← Back
Two stories - detached, small or mid-size
4805 AVENUE L
BROOKLYN · Flatlands · BIN 3217634
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-2Zoning
1,216 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,600 sf lot · 0.47 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/15/2023
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Objection (4)Special Inspection (5)
01/09/2024
Permit issued — Solar
B00973414-I1-SL
12/28/2023
Objection resolved — Addressed
12/28/2023
Objection resolved — Addressed
12/19/2023
Objection raised — Other
12/19/2023
Objection raised — Scope
12/15/2023
Filed — Alteration
Installation of solar panels; Rooftop, Grid tied, Railed, 8 Panels, 3.2 KW
B00973414-I1
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/07/2023
Special inspection requirement — Final
Mina Makar
12/07/2023
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR01/09/2024
BISOTISSUEDOWNER05/16/1994
1 project · most recent 12/06/2023
FiledStatusContractorScope
12/06/2023CompleteISLAND ELECTRIC CORP—
1 project · most recent 12/15/2023
FiledStatusContractorScope
12/15/2023Signed-offMOMENTUM SOLAR8 panels, 3.2 kw, 141 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/07/2023Fire-Resistant Penetrations and JointsMina Makarspecial
12/07/2023Structural Stability – Alterations of existing buildingsMina Makarspecial
12/07/2023Energy Code Compliance InspectionsMina Makarprogress
12/07/2023FinalMina Makarprogress
12/07/2023Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026B00973414-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00973414-I1Open ↗
08/28/2026B00973414-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/26/2026B00973414-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00973414-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026B00973414-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00973414-I1Open ↗