← Back
Factory, light manufacturing
48 COFFEY STREET
BROOKLYN · BIN 3339083
💬 Discuss this project
1931Year Built
1Stories
F5Building Class
M1-1Zoning
3,650 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: 48 AND 60 COFFEY STREET LLC · 7,500 sf lot · 0.49 FAR built · Flood zone AE
Locations of Work
Mechanical
Floor 15p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
48&60 COFFEY RLY CORP.103/22/2026
4860 COFFEE STREET RLT103/22/2026
48 & 60 COFFEY RLTY CORP.103/22/2026
O C CONSTRUCTION CO. I103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AZSK ARCHITECTS PC512/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PETER KLEIN ASSOC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P.S.I. MECHANICALPlumbing707/08/2026
JM CONSTRUCTION GROUP CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659110/19/2021
AGE ENGINEERING, LLC6695310/04/2021
Building Lifecycle
All (24)Filed (5)Permit Issued (2)Violation (8)Special Inspection (9)
09/08/2025
Violation issued (FDNY_ORDER, closed)
09/08/2025
Violation issued (FDNY_ORDER, closed)
03/21/2022
Permit issued — Mechanical Systems
B00596350-I1-MS
12/09/2021
Special inspection requirement — Mechanical Systems
ALBERTO ROMAN
12/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
12/09/2021
Special inspection requirement — Final
ALBERTO ROMAN
12/08/2021
Filed — Alteration
INSTALLATION OF HVAC DUCT, INSTALLATION OF KITCHEN EXHAUST HOOD DUCT AND BLOWER AND INSTALLATION OF FIRE SUPPRESSION SYSTEM FOR COMMERCIAL KITCHEN.
B00596350-P1
11/24/2021
Special inspection requirement — Final
11/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/24/2021
Special inspection requirement — Mechanical Systems
10/19/2021
Filed — Alteration
INSTALLATION OF HVAC DUCT, INSTALLATION OF KITCHEN EXHAUST HOOD DUCT AND BLOWER AND INSTALLATION OF FIRE SUPPRESSION SYSTEM FOR COMMERCIAL KITCHEN.
B00596350-I1
10/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
10/04/2021
Filed — Alteration
Installation of new exhaust hood and non residential cooking equipment. Installation of (2) non residential sinks. No change in use, occupancy or egress.
B00529343-P2
10/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
09/21/2021
Filed — Alteration
Installation of new exhaust hood and non residential cooking equipment. Installation of (2) non residential sinks. No change in use, occupancy or egress.
B00529343-P1
09/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
08/05/2021
Permit issued — Plumbing
B00529343-I1-PL
06/24/2021
Filed — Alteration
Installation of new exhaust hood and non residential cooking equipment. Installation of (2) non residential sinks. No change in use, occupancy or egress.
B00529343-I1
02/16/1995
Violation issued (ECB, closed)
Construction
03/18/1993
Violation issued (ECB, closed)
Construction
06/12/1992
Violation issued (ECB, closed)
Construction
01/26/1991
Violation issued (ECB, closed)
Construction
06/15/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
02/09/1990
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJM CONSTRUCTION GROUP COR03/21/2022
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL08/05/2021
BIS—ISSUEDBLANFORD CONSTRUCTION CO12/02/1996
1 project · most recent 12/08/2021
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/08/2021Permit IssuedJM CONSTRUCTION GROUP CORAir Conditioning Systems, Heating Systems
Cooling
International Comfort Products FAS120MAAA0A0AA 171,500 CFM · Furnace ×4
Heating
International Comfort Products E204316409 3 CFM · Electric Heater ×4
1 project · most recent 10/04/2021
Gas Water/Sanitary
FiledStatusContractorScope
10/04/2021Signed-offP.S.I. MECHANICALGas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/09/2021Mechanical SystemsALBERTO ROMANspecial
12/09/2021Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
12/09/2021FinalALBERTO ROMANprogress
11/24/2021Final—progress
11/24/2021Fire-Resistant Penetrations and Joints—special
11/24/2021Mechanical Systems—special
10/06/2021Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
10/04/2021Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
09/14/2021Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00529343-P1Request digital key ↗
09/01/2026B00529343-P2Request digital key ↗
09/01/2026B00529343-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00529343-P1Open ↗
09/01/2026B00529343-I1Open ↗
09/01/2026B00529343-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00529343-P2Open ↗
08/29/2026B00529343-P1Open ↗
08/26/2026B00596350-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B00596350-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00529343-P2Open ↗
09/01/2026B00529343-P1Open ↗
09/01/2026B00529343-I1Open ↗
Showing 3 of 5 on file for this type