← Back
Public elementary, junior or senior high
P.S. 208 Elsa Ebeling
4801 AVENUE D · BIN 3105680
💬 Discuss this project
1926Year Built
3Stories
W1Building Class
R4Zoning
53,360 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 1 unresolved · 7 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 80,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction27p · 3 filings · 20 docs
Floor 3Under Construction9p · 1 filing · 20 docs
Floor 2Under Construction9p · 2 filings · 20 docs
Floor 1Under Construction11p · 3 filings · 20 docs
Mezzanine1p · 1 filing · 13 docs
CellarUnder Construction5p · 2 filings · 20 docs
Sub-BasementUnder Construction11p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY PUBLIC SCHOOL109/13/2026
AMERESCO108/20/2026
NYC SCHOOL CONSTRUCTION AUTHORITY4607/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION403/22/2026
DEPT. OF EDUCATION PS 208603/22/2026
D.O.E PS 208603/22/2026
DOE 040203/22/2026
DOE PS 208Q 040103/22/2026
P.S.208 D.O.E.803/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHENOY ENGINEERING P C803/21/2026
DI DOMENICO + PARTNERS1003/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AWL INDUSTRIES INCGeneral Contractor2307/08/2026
WAYNE HAMILTONElectrical303/21/2026
CHAYUT, ALLENElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
FRANK MERESHENSKYElectrical103/21/2026
G.S.H. ELECTRIC INC.Electrical103/22/2026
JAMES MAGRIPLESElectrical103/21/2026
LUPINSKI, MAREKElectrical103/21/2026
MAGRIPLES JAMESElectrical103/21/2026
PHILIP MISHENElectrical103/21/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
ABSOLUTE ELEC'L CONTRG OFElectrical103/22/2026
SUNKEEPER SOLAR ELECTRICGeneral Contractor108/20/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOMERUN SOLAR8772108/18/2026
JPC LOGISTICS DBA JPCL EN351308/07/2026
TWIN PEAKS INC.317709/30/2024
Building Lifecycle
All (159)Filed (22)Permit Issued (20)Signed Off (2)Violation (60)Inspection (3)Objection (22)Special Inspection (30)
08/19/2026
Permit issued — Solar
B01430929-I1-SL
08/18/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY.
B01430929-I1
08/07/2026
Filed — Alteration
REMOVE EXISTING VOLUME DAMPER AND CAP AND SEAL EXISITNG EXHAUST DUCT AS INDICATED ON PLANS. CONNECT NEW EXHAUST DUCTS TO EXISTING RISERS AND EXTEND DUCTS TO NEW WALL AS INDICATED ON THE PLANS. PROVIDE 2 NEW WINDOWS AC'S AND 4 NEW EXHAUST GRILLES.
B01440061-I1
08/07/2026
Filed — Alteration
REMOVE EXISTING VOLUME DAMPER AND CAP AND SEAL EXISITNG EXHAUST DUCT AS INDICATED ON PLANS. CONNECT NEW EXHAUST DUCTS TO EXISTING RISERS AND EXTEND DUCTS TO NEW WALL AS INDICATED ON THE PLANS. PROVIDE 2 NEW WINDOWS AC'S AND 4 NEW EXHAUST GRILLES.
B01440061-S1
08/07/2026
Special inspection requirement — Maintenance information
Asma Hashmi
08/07/2026
Special inspection requirement — Interior lighting power
Asma Hashmi
08/07/2026
Special inspection requirement — Lighting controls
Asma Hashmi
08/03/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/03/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/03/2026
Special inspection requirement — Final
Asma Hashmi
08/03/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/03/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Asma Hashmi
08/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
Asma Hashmi
08/03/2026
Special inspection requirement — Final
Asma Hashmi
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Asma Hashmi
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
07/14/2026
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND PANCHARI
07/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAYMOND PANCHARI
07/14/2026
Special inspection requirement — Final
RAYMOND PANCHARI
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND PANCHARI
07/14/2026
Special inspection requirement — Air barrier - visual inspection
RAYMOND PANCHARI
06/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/24/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2026
Permit issued — Mechanical Systems
B00491884-I1-MS
06/15/2026
Permit issued — Structural
B00491884-S2-ST
06/15/2026
Permit issued — Construction Fence
B00964935-I1-FN
06/15/2026
Permit issued — General Construction
B00491884-S1-GC
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/11/2026
Filed — Alteration
HVAC related to ADA PROJECT TO PROVIDE ACCESSIBILITY TO EVERY FLOOR AND ADA TOILETS - NEW ELEVATOR AND TOILET ROOMS
B01337736-S6
03/11/2026
Objection resolved — Addressed
03/10/2026
Special inspection requirement — Standpipe Systems
03/10/2026
Special inspection requirement — Subgrade Inspections
03/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tommy Maene
03/10/2026
Special inspection requirement — Sprayed fire-resistant materials
03/10/2026
Special inspection requirement — Post-installed Anchors
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/10/2026
Special inspection requirement — Sprinkler Systems
02/17/2026
Objection raised — Other
02/17/2026
Objection raised — Other
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/06/2026
Violation issued (FDNY_NOV, closed)
02/03/2026
Filed — Alteration
K208- REPLACE ROOF & AREA DRAINS WITH NEW & PROVIDE NEW BACKWATER VALVE.
B01321382-S2
02/03/2026
Filed — Alteration
K208- REPLACE ROOF & AREA DRAINS WITH NEW & PROVIDE NEW BACKWATER VALVE.
B01321382-I1
02/03/2026
Special inspection requirement — Masonry
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNKEEPER SOLAR ELECTRIC08/19/2026
DOB NOWMechanical SystemsPermit IssuedAWL INDUSTRIES INC06/15/2026
DOB NOWStructuralPermit IssuedAWL INDUSTRIES INC06/15/2026
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC06/15/2026
DOB NOWGeneral ConstructionPermit IssuedAWL INDUSTRIES INC06/15/2026
DOB NOWGeneral ConstructionPermit IssuedAWL INDUSTRIES INC06/13/2025
DOB NOWStructuralPermit IssuedAWL INDUSTRIES INC06/13/2025
DOB NOWMechanical SystemsPermit IssuedAWL INDUSTRIES INC06/13/2025
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC06/13/2025
DOB NOWSidewalk ShedSigned-offAWL INDUSTRIES INC01/15/2025
DOB NOWSupported ScaffoldSigned-offAWL INDUSTRIES INC10/08/2024
DOB NOWStructuralPermit IssuedAWL INDUSTRIES INC06/14/2024
DOB NOWMechanical SystemsPermit IssuedAWL INDUSTRIES INC06/14/2024
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC06/14/2024
DOB NOWGeneral ConstructionPermit IssuedAWL INDUSTRIES INC06/14/2024
DOB NOWStructuralPermit IssuedAWL INDUSTRIES INC01/19/2024
DOB NOWMechanical SystemsPermit IssuedAWL INDUSTRIES INC01/18/2024
DOB NOWGeneral ConstructionPermit IssuedAWL INDUSTRIES INC01/18/2024
DOB NOWSidewalk ShedSigned-offAWL INDUSTRIES INC01/03/2024
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC12/26/2023
BISOTISSUEDKOKO CONTRACTING INC05/18/2018
BISOTISSUEDKOKO CONTRACTING INC05/18/2018
BISOTISSUEDKOKO CONTRACTING INC06/01/2017
BISOTISSUEDKOKO CONTRACTING INC06/01/2017
BISEQISSUEDKOKO CONTRACTING INC05/08/2017
BISEQISSUEDN.B.A CONSTRUCTION INC04/17/2017
BISEQISSUEDN.B.A CONSTRUCTION INC04/10/2017
BISEQISSUEDKOKO CONTRACTING INC03/31/2017
BISOTISSUEDCOMMERCE ELECTRICAL CONTR03/03/2017
BISOTISSUEDA.S.C CONTRACTING CORP06/03/2016
BISOTISSUEDKOKO CONTRACTING INC05/25/2016
BISOTISSUEDKOKO CONTRACTING INC05/25/2016
BISPLISSUEDVARSITY PLBG AND HTG INC05/05/2016
BISOTISSUEDKOKO CONTRACTING INC04/29/2016
BISOTISSUEDKOKO CONTRACTING INC04/29/2016
BISEQISSUEDKOKO CONTRACTING INC04/28/2016
BISEQISSUEDN.B.A CONSTRUCTION INC04/20/2016
BISEQISSUEDN.B.A CONSTRUCTION INC04/08/2016
BISOTISSUEDCOMMERCE ELECTRICAL CONTR02/18/2016
BISPLISSUEDVARSITY PLBG AND HTG INC05/12/2015
+ 30 more permits on file
1 project · most recent 03/11/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg KNSAP361A 34,000 BTU · Vrf Indoor ×1
KUSAP361A 34,000 BTU · Vrf Outdoor ×1
Heating
Indeeco 922IC-3502201FF1R20S000L-W 2 kW · Electric Heater ×13
Ventilation
Berner AI08-F-1042E-1-042E-X 1,134 CFM · Air Curtain ×1
Daikin DPS003A 700 CFM · Doas ×1
2 projects · most recent 03/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/11/2026——Storm, Water/Sanitary
02/03/2026——Storm
19 projects · most recent 08/27/2026
General Wiring Lighting
FiledStatusContractorScope
08/27/2026Permit IssuedA & S ELECTRIC INC.General Wiring
08/21/2026Permit IssuedKANTA ELECTRIC CORP.General Wiring
07/10/2026Permit IssuedSUNKEEPER SOLAR ELECTRIC LLC—
11/18/2025Permit IssuedABSOLUTE ELEC'L CONTRG OFLighting
06/25/2025CompleteEVEREST ELECTRIC CORP—
06/10/2025CompleteAMERICAN ENG ELECL SVCS IGeneral Wiring
01/23/2025Permit IssuedA & S ELECTRIC INC.General Wiring
08/14/2024CompleteA & S ELECTRIC INC.—
07/22/2024Permit IssuedP & M ELECT'L CONTR. CORP—
04/04/2024Permit IssuedRNW ELECTRIC CORPGeneral Wiring
03/13/2024Permit IssuedRNW ELECTRIC CORPGeneral Wiring
01/02/2024Permit IssuedRNW ELECTRIC CORP—
01/25/2023CompleteCHARAN ELEC'L ENTERP'S IN—
11/04/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
08/19/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
2 projects · most recent 03/11/2026
Steel Concrete
FiledStatusContractorScope
03/11/2026——Steel, Concrete
02/03/2026——1 scope_items
1 project · most recent 08/18/2026
FiledStatusContractorScope
08/18/2026Permit IssuedSUNKEEPER SOLAR ELECTRIC LLC598 panels, 361.78 kw, 7,475 roof_area_sqft
1 project · most recent 12/01/2023
Fence
FiledStatusContractorScope
12/01/2023Permit IssuedAWL INDUSTRIES INCFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/24/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
08/07/2026Maintenance informationAsma Hashmienergy_progress
08/07/2026Interior lighting powerAsma Hashmienergy_progress
08/07/2026Lighting controlsAsma Hashmienergy_progress
08/03/2026Post-installed AnchorsAsma Hashmispecial
08/03/2026Fire-Resistance Rated ConstructionAsma Hashmiprogress
08/03/2026Duct leakage testing, insulation and designAsma Hashmienergy_progress
08/03/2026Energy Code Compliance InspectionsAsma Hashmiprogress
08/03/2026FinalAsma Hashmiprogress
08/03/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/03/2026Post-installed AnchorsAsma Hashmispecial
08/03/2026FinalAsma Hashmiprogress
08/03/2026Energy Code Compliance InspectionsAsma Hashmiprogress
08/03/2026Mechanical SystemsAsma Hashmispecial
08/03/2026Exhaust and Vent Systems in Plenums and DuctsAsma Hashmispecial
07/14/2026Fire-Resistant Penetrations and JointsRAYMOND PANCHARIspecial
07/14/2026Air barrier - visual inspectionRAYMOND PANCHARIenergy_progress
07/14/2026FinalRAYMOND PANCHARIprogress
07/14/2026Energy Code Compliance InspectionsRAYMOND PANCHARIprogress
07/14/2026Structural Stability – Alterations of existing buildingsRAYMOND PANCHARIspecial
03/10/2026Standpipe Systems—special
03/10/2026Sprinkler Systems—special
03/10/2026Post-installed Anchors—special
03/10/2026Fire-Resistant Penetrations and Joints—special
03/10/2026Subsurface Investigations (Borings/Test Pits)Tommy Maenespecial
03/10/2026Subgrade Inspections—special
Latest 25 of 75.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00574347-I1Request digital key ↗
08/26/2026B00491884-P3Request digital key ↗
08/26/2026B00491884-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00574347-I1Open ↗
08/26/2026B00491884-P2Open ↗
08/26/2026B00491884-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00491884-P3Open ↗
08/28/2026B00491884-S1Open ↗
08/28/2026B00968174-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00491884-P3Open ↗
08/28/2026B00491884-S1Open ↗
08/27/2026B00491884-S2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B00968174-I1Open ↗
08/13/2026B00964935-I1Open ↗
08/13/2026B00968169-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026B01430929-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01337736-S1Open ↗
▸Approvals, Objections & Sign-offs34
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/01/2026B00574347-I1Open ↗
08/26/2026B00491884-P2Open ↗
08/26/2026B00491884-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/16/2026B01440061-S1Open ↗
08/16/2026B01440061-I1Open ↗
08/13/2026B00968169-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/26/2026B00491884-I1Open ↗
08/26/2026B00491884-S2Open ↗
08/26/2026B00491884-S1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B01321382-S2Open ↗
08/13/2026B01321382-I1Open ↗
▸Other Documents20
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal19
08/13/2026B00491884-P2Open ↗
08/13/2026B00491884-S1Open ↗
08/13/2026B00491884-P3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026B01321382-I1Open ↗