← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 50 Orchard St Condominium
48 ORCHARD STREET · BIN 1003999
💬 Discuss this project
2003Year Built
10Stories
RMBuilding Class
C6-2Zoning
36,388 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 50 ORCHARD STREET CONDOMINIUM · 6,562 sf lot · 5.55 FAR built · Flood zone X
Locations of Work
Architecture
Floor 102p · 1 filing · 8 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
2 jobs · most recent 02/09/2023
General Wiring Lighting
FiledStatusContractorScope
02/09/2023CompleteY.S ELECTRICGeneral Wiring, Lighting
07/21/2022CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
Building Lifecycle
All (110)Filed (7)Permit Issued (12)Signed Off (7)Facade (FISP) (9)Violation (59)Inspection (3)Special Inspection (13)
01/14/2026
Cycle 10 facade report submitted
01/12/2026
Cycle 10 facade report signed — SAFE
11/19/2025
Cycle 10 facade inspection completed
06/02/2025
Signed off — Alteration
M01129126-I1
01/08/2025
Permit issued — Mechanical Systems
M01129126-I1-MS
12/06/2024
Filed — Alteration
M01129126-I1
11/12/2024
Signed off — Alteration
SPRINKLERS WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00774601-I1
10/25/2024
Signed off — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00774598-I1
10/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/18/2024
Special inspection requirement — Mechanical Systems
LOUIS ARENA
10/18/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/18/2024
Special inspection requirement — Final
LOUIS ARENA
10/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/17/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Signed off — Alteration
INTERIOR RENOVATION OF AN EXISTING APARTMENT ON THE 10TH FLOOR, MINOR PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00774593-I1
07/09/2024
Permit issued — Sprinklers
M00774601-I1-EW-SP
01/24/2024
Signed off — Alteration
Interior Plumbing work on existing apartment (unit 1C). No Change in use, Egress or Occupancy.
M00452326-I1
01/19/2024
Signed off — Alteration
M00454814-I1
01/09/2024
Signed off — Alteration
Mechanical modification to apartment unit 1C as per plans filed herewith. No change in use, egress or occupancy.
M00452388-I1
12/12/2023
Permit issued — Plumbing
M00452326-I1-PL
03/31/2023
Permit issued — Mechanical Systems
M00774598-I1-MS
03/31/2023
Permit issued — Sprinklers
M00774601-I1-EW-SP
01/23/2023
Permit issued — General Construction
M00774593-I1-GC
01/06/2023
Filed — Alteration
SPRINKLERS WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00774601-I1
01/06/2023
Filed — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00774598-I1
01/05/2023
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING APARTMENT ON THE 10TH FLOOR, MINOR PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00774593-I1
11/09/2022
Special inspection requirement — Lighting controls
Li Lian Tan
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MATTHEW DECONZO
11/09/2022
Special inspection requirement — Post-installed Anchors
Mario Mendoza Blanco
11/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Li Lian Tan
11/09/2022
Special inspection requirement — Lighting in dwelling units
Li Lian Tan
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mario Mendoza Blanco
07/13/2022
Special inspection requirement — Final
Mario Mendoza Blanco
07/13/2022
Special inspection requirement — Sprinkler Systems
MATTHEW DECONZO
02/18/2022
Cycle 9 facade report submitted
02/18/2022
Cycle 9 facade report signed — SAFE
02/09/2022
Cycle 9 facade inspection completed
09/08/2021
Permit issued — Structural
M00454814-I1-GC-CX
06/23/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/12/2021
Permit issued — Mechanical Systems
M00452388-I1-MS
04/15/2021
Permit issued — Plumbing
M00452326-I1-PL
03/30/2021
Permit issued — Plumbing
M00452326-I1-PL
03/25/2021
Permit issued — Structural
M00454814-I1-GC-CX
03/24/2021
Permit issued — Mechanical Systems
M00452388-I1-MS
01/29/2021
Filed — Alteration
Interior Plumbing work on existing apartment (unit 1C). No Change in use, Egress or Occupancy.
M00452326-I1
01/29/2021
Filed — Alteration
M00454814-I1
01/29/2021
Filed — Alteration
Mechanical modification to apartment unit 1C as per plans filed herewith. No change in use, egress or occupancy.
M00452388-I1
01/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/31/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2016
Cycle 8 facade report submitted
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8 X 8 CONSTRUCTION INC103/22/2026
THE 50 ORCHARD ST CONDO103/22/2026
50 ORCHARD ASSOC5003/22/2026
50 0RCHARD ASSOC LL103/22/2026
50 ORCHARD ASSOC LL103/22/2026
PATRIOT CONTRACTING103/22/2026
OWNER OF 48 ORCHARD ST203/22/2026
50 ORCHARD STREET1203/21/2026
50 ORCHARD ST ASSOC PARTNERS1003/21/2026
50 ORCHARD ASSOC.LLC403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING103/21/2026
J CALLAHAN CONSULTING603/21/2026
OUTSOURCE CONSULTANTS, INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LW INTERIOR REMODELING INGeneral Contractor1007/08/2026
HVAC EXPERTS, INCGeneral Contractor303/21/2026
M&G PLUMBING AND HEATINGPlumbing307/08/2026
PRECISION SPKLR SVCS LLCFire Protection207/08/2026
BECKMAN STUDIO DESIGN BUIGeneral Contractor107/08/2026
CALRAY GAS HEAT CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851112/06/2024
DM ENGINEERS PLLC6427201/06/2023
GUTH DECONZO CONSULTING E1210101/06/2023
OUTSOURCE SPECIAL INSPECT2827301/29/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCALRAY GAS HEAT CORP01/08/2025
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC07/09/2024
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING12/12/2023
DOB NOWMechanical SystemsSigned-offHVAC EXPERTS, INC03/31/2023
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC03/31/2023
DOB NOWGeneral ConstructionSigned-offBECKMAN STUDIO DESIGN BUI01/23/2023
DOB NOWStructuralSigned-offLW INTERIOR REMODELING IN09/08/2021
DOB NOWMechanical SystemsSigned-offLW INTERIOR REMODELING IN05/12/2021
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING04/15/2021
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING03/30/2021
DOB NOWStructuralSigned-offLW INTERIOR REMODELING IN03/25/2021
DOB NOWMechanical SystemsSigned-offLW INTERIOR REMODELING IN03/24/2021
BIS—ISSUEDCLARKE CONSTRUCTION OF LONG ISLA10/18/2016
BISPLISSUEDBMT PLUMBING&HEATING LLC12/16/2015
BISOTISSUEDSANTANA CONTRACTING CORP10/27/2015
BISPLISSUEDE.P. PLUMBING CO08/05/2015
BISOTISSUEDFEB GENERAL CONTRACTOR CO07/22/2015
BISMHISSUEDCLARKE CONSTRUCTION OF LO03/21/2013
BISSPISSUEDG.N.T. MECHANICAL, LLC11/21/2012
BISPLISSUEDG.N.T. MECHANICAL, LLC11/21/2012
BIS—ISSUEDCLARKE CONSTRUCTION OF LO05/29/2012
BISOTISSUEDCLARKE CONSTRUCTION OF LO01/19/2012
BISOTISSUEDCLARKE CONSTRUCTION OF LO01/19/2012
BIS—ISSUEDCLARKE CONSTRUCTION OF LO12/08/2011
BISPLISSUEDG.N.T. MECHANICAL, LLC11/17/2011
BISSPISSUEDG.N.T. MECHANICAL, LLC11/17/2011
BISOTISSUEDFLUX CONTRACTING, LLC08/02/2011
BISOTISSUEDSHERLOCK HOMES INTERIOR03/16/2010
BISOTISSUEDMICHAEL MUROFF ARCH. LLC03/30/2009
BISSDISSUEDG.N.T. MECHANICAL, LLC12/12/2008
BIS—ISSUEDHUDSON MERIDIAN CONSTRUCTION05/23/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/11/2008
BISEQISSUEDHUDSON MERIDIAN CONSTRUCTION01/11/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/08/2008
BISPLISSUEDG.N.T. MECHANICAL, LLC08/02/2007
BIS—ISSUEDHUDSON MERIDIAN CONSTRUCTION05/25/2007
BISSDISSUEDG.N.T. MECHANICAL, LLC04/16/2007
BISPLISSUEDG.N.T. MECHANICAL, LLC04/16/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/11/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/22/2007
+ 22 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/18/2024Mechanical SystemsLOUIS ARENAspecial
10/18/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
10/18/2024FinalLOUIS ARENAprogress
10/18/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
11/09/2022Lighting controlsLi Lian Tanenergy_progress
11/09/2022Fire-Resistant Penetrations and JointsMATTHEW DECONZOspecial
11/09/2022Post-installed AnchorsMario Mendoza Blancospecial
11/09/2022Energy Code Compliance InspectionsLi Lian Tanprogress
11/09/2022Lighting in dwelling unitsLi Lian Tanenergy_progress
11/09/2022Fire-Resistant Penetrations and JointsMario Mendoza Blancospecial
07/13/2022FinalMario Mendoza Blancoprogress
07/13/2022Sprinkler SystemsMATTHEW DECONZOspecial
01/13/2021Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
▾Documents — 244 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
09/01/2026M00774593-I1Request digital key ↗
09/01/2026M00774601-I1Request digital key ↗
09/01/2026M00774598-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00452326-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00452388-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00454814-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00454814-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION17
09/14/2016122887705Open ↗
04/29/2016140373129Open ↗
04/01/2016140373129Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION16
10/21/2016122887705Open ↗
01/08/2016140373129Open ↗
11/12/2015140373129Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/27/2016122887705Open ↗
10/26/2012120504294Open ↗
▸Seals & Professional Certifications59
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
05/17/2017140373129Open ↗
05/17/2017140373129Open ↗
05/17/2017140373129Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/04/2026M00454814-I1Open ↗
09/04/2026M00452326-I1Open ↗
09/01/2026M00774593-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/14/2016122887705Open ↗
04/29/2016140373129Open ↗
04/25/2012121048598Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026M01129126-I1Open ↗
08/25/2026M00774593-I1Open ↗
08/25/2026M00774593-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026M01129126-I1Open ↗
08/27/2026M00774601-I1Open ↗
08/27/2026M00774601-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
04/25/2012121048598Open ↗
07/11/2011120751203Open ↗
05/26/2011120699869Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/14/2016122887705Open ↗
07/08/2015140373129Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/08/2015140373129Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/08/2015140373129Open ↗
▸Trade Schedules & Equipment19
▸BISSELF-CERT PLUMBING NOTICE7
06/12/2013120790769Open ↗
05/14/2013120790769Open ↗
05/09/2013120790769Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING6
07/08/2015140373129Open ↗
05/21/2013120790769Open ↗
02/15/2013120790769Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS2
01/09/2017140373129Open ↗
05/05/2016140373129Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
05/08/2013120790769Open ↗
05/08/2013120790769Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/05/2016140373129Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/05/2016122887705Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/04/2026M00454814-I1Open ↗
09/04/2026M00452326-I1Open ↗
09/01/2026M00774593-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
08/23/2011120790769Open ↗
08/11/2011120751203Open ↗
10/25/2010120504294Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
04/25/2012121048598Open ↗
05/26/2011120699869Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/08/2015140373129Open ↗
▸Energy Compliance18
▸BISAS-BUILT ENERGY ANALYSIS5
05/17/2017140373129Open ↗
01/09/2017140373129Open ↗
06/05/2013120790769Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/17/2017140373129Open ↗
01/09/2017140373129Open ↗
09/14/2016122887705Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
08/23/2011120790769Open ↗
07/11/2011120751203Open ↗
06/20/2011120699869Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00452388-I1Open ↗
08/13/2026M00454814-I1Open ↗
▸BISNYCECC ANALYSIS1
07/08/2015140373129Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/08/2015140373129Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/08/2015140373129Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00774598-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/08/2015140373129Open ↗
▸Approvals, Objections & Sign-offs39
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
10/27/2017122887705Open ↗
09/26/2017122887705Open ↗
09/26/2017122887705Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
04/25/2012121048598Open ↗
08/23/2011120790769Open ↗
07/11/2011120751203Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/17/2017140373129Open ↗
01/09/2017140373129Open ↗
11/12/2015140373129Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
09/14/2016122887705Open ↗
02/25/2011120504294Open ↗
10/25/2010120504294Open ↗
▸BISSUPERSEDING LETTER2
01/08/2016140373129Open ↗
11/12/2015140373129Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
12/08/2016122887705Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
05/17/2017140373129Open ↗
01/09/2017140373129Open ↗
09/14/2016122887705Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION13
09/29/2017122887705Open ↗
11/10/2016122887705Open ↗
04/29/2016140373129Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET9
09/14/2016122887705Open ↗
04/25/2012121048598Open ↗
08/23/2011120790769Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
10/27/2017122887705Open ↗
09/26/2017122887705Open ↗
09/26/2017122887705Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/08/2015140373129Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/25/2012121048598Open ↗
02/03/2011120504294Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
07/08/2015140373129Open ↗
▸BISPLOT DIAGRAM1
09/14/2016122887705Open ↗