Two stories - detached, small or mid-size
48 SYLVIA STREET
STATEN ISLAND · BIN 5073862
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3-2Zoning
2,336 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 1Relocate concrete curb cut18p · 2 filings · 20 docs
Cellar15p · 1 filing · 20 docs
Site & exterior2p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Think Design Architecture702/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Think Design Architecture403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Raise the Roof GCGeneral Contractor407/08/2026
Raise the Roof GCScaffold303/21/2026
V & M Drain CleaningPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Think Design Architectura683302/11/2022
Building Lifecycle
10/21/2022
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION IS FILED FOR PLUMBING WORK ONLY AS ASSOCIATED TO ENLARGEMENT OF EXISTING TWO-STORY ONE FAMILY RESIDENCE.. ALL WORK AS PER PLANS IS SUBMITTED HEREWITH.
S00547285-I1
05/09/2022
Signed off — Alteration
S00547670-I1
05/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/28/2022
Permit issued — Curb Cut
S00547670-I1-CC
54 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offRaise the Roof GC04/28/2022
DOB NOWPlumbingSigned-offV & M Drain Cleaning01/22/2022
DOB NOWGeneral ConstructionPermit IssuedRaise the Roof GC12/02/2021
DOB NOWConstruction FenceSigned-offRaise the Roof GC10/19/2021
BISOTISSUEDVenture Home Solar06/29/2023
1 project · most recent 02/11/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/11/2022Signed-offV & M Drain CleaningGas, Storm, Water/Sanitary
2 projects · most recent 06/28/2023
General Wiring
FiledStatusContractorScope
06/28/2023CompleteVenture Home Solar—
01/19/2022CompleteCJC ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
04/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
03/02/2022HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
03/02/2022Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
03/02/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
03/02/2022Maintenance informationFrank Martarella IIIenergy_progress
03/02/2022HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
03/02/2022HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
03/02/2022Permanent certificateFrank Martarella IIIenergy_progress
02/08/2022Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
02/08/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
02/08/2022HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
02/08/2022Maintenance informationFrank Martarella IIIenergy_progress
02/08/2022HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
02/08/2022HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
02/08/2022Permanent certificateFrank Martarella IIIenergy_progress
10/21/2021Air barrier continuity plan testing—energy_progress
10/21/2021Air barrier - visual inspection—energy_progress
10/21/2021Concrete - Cast-In-Place—special
10/21/2021Electric vehicle service equipment requirements—energy_progress
10/21/2021Air barrier — testing —energy_progress
10/21/2021Fenestration areas—energy_progress
10/21/2021Fire-Resistant Penetrations and Joints—special
10/21/2021Structural Stability – Alterations of existing buildings—special
10/21/2021Subgrade Inspections—special
10/21/2021Subsurface Investigations (Borings/Test Pits)—special
10/21/2021Energy Code Compliance Inspections—progress
Latest 25 of 32.