2003
BISMHISSUEDRONALD T VASS CORP.04/25/1994
1 project · most recent 02/19/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/19/2026Signed-offDEKALB DEVELOPMENT CORPAir Conditioning Systems, Heating Systems
Cooling
Daikin DFG1203DH000001SAA 10 tons · Rooftop Unit ×2
DFG1803DH000001SAA 15 tons · Rooftop Unit ×2
DFG0903DM000001SAA 3,020 CFM · Rooftop Unit ×1
Heating
Nortek UDX-150 2,180 CFM ×3
2 projects · most recent 02/19/2026
Water/Sanitary Gas
FiledStatusContractorScope
02/19/2026Signed-offMASTER TECH PLUMBING LLCGas, Water/Sanitary
08/01/2020Permit IssuedCAPE PLUMBING INCWater/Sanitary
4 projects · most recent 04/14/2026
General Wiring
FiledStatusContractorScope
04/14/2026CompleteJASON SALOME ELEC'L CONTGGeneral Wiring
04/09/2025CompleteRICHARD NEU—
07/13/2020Permit IssuedGEORGE HOLNESSGeneral Wiring
01/13/2020CompleteINTELOGIC ELECTRIC, INC.1 meters, 1 new_meters
1 project · most recent 02/19/2026
Steel
FiledStatusContractorScope
02/19/2026Signed-offMASTER TECH PLUMBING LLCSteel
2 projects · most recent 07/28/2025
Sidewalk Shed
FiledStatusContractorScope
07/28/2025Signed-offPARK CONTRACTING GROUPSidewalk Shed
04/08/2025Signed-offPARK CONTRACTING GROUPSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/20/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
02/23/2026Concrete - Cast-In-PlaceShahrish Shuvospecial
02/23/2026MasonryShahrish Shuvospecial
02/23/2026Fenestration areasShahrish Shuvoenergy_progress
02/23/2026Interior lighting powerShahrish Shuvoenergy_progress
02/23/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
02/23/2026Lighting controlsShahrish Shuvoenergy_progress
02/23/2026Fenestration air leakageShahrish Shuvoenergy_progress
02/23/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
02/23/2026FinalShahrish Shuvoprogress
02/23/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
02/23/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
01/20/2026Sprinkler SystemsDmitry Levinspecial
01/20/2026Fire-Resistant Penetrations and JointsDmitry Levinspecial
12/05/2025Sprinkler SystemsDmitry Levinspecial
12/05/2025Fire-Resistant Penetrations and JointsDmitry Levinspecial
11/10/2025Mechanical SystemsJoseph Bazinispecial
11/10/2025FinalJoseph Baziniprogress
10/10/2025Structural Stability – Alterations of existing buildingsJieming Wangspecial
10/10/2025FinalJieming Wangprogress
10/10/2025Structural Steel - DetailsJieming Wangspecial
10/10/2025Structural Steel - High Strength BoltingJieming Wangspecial
08/11/2025FinalJieming Wangprogress
08/11/2025Structural Stability – Alterations of existing buildingsJieming Wangspecial
08/11/2025Structural Steel - DetailsJieming Wangspecial
08/11/2025Structural Steel - High Strength BoltingJieming Wangspecial
Latest 25 of 55.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
08/20/2026Q01206574-I1Request digital key ↗
08/20/2026Q01225900-I1Request digital key ↗
08/19/2026Q01204349-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00365341-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00365311-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00365327-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION14
04/18/2025421471632Open ↗
04/18/2025421664416Open ↗
02/11/2025421186558Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION7
09/07/2020440600565Open ↗
08/19/2020421186558Open ↗
12/12/2018421664416Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/11/2025421186558Open ↗
07/09/2020421186558Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/17/2021421186558Open ↗
▸Seals & Professional Certifications67
▸DOB NOWSpecial Inspector Seal & Signature19
09/17/2026Q01316463-I1Open ↗
09/05/2026Q01204349-P1Open ↗
09/05/2026Q01204349-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/17/2026Q01316463-I1Open ↗
09/05/2026Q01204349-P1Open ↗
09/05/2026Q01204349-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00365311-I1Open ↗
08/28/2026Q00365341-I1Open ↗
08/20/2026Q01206574-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/01/2020440600565Open ↗
09/14/2018421664416Open ↗
04/25/2017421471632Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/01/2020440600565Open ↗
09/14/2018421664416Open ↗
04/25/2017421470964Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/14/2018421664416Open ↗
06/09/2017421471632Open ↗
04/21/2017421470964Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/01/2020440600565Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/01/2020440600565Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/14/2018421664416Open ↗
04/25/2017421471632Open ↗
▸BISSCHEDULE B - PLUMBING1
11/26/2024421664416Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/09/2020421186558Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/28/2026Q00365311-I1Open ↗
08/28/2026Q00365341-I1Open ↗
08/20/2026Q01225900-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/09/2020421186558Open ↗
07/01/2020440600565Open ↗
09/14/2018421664416Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/27/2020440600565Open ↗
07/21/2020421186558Open ↗
07/19/2020440600565Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/14/2018421664416Open ↗
04/21/2017421471632Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/01/2020440600565Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/09/2020421186558Open ↗
▸BISNYCECC ANALYSIS1
07/01/2020440600565Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/27/2020440600565Open ↗
07/19/2020440600565Open ↗
07/09/2020421186558Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
04/25/2017421471632Open ↗
04/21/2017421470964Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/24/2020421186558Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
07/01/2020440600565Open ↗
09/14/2018421664416Open ↗
04/25/2017421471632Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/09/2020421186558Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
08/24/2020421186558Open ↗
09/17/2018421664416Open ↗
04/21/2017421471632Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
07/15/2020421186558Open ↗
10/15/2018421471632Open ↗
05/22/2018421471632Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/01/2020440600565Open ↗