← Back
BuildNYC
Cape Cod
48-34 188TH STREET
QUEENS · BIN 4127213
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2AZoning
1,045 sfGross Floor Area
1Units
Cape Cod · Owner of record: Hland Group · 4,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHland Group LLCUnder Construction5p · 2 filings · 20 docs
AtticLin's 1-Family Detached ResidenceUnder Construction13p · 1 filing · 20 docs
Floor 2Lin's 1-Family Detached ResidenceUnder Construction15p · 1 filing · 20 docs
Floor 1Lin's 1-Family Detached ResidenceUnder Construction19p · 1 filing · 20 docs
CellarLin's 1-Family Detached ResidenceUnder Construction16p · 1 filing · 20 docs
Site & exteriorLin's 1-Family Detached ResidenceUnder Construction4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2025$998K—Private party → Hland Group$955/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chun Feng210/13/2026
Mei Architect310/01/2026
Mehdi Ghazi, P.E507/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mei Architect803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Genesis NYC ConstructionGeneral Contractor409/07/2026
Genesis NYC ConstructionScaffold407/08/2026
S & L PlumbingPlumbing208/12/2026
Amergy SolarGeneral Contractor107/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sq. Arch4802210/13/2026
Mehdi Ghazi, P.E7129510/01/2026
Triangle Inspection & Tes7495104/07/2026
Building Lifecycle
All (56)Filed (10)Permit Issued (9)Inspection (3)Objection (4)Special Inspection (30)
10/13/2026
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01433186-P1
10/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01253123-P1
10/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
10/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
10/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
10/01/2026
Special inspection requirement — Interior lighting power
MEHDI GHAZI
10/01/2026
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
10/01/2026
Special inspection requirement — Metering
MEHDI GHAZI
10/01/2026
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
10/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
10/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
10/01/2026
Special inspection requirement — Fenestration areas
MEHDI GHAZI
10/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
10/01/2026
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
10/01/2026
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
10/01/2026
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
10/01/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
10/01/2026
Special inspection requirement — Heating Systems
MEHDI GHAZI
10/01/2026
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
10/01/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
10/01/2026
Special inspection requirement — Final
MEHDI GHAZI
10/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
10/01/2026
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
10/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
10/01/2026
Special inspection requirement — Maintenance information
MEHDI GHAZI
10/01/2026
Special inspection requirement — Permanent certificate
MEHDI GHAZI
09/11/2026
Objection resolved — Addressed
09/09/2026
Objection raised — Other
08/31/2026
Permit issued — Curb Cut
Q01253123-S4-CC
08/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01253123-S6
08/11/2026
Permit issued — Plumbing
Q01253123-S3-PL
07/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01253123-S4
07/27/2026
Permit issued — Solar
Q01433186-I1-SL
07/24/2026
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01433186-I1
06/30/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2026
Permit issued — Construction Fence
Q01252619-I1-FN
04/14/2026
Permit issued — Plumbing
Q01253123-S3-PL
04/07/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01253123-S3
03/11/2026
Permit issued — Earth Work
Q01253123-S1-FO-EA
03/11/2026
Permit issued — General Construction
Q01253123-I1-GC-CX
03/11/2026
Permit issued — Structural
Q01253123-S2-ST
03/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01253123-S2
03/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01253123-S1
02/11/2026
Objection resolved — Addressed
01/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
12/18/2025
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
12/18/2025
Special inspection requirement — Masonry
MEHDI GHAZI
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
12/18/2025
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
07/31/2025
Objection raised — Admin
07/11/2025
Permit issued — Construction Fence
Q01252619-I1-FN
07/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01253123-I1
07/08/2025
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01252619-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedGenesis NYC Construction08/31/2026
DOB NOWPlumbingSigned-offS & L Plumbing08/11/2026
DOB NOWSolarPermit IssuedAmergy Solar07/27/2026
DOB NOWConstruction FencePermit IssuedGenesis NYC Construction06/15/2026
DOB NOWPlumbingSigned-offS & L Plumbing04/14/2026
DOB NOWEarth WorkPermit IssuedGenesis NYC Construction03/11/2026
DOB NOWGeneral ConstructionPermit IssuedGenesis NYC Construction03/11/2026
DOB NOWStructuralPermit IssuedGenesis NYC Construction03/11/2026
DOB NOWConstruction FencePermit IssuedGenesis NYC Construction07/11/2025
1 project · most recent 10/01/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/01/2026Permit IssuedGenesis NYC ConstructionHeating and Air Conditioning Systems
Heat / Cool
Goodman GLZS4BA6010 60,000 BTU · Heat Pump Outdoor ×4
GLZS4BA3610 36,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 10/01/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/01/2026Signed-offS & L PlumbingStorm, Water/Sanitary
2 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026CompleteI.P. Electric—
03/17/2026Permit IssuedIntelogic ElectricGeneral Wiring
1 project · most recent 10/01/2026
Steel Masonry Wood
FiledStatusContractorScope
10/01/2026Permit IssuedGenesis NYC ConstructionSteel, Masonry, Wood
1 project · most recent 10/13/2026
FiledStatusContractorScope
10/13/2026Permit IssuedAmergy Solar60 panels, 26.4 kw, 1,738 roof_area_sqft
1 project · most recent 07/08/2025
Fence
FiledStatusContractorScope
07/08/2025Permit IssuedGenesis NYC ConstructionFence
1 project · most recent 10/01/2026
Earthwork
FiledStatusContractorScope
10/01/2026Permit IssuedGenesis NYC ConstructionEarthwork
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/30/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
10/01/2026Fenestration air leakageMEHDI GHAZIenergy_progress
10/01/2026Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
10/01/2026Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
10/01/2026Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
10/01/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
10/01/2026Heating SystemsMEHDI GHAZIspecial
10/01/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
10/01/2026Air barrier - visual inspectionMEHDI GHAZIenergy_progress
10/01/2026Ventilation and air distribution systemMEHDI GHAZIenergy_progress
10/01/2026MeteringMEHDI GHAZIenergy_progress
10/01/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
10/01/2026Permanent certificateMEHDI GHAZIenergy_progress
10/01/2026Maintenance informationMEHDI GHAZIenergy_progress
10/01/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
10/01/2026Insulation placement and R valuesMEHDI GHAZIenergy_progress
10/01/2026Interior lighting powerMEHDI GHAZIenergy_progress
10/01/2026Fenestration areasMEHDI GHAZIenergy_progress
10/01/2026Air barrier — testing MEHDI GHAZIenergy_progress
10/01/2026Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
10/01/2026Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
10/01/2026FinalMEHDI GHAZIprogress
10/01/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
10/01/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/01/2026Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
10/01/2026Mechanical SystemsMEHDI GHAZIspecial
Latest 25 of 71.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026Q01252619-I1Request digital key ↗
08/17/2026Q01253123-I1Request digital key ↗
08/17/2026Q01253123-S4Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWHouse Number Verification: TOPO Stamp2
10/04/2026Q01253123-P1Open ↗
08/13/2026Q01253123-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
10/04/2026Q01253123-P1Open ↗
08/13/2026Q01253123-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
10/04/2026Q01253123-P1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature10
10/04/2026Q01253123-P1Open ↗
10/04/2026Q01253123-P1Open ↗
10/04/2026Q01253123-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/04/2026Q01253123-P1Open ↗
10/04/2026Q01253123-P1Open ↗
09/23/2026Q01253123-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/04/2026Q01253123-P1Open ↗
08/21/2026Q01253123-S6Open ↗
08/17/2026Q01253123-S2Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01253123-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/21/2026Q01253123-S6Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
10/04/2026Q01253123-P1Open ↗
08/17/2026Q01253123-I1Open ↗
08/17/2026Q01253123-S3Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
10/04/2026Q01253123-P1Open ↗
08/13/2026Q01253123-I1Open ↗
08/13/2026Q01253123-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01253123-S1Open ↗
08/13/2026Q01253123-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial3
10/04/2026Q01253123-P1Open ↗
08/21/2026Q01253123-S6Open ↗
08/13/2026Q01253123-I1Open ↗
▸DOB NOWProperty Ownership Certification2
10/04/2026Q01253123-P1Open ↗
08/17/2026Q01253123-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01253123-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01253123-S1Open ↗
▸DOB NOWExisting Sidewalk Photographs1
08/21/2026Q01253123-S6Open ↗