← Back
Multi-story retail building (2+)
480 86 STREET
BROOKLYN · BIN 3153550
💬 Discuss this project
1923Year Built
3Stories
K2Building Class
C4-2AZoning
3,420 sfGross Floor Area
1Units
7 Open Violations 5 unresolved · 2 paperwork only ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: PRIME 86 HOLDINGS LLC · 1,540 sf lot · 2.22 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Floor 32p · 2 filings · 20 docs
Floor 2
Floor 13p · 1 filing · 16 docs
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JOHN PSARAS REALTY MGMT2007/08/2026
TOPLINE NYC CONTRACTING307/08/2026
C & M BARGAIN CENTER INC.103/22/2026
NOTHING FITS INC103/22/2026
D R P ELECTRICAL CONTRACTING103/22/2026
PRIME 86 HOLDINGS1003/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2017$4.0M—MAGNIFICENT SEVEN BOUTIQUE INC. → PRIME 86 HOLDINGS LLC$1,170/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE104/26/2023
FREDERICK J GOGLIA204/13/2023
NEW YORK DESIGN ARCHITECTS, LLP703/14/2023
ASHRAF CORP106/24/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARHICTECTS1403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
BUILDING BROTHERS203/21/2026
THINK DESIGN ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTONIO J BOCASGeneral Contractor407/08/2026
HYDRO TECH MECHANICAL CORPPlumbing307/08/2026
PLM ELECTRIC LLCElectrical203/22/2026
MACCARONE PLUMBING INCPlumbing107/08/2026
D.R.P. ELEC'L CONTRG INCElectrical103/22/2026
R G M SIGNSScaffold107/08/2026
QUALITY CONSTRUCTION& DEVGeneral Contractor107/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738204/13/2023
THINK DESIGN ARCHITECTURA683204/13/2023
AKS ARCHITECTURAL & ENGIN1957403/14/2023
Building Lifecycle
All (72)Filed (11)Permit Issued (9)Signed Off (8)Violation (10)Inspection (4)Special Inspection (30)
07/07/2023
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (THE VITAMIN SHOPPE)
B00853081-I1
06/29/2023
Signed off — Alteration
Interior alteration of existing retail space for removal and replacement of non-bearing partitions, finishes, fixtures, etc. No change in use, egress or occupancy.
B00843265-S1
06/29/2023
Signed off — Alteration
Interior alteration of existing retail space for removal and replacement of non-bearing partitions, finishes, fixtures, etc. No change in use, egress or occupancy.
B00843265-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/14/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2023
Permit issued — Plumbing
B00843265-S1-PL
05/05/2023
Permit issued — General Construction
B00843265-I1-GC
04/27/2023
Permit issued — Sign
B00853081-I1-SG
04/26/2023
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (THE VITAMIN SHOPPE)
B00853081-I1
04/25/2023
Special inspection requirement — Interior lighting power
Frank Martarella III
04/25/2023
Special inspection requirement — Lighting controls
Frank Martarella III
04/13/2023
Filed — Alteration
Interior alteration of existing retail space for removal and replacement of non-bearing partitions, finishes, fixtures, etc. No change in use, egress or occupancy.
B00843265-S1
04/13/2023
Filed — Alteration
Interior alteration of existing retail space for removal and replacement of non-bearing partitions, finishes, fixtures, etc. No change in use, egress or occupancy.
B00843265-I1
04/13/2023
Signed off — Alteration
CAP/REMOVE PLUMBING FIXTURES AT FIRST FLOOR COMMERICAL SPACE AS NOTED ON PLANS. NO CHANGE OT USE,K EGRESS, OR OCCUPANCY.
B00823111-S1
04/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
04/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
04/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
anthony santoro
04/10/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/05/2023
Permit issued — Plumbing
B00823111-S1-PL
03/31/2023
Special inspection requirement — Final
LEON SKVIRSKY
03/26/2023
Special inspection requirement — Tenant Protection Plan Compliance
anthony santoro
03/14/2023
Filed — Alteration
CAP/REMOVE PLUMBING FIXTURES AT FIRST FLOOR COMMERICAL SPACE AS NOTED ON PLANS. NO CHANGE OT USE,K EGRESS, OR OCCUPANCY.
B00823111-S1
03/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
03/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
03/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
03/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Smerina
03/13/2023
Special inspection requirement — Final
Frank Martarella III
03/07/2023
Filed — Alteration
CAP/REMOVE PLUMBING FIXTURES AT FIRST FLOOR COMMERICAL SPACE AS NOTED ON PLANS. NO CHANGE OT USE,K EGRESS, OR OCCUPANCY.
B00823111-I1
03/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Smerina
02/02/2023
Special inspection requirement — Final
Joseph Smerina
07/01/2021
Signed off — Alteration
replace/repair existing kitchen and bath fixtures, install new washer and floor and water heaters
B00204038-I1
06/17/2021
Signed off — Alteration
APPLICATION FILED TO INSTALL AIR CONDITIONING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B00203990-I1
06/07/2021
Permit issued — Plumbing
B00204038-I1-PL
03/18/2021
Special inspection requirement — Maintenance information
REZA KHAMCY
03/18/2021
Special inspection requirement — HVAC and service water heating system controls
REZA KHAMCY
03/18/2021
Special inspection requirement — Electrical motors
Joseph Smerina
03/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Joseph Smerina
03/18/2021
Special inspection requirement — HVAC and service water heating system controls
Joseph Smerina
03/18/2021
Special inspection requirement — HVAC and service water heating equipment
Joseph Smerina
03/18/2021
Special inspection requirement — Duct leakage testing
REZA KHAMCY
03/18/2021
Special inspection requirement — Shutoff dampers
Joseph Smerina
03/18/2021
Special inspection requirement — HVAC and service water heating equipment
REZA KHAMCY
03/18/2021
Special inspection requirement — Final
Joseph Smerina
03/18/2021
Special inspection requirement — Mechanical Systems
REZA KHAMCY
03/18/2021
Special inspection requirement — HVAC insulation and sealing
REZA KHAMCY
03/18/2021
Special inspection requirement — Permanent certificate
REZA KHAMCY
03/16/2021
Filed — Alteration
replace/repair existing kitchen and bath fixtures, install new washer and floor and water heaters
B00204038-P1
03/16/2021
Filed — Alteration
APPLICATION FILED TO INSTALL AIR CONDITIONING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B00203990-P1
03/11/2021
Special inspection requirement — HVAC and service water heating system controls
Joseph Smerina
03/11/2021
Special inspection requirement — HVAC and service water heating equipment
Joseph Smerina
03/11/2021
Special inspection requirement — Energy Code Compliance Inspections
Joseph Smerina
03/03/2020
Signed off — Alteration
B00186310-I1
12/30/2019
Filed — Alteration
APPLICATION FILED TO INSTALL AIR CONDITIONING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B00203990-I1
12/30/2019
Permit issued — Mechanical Systems
B00203990-I1-MS
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/2019
Signed off — Alteration
B00182275-I1
08/16/2019
Permit issued — Plumbing
B00204038-I1-PL
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC05/30/2023
DOB NOWGeneral ConstructionSigned-offQUALITY CONSTRUCTION& DEV05/05/2023
DOB NOWSignSigned-offR.G.M. SIGNS INC04/27/2023
DOB NOWPlumbingSigned-offHYDRO TECH MECHANICAL CORP04/05/2023
DOB NOWPlumbingSigned-offHYDRO TECH MECHANICAL CORP06/07/2021
DOB NOWMechanical SystemsSigned-offANTONIO J BOCAS12/30/2019
DOB NOWPlumbingSigned-offHYDRO TECH MECHANICAL CORP08/16/2019
DOB NOWConstruction FenceSigned-offANTONIO J BOCAS07/26/2019
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING06/24/2019
BISOTISSUEDANTONIO J BOCAS08/13/2019
BISOTISSUEDBRISCO BUILDERS INC08/02/2019
1 project · most recent 03/14/2023
Water/Sanitary
FiledStatusContractorScope
03/14/2023Signed-offHYDRO TECH MECHANICAL CORWater/Sanitary
8 projects · most recent 07/02/2023
General Wiring
FiledStatusContractorScope
07/02/2023Permit IssuedPLM ELECTRIC LLCGeneral Wiring
07/02/2023Permit IssuedPLM ELECTRIC LLCGeneral Wiring
06/30/2023CompletePLM ELECTRIC LLCGeneral Wiring
05/19/2023CompleteD.R.P. ELEC'L CONTRG INC—
01/08/2020CompleteALL AROUND ELECTRIC CORP.General Wiring
07/22/2019Permit IssuedPLM ELECTRIC LLC5 meters, 5 new_meters
06/24/2019CompleteRICHARD NEU—
06/21/2019CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
04/25/2023Interior lighting powerFrank Martarella IIIenergy_progress
04/25/2023Lighting controlsFrank Martarella IIIenergy_progress
04/13/2023Energy Code Compliance InspectionsFrank Martarella IIIprogress
04/13/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
04/13/2023Tenant Protection Plan Complianceanthony santorospecial
03/31/2023FinalLEON SKVIRSKYprogress
03/26/2023Tenant Protection Plan Complianceanthony santorospecial
03/14/2023Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
03/14/2023Energy Code Compliance InspectionsFrank Martarella IIIprogress
03/14/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
03/13/2023Tenant Protection Plan ComplianceJoseph Smerinaspecial
03/13/2023FinalFrank Martarella IIIprogress
03/03/2023Tenant Protection Plan ComplianceJoseph Smerinaspecial
02/02/2023FinalJoseph Smerinaprogress
03/18/2021Maintenance informationREZA KHAMCYenergy_progress
03/18/2021HVAC and service water heating system controls REZA KHAMCYenergy_progress
03/18/2021Electrical motorsJoseph Smerinaenergy_progress
03/18/2021Energy Code Compliance InspectionsJoseph Smerinaprogress
03/18/2021HVAC and service water heating system controls Joseph Smerinaenergy_progress
03/18/2021HVAC and service water heating equipment Joseph Smerinaenergy_progress
03/18/2021Duct leakage testing REZA KHAMCYenergy_progress
03/18/2021Shutoff dampersJoseph Smerinaenergy_progress
03/18/2021HVAC and service water heating equipment REZA KHAMCYenergy_progress
03/18/2021FinalJoseph Smerinaprogress
03/18/2021Mechanical SystemsREZA KHAMCYspecial
Latest 25 of 30.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch5
08/27/2026B00823111-I1Request digital key ↗
08/27/2026B00823111-S1Request digital key ↗
08/27/2026B00843265-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00204038-I1Request digital key ↗
08/15/2026B00204038-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00203990-I1Request digital key ↗
08/15/2026B00203990-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00186310-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00182275-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
07/29/2019340684824Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/28/2019340684824Open ↗
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/15/2019340684824Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026B00204038-P1Open ↗
09/02/2026B00204038-P1Open ↗
09/02/2026B00204038-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00843265-S1Open ↗
08/27/2026B00843265-I1Open ↗
08/13/2026B00203990-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026B00203990-I1Open ↗
08/28/2026B00823111-S1Open ↗
08/26/2026B00843265-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
06/26/2019340684824Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
06/26/2019340684824Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
06/26/2019340684824Open ↗
▸Trade Schedules & Equipment5
▸BISEQUIPMENT USE PERMITS2
01/22/2021340684824Open ↗
07/27/2020340684824Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/28/2019340684824Open ↗
▸BISSCHEDULE B - PLUMBING1
06/26/2019340684824Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/27/2020340684824Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00186310-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00843265-I1Open ↗
08/27/2026B00843265-S1Open ↗
08/13/2026B00823111-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
06/26/2019340684824Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/30/2021340691585Open ↗
07/17/2020340684824Open ↗
08/12/2019340691585Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
06/26/2019340684824Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/30/2021340691585Open ↗
07/17/2020340684824Open ↗
▸BISNYCECC ANALYSIS2
08/12/2019340691585Open ↗
06/26/2019340684824Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
04/30/2021340691585Open ↗
04/30/2021340691585Open ↗
07/17/2020340684824Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/30/2021340691585Open ↗
07/27/2020340684824Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/30/2021340691585Open ↗
07/27/2020340684824Open ↗
08/12/2019340691585Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
03/12/2021340691585Open ↗
07/29/2020340691585Open ↗
08/22/2019340684824Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
08/12/2019340691585Open ↗
08/01/2019340690746Open ↗
06/26/2019340684824Open ↗